Post Job Free
Sign in

Low Voltage Access Control

Location:
South Bend, IN
Salary:
14.00
Posted:
August 16, 2025

Contact this candidate

Resume:

Yesenia rivera

OSHA ** osha **

Electrical tdlr Apprintece Texas

Electrician with over 6 years of experience

PROFESSIONAL EXPERIENCE:

GAYLOR

ELECTRIC: (05-2018)

Helper

•Terminal panels.

•All types/size pipe bending.

•Read blue prints.

•Lihgting lead.

•In charge of all power.

•Terminals of cable from 250-750.

•Access control CCTV.

•Installation of transformers, as well as to make terminal tranformers. •Low voltage tech.

• Fire alarm tech.

DELTA ELECTRIC (06-2019)

Helper

•Terminal panels.

•All types/size pipe bending. •Read blue prints.

•Lihgting lead.

•In charge of all power. •Terminals of cable from 250-750. •Access control CCTV. •Installation of transformers

Control services company

electrical technician •HVAC controls. •Fire alarm.

GAYLOR ELECTRIC. (08-2020)

Apprentice

• Installation of SWICHGEARS, PDU, PANELS.

• Crimp connector for wires 500 MCM for SWICHGEARS.

• Megger wires after run the wires for High Voltage

• Run Emt pipe different site.

• Run low voltage wire for receptacles, Swichgears, Air Handlers.

TRANDESMA (04-2021)

Apprentice

• Read and interpret Conduit Drawings and Blueprints and install accordingly.

• Ensure material needed is readily available and organized.

• Installation of pipeline.

• Use technology to improve communication and efficiency.

• Ensure team is working efficiently and implement suggestions to improve job productivity. • Complete and submit all required paperwork efficiently and properly.

• Overseeing or participating in wire installations with conduit & cable tray.

SPECTRA ELECTRIC (02-2022)

Journeyman

•Terminal panels.

•All types/size pipe bending.

•Read blue prints.

•Lihgting lead.

•In charge of all power.

•Terminals of cable from 250-750.

•Access control CCTV.

•Installation of transformers, as well as to make terminal tranformers. •Low voltage tech.

• Fire alarm tech.

GAYLOR ELECTRIC LINDIE PROJECT (02-2023)

Journeyman

• Installation of SWICHGEARS, PDU, Pprotected in the tsmANELS.

• Crimp connector for wires 500 MCM for SWICHGEARS.

• Megger wires after run the wires for High Voltage

• Run Emt and rigid pipe different site.

• Run low voltage wire for receptacles, Swichgears, Air Handlers.

Helix electric

06/23 journeyman

protected in the TSMC

. Terminal panels.

. All types/size pipi bending.

. Terminals of cable from 250-750



Contact this candidate