SYED
ZAHEER AHMED
ENGINEER
Contact
Phone : 571-***-****
Email : *************@*****.***
Portfolio : www.linkedin.com/in/syed-
zaheer-shah-
Address : ***** ********** ******,
Broadlands VA 20148, Ashburn,
United States
Skills
Well Cementing Operation (primary &
Remedial). high Pressure Pumping &
Mixing Equipment. Plug Setting And
Squeeze Cementing. API Standards
And HSE Compliance. Pressure
Testing And Equipment Calibration.
Rigging Up & Down Cement Unit.
Equipment Maintenance And
Inspection Logout/tagout (LOTO)
Procedures.
Languages
English
Urdu,Pashto
Objective
Dedicated Oil and Gas Cementing Field Specialist with 5 years of experience in oil and gas well cementing and high pressure pumping.Proficient in troubleshooting and compli- ance with safety standards. Passionate about delivering top- quality results in the industry.
Education
Becholer Of Science (Petroluem And Gas Engineering) 04/2007-03/2012
Balochistan University Of Information Technology,
Engineering And Management Sciences
Experience
CASHIER/ ASSOCIATE 12/2024-Present
Exxon
Working with Exxon gas station as store associate. Provided good customer service.
Field Specialist 09/2022-09/2024
TAQA
• planned and executed primary and remedial cementing job for onshore wells.
• Worked as field specialist at rig side.
• Operated and maintained cementing equipment, including pumps, bulk silos, and mixing tanks.
• collaborated with drilling engineer to optimize wellbore in- tegrity and zonal isolation.
Certificates
Health Safety and Environments, Ms Office Suite
09/2022-09/2024
Agora Training Center
HSE training and development including all related to safety courses for oil and gas operations and processing. Workshop Well Bore Integrity 06/2011-07/2011
Society Of Petroluem Engineers
Wellbore integrity refers to the ability of well to maintain its structural and pressure containment throughout its lifecycle. Organizations
TAQA 09/2022-09/2024
Field Specialist
Projects
Well Performance In Vertical & Lateral Wellbores 04/2007-03/2012
Investigate the pressure behavior of horizontal wells and vali- date analytical solutions available for pseudo radial flow with simulation.
Analyse field pressure data of a well with dual wellbores from field and provide recommendations for future development project.
Designed by CV Maker - Resume Builder