Post Job Free
Sign in

Electrical Engineering High Voltage

Location:
Qatar
Posted:
August 06, 2025

Contact this candidate

Resume:

DEEPAK KUMAR SAGAR

MMUP/UPDA Certified, PMP Certified professional

Mobile no: +974********, +974********

E-mail: *************@*****.***

OBJECTIVE: -

Seeking an Increasingly Responsible Position in Your Organization Safety in Career Development and Challenging Environment Where My Qualification, Experience and Dedication Can Be Utilized for The Prospects of The Organization.

EDUCATIONAL QUALIFICATION:

B. TECH Electrical engineering -CGPA: 8.00, From National institute of technology Kurukshetra.

DIPLOMA in industrial automation From Technocrat automation training institute Chennai. KEY SKILLS:

I am a dynamic professional in site, shaft, station and Tunneling works and have a good knowledge of equipment like TBM,, conveyor belt, Gantry Cranes, Diesel Generators Hight voltage system, transformers, RMU, Batching Plant, Chiller Plant, Locomotives, MSV’S, Dewatering system Variable frequency Drives, Lighting system, tunnel communication system, Ventilation system, concrete pump, concrete spray machine, dewatering pump and other electrical equipment equipment’s used in construction sites and inside the tunnel.

Planning, Mobilization, assembly, commissioning and dismantling works of Tunnel boring machines (HK, CREG).

Procuring Electrical related Tools & Materials for project site, shaft, Tunneling activities.

Preparing documentation for the submission to the client and maintaining accurate records of all electrical installations, testing, and maintenance activities as per project requirements.

Experienced in TUNNEL, NATM & UNDERPASS machinery like Twin/Three boom JUMBO machines, Shot-Crete machines, mini electrical breaker & excavator, Mini loader.

Electrical Troubleshooting and Problem-Solving.

Testing, Commissioning & Trouble shooting of MV/LV switchgears.

High Voltage Appointed person for the total Project with special Certification for Qatar UPDA.

Large capacity Diesel power plants installation, commissioning, testing and regular maintenance (BS7671 QCS2014) Including 22/33KV high voltage cable termination, Testing and connection using lock-out tag-out procedure.

Developing operational plans, Knowledge of MS Office, Word, Outlook and Excel. Knowledge of budgeting and expense control.

Load Calculations, SLD Preparation, and Selection of cables and panels for Electrical System

Scheduled inspection and testing of overall electrical systems include Earthing, appliance, DB, panels, fire system, earth leakage protection devices using Lock out and tag out as per BS7671.

Installation and maintenance of site and tunnel communication system. PROFESSIONAL EXPERIENCE:

1. Project Electrical Lead /Electrical Superintendent for TBM Tunneling and shaft works

(from June 2022 to Till Date)

Organization : PORR-HBK-MIDMAC -JV

Project : Wukair & Wakrah Drainage Tunnel Project C853/2 Consultant : Parsons International Limited

Clint : Ashghal

Location : Doha Qatar

WORK RESPONSIBILITES: -

Playing a key role in site, shaft and tunnel construction works through electrical services continuity, Electrical support, troubleshooting, leading assembly and start- up of Two EPB tunnel boring machines (5.885m-CREG) using umbilical launching method and as well as auxiliary services within strict deadlines.

Work with other project team members, including civil engineers, Sub-contractors, and project managers, to develop project plans and ensure that electrical systems are integrated effectively with other systems.

Installation, Commissioning & Maintenance of 60T EOT cranes (DG make), batching plants (Techni well TMW 25). chiller plant, grouting equipment’s, manlift at shaft etc.

Installation, Commissioning & testing of Electrical system using 630kva substation inside the tunnel for providing power supply for electrically operated TFI Shutter and concrete supply train with Concrete cigar and concrete pump for inner lining works.

Procuring Electrical related Tools & Materials for project site, shaft, Tunneling activities

Maintain accurate records of all electrical installations, testing, and maintenance activities as per project requirements.

Monitor and control project costs and schedules related to electrical systems, ensuring that they are completed on time and within budget.

Installation and maintenance of site and tunnel communication system

Installation, commissioning and testing of 12 MVA generator power plant,22 KV high voltage cable termination, Testing and connection in HV junction box switching HV power using lock-out tag-out procedure.

High Voltage Appointed person for the total Project with special Certification for Qatar UPDA.

Installation and maintenance of de-watering system at site and shaft.

Assembly, Commissioning, and maintenance of Truemax make man lift.

Installation and maintenance of Lighting system, Ventilation system, dewatering Pump and other electrical equipment are inside the tunnel.

LT/HT cabling, Cable jointing and termination.

Maintenance of schoma diesel engine Locomotives. 2. Project Electrical Lead /Electrical Superintendent for TBM Tunneling and pumping Station (from Feb 2019 to May 2022)

Organization : HBK-PORR(AUCC)-JV

Project : Mesaimeer pumping station & Outfall Project Consultant : Mott Macdonald

Clint : Ashghal

Location : Doha Qatar

WORK RESPONSIBILITES: -

Played a key role in site, pumping station and tunnel construction works through continuity, electrical services, Electrical support, troubleshooting, leading assembly and start-up of EPB tunnel boring machine (4.7m-CREG), using umbilical launching method and as well as auxiliary services within strict deadlines.

Work with other project team members, including civil engineers, Sub-contractors, and project managers, to develop project plans and ensure that electrical systems are integrated effectively with other systems.

Commissioning & Maintenance of 40T EOT cranes (DG make), 4 MVA Generator Plant, batching plants (Techni well TMW 25). chiller plant, Locomotive, manlift at shaft etc.

Procuring Electrical related Tools & Materials for project site, shaft, Tunneling activities

Dismantling and taking out TBM machine Out from 10km tunnel under sea.

Installation and maintenance of site and tunnel communication system.

Installation, commissioning and testing of 6 MVA generator power plant,22 KV high voltage cable termination, Testing and connection in HV junction box switching HV power using lock-out tag-out procedure.

High Voltage Appointed person for the total Project with special Certification for Qatar UPDA.

Installation and maintenance of de-watering system at site and shaft.

Installation and maintenance of electrical system at Raiser shaft.

Installation of 630kva compact transformer to supply tbm and tunnel lights to eliminate the voltage drop at 5km length.

Precast plant equipment assembling, commissioning and maintenance equipment like EOT cranes, steam generator, batching plants etc. 3. Project Electrical Lead /Electrical Superintendent for TBM Tuneeling / Metro Rail Track work (from April 2015 to Jan 2019)

Organization : PORR-SBG-HBK Joint Venture (DOHA),

Project : Green line of Doha Metro Project in Qatar. Consultant : Hill international

Client : Qatar rail

Location : Doha Qatar

WORK RESPONSIBILITES: -

assembly, Commissioning & Maintenance of EPB-TBMs (HERRENKNECHT) S-844, S- 845, S-846 and S-847. (Qatar metro rail ltd).

22 KV high voltage cable termination, Testing and connection in HV junction box switching HV power using lock-out tag-out procedure.

Installation, testing, commissioning, operation and maintenance of construction plants and equipment, hyperbaric system, Electrical compressors, Variable frequency drives, Electrical-PLC controlled hydraulic power packs, cranes

Installation and commissioning of communication system in tunnel and TBM using 6 pair fiber cable and control box.

Supervising electrical & instrument staff and coordinating the daily activities of the electrical & instrument department.

Installation & commissioning and operation of H+E conveyor belt system.

Installation and commissioning of conveyor booster panel and booster motor. TMS MAKE – MSV 12 NUMBERS.

Commissioning & Maintenance of electrical equipment like grout plant (Techni well), cooling tower, chiller plant, tower Cranes etc.

Commissioning & Maintenance of chiller plant and ventilation fans.

Operation & Maintenance of rolling stokes like MSV, Excavator, mulhauser, flex rock.

Installation & commissioning and testing of Installation of 400 KVA transformers

(CTS) at cross passage.

LT/HT cabling tray lying, Cable jointing and termination.

Inspection and testing of electrical panel, Distribution box and preparing report for client.

Supervising electrical & instrument staff and coordinating the daily activities of the electrical & instrument department.

Repair and maintenance of shotcrete pump, concrete pump, Tower lights, diesel generators, etc.

Commissioning & Maintenance of 16 no’s TMSV.

Commissioning & Maintenance of 9 gantry cranes (true max) and 15 flying buckets

(truemax).

Commissioning & Maintenance of concrete pumps, nut runners, rail grinder etc.

Providing guidance to junior staff in the areas of; leadership, continuous improvement, decision-making and conflict resolution

Supervising electrical & instrument staff and coordinating the daily activities of the electrical & instrument department.

Preparing documentation for Qatar rail safety audit. 4. Electrical Engineer for TBM Tunneling, shaft and cross passages works (From June 2012 to April 2015)

Organization : AFCONS Infrastructure Limited (India) Project : Chennai Metro Rail Project- Contract UAA-05 Consultant : Egis Rail

Client : Chennai Metro Rail Limited (CMRL)

Location : Chennai,India

WORK RESPONSIBILITES: -

Played a key role in site station and tunnel construction works through electrical services continuity, Electrical support, troubleshooting, leading assembly and start- up of Four EPB tunnel boring machines (HK) and as well as auxiliary services within strict deadlines

assembly, Commissioning & Maintenance of Two EPB tunnel boring machines (6.9m

- HK), 40T,160T EOT cranes, 6 MVA generator plants, batching plants, Techni well chiller plant, Locomotive.

7.5 MVA diesel power plant installation and testing also HV cable termination and joint inside tunnel during cable extension.

11 KV high voltage cable termination, Testing and connection in HV junction box.

Connection & Commissioning and testing of Synchronizing panel,1010kva and 500kva DG.

VCB panel connection & Commissioning and testing.

Procuring Electrical related Tools & Materials for Tunneling activities & Tunnel Equipment’s.

Connection & Commissioning and testing of Synchronizing panel,1010kva and 500kva DG.

Installation Commissioning & Maintenance of Diesel Generators 1010 KVA

(GMMCO) & 500 KVA (CATERPILLAR).

Commissioning Maintenance of electrical equipment like grout plant, chiller plat EOT Cranes.

Maintenance of schoma diesel engine Locomotives.

Procuring Electrical related Tools & Materials for Tunneling activities & Tunnel Equipment’s.

Commissioning and maintenance of 40-ton DEMAG make gantry PROFESSIONAL TRAINING COURSE

Emergency response and rescuer

First Aider Training

Confined Space Entry for Supervisor

Project Management Professional

PERSONAL DETAIL

Name : Deepak Kumar Sagar

Father’s Name : Mr. Nageena Prasad

Date of Birth : 04/02/1989

Gender : Male

Nationality : Indian

Marital Status : Married

Language Known : English, Hindi

Passport No : Y2826911

Contact number : +974********, +974********

Personal Traits:

Punctual, Innovative & Target Oriented, Problem Solving, Increase Efficiency with Effectiveness.

I hereby certify that the above information furnished by me is true and correct. Your positive reply is very much appreciated.

Yours Truly,

(Deepak Kumar Sagar)



Contact this candidate