Joseph Fry
***** ******** ***** **, ******, TX. *7388
979-***-**** – ******.*****@*****.***
SUMMARY OF QUALIFICATIONS
Proficient with MS Office Suite, POS (Point of Sales), Merchant Services, Data Entry
Great communication and “people skills” with excellent attention to detail
Critical Thinking, Observant, think outside the box, Team player
Exceptionally well organized, utilizing creativity and initiative to achieve both personal and corporate goals
Highly motivated, energetic, team oriented professional who successfully implements problem solving strategies while keeping the best interest of the company at heart
LICENSE
Apprentice Electrician License # 444194
EDUCATION
ITT Technical Institution 2007-2009
●Associates degree in Networking
Windham School, Colorado, Texas 1998-2000
●Tech Degree in Construction Carpentry (600 hours)
●Tech Degree in Automotive Performance (600 hours)
●Diversified Business Training (60 hours)
●General Business I (60 hours)
●General Business II (60 hours)
●Food Services (60 hours)
●OSHA (60 hours)
Georgetown High School, Georgetown, Texas 1996
●GED GRADUATE
PROFESSIONAL EXPERIENCE
Electrical Assembly Technician - Electronic Power Design Houston TX. October 2021 - July 2022
●Assemble materials.Read and interpret drawings, diagrams, blueprints, specifications, work orders, or reportsClean parts thoroughly.
●Review work activities with supervises.Inspect wiring installations, assemblies, and circuits.Assemble electrical or electronic systems or support structures and install components, units, subassemblies, wiring, or assembly casings, using rivets, bolts, soldering or micro-welding equipment.
●Tag components.Adjust or repair electrical equipment.Correct defects.Test product to ensure conformance to specifications.
●Build products such as electric motors, computers, electronic control devices, and sensing equipment.Perform manual assembly during the small-scale production of electronic devices.
●Fabricate or modify parts, using shop equipment.Verify dimensions and clearances of parts to ensure conformance to blueprint specifications.
Automation – (PCI) Protect Control Inc, Conroe, TX November 2018 – June 2021
Assembly Technician / Mig Welder
●Construction of electrical control buildings by using various electrical and pneumatic tools
●Prepare work to be accomplished by studying assembly instructions and blueprints specifications
●Gathering of parts, subassemblies, tools and materials
●Verifies specifications by measuring subassembly parts
●Resolve construction problems by altering the dimension of parts to meet specifications with the approval of lead or supervisor.
●Maintain a clean and safe working environment by following procedure, rules and regulation.
Tejas Grain Express, LLC – Pasadena, TX June 2016 – January 2018
Browning Feed, Tack & Wildlife Supply - Manvel, TX June 2009-Jan. 2010 / June 2012- January 2016
Operation Manager
●Oversee the management of product merchandising and Inventory to ensure processes flowed smoothly.
●Analyzed sales (MS Excel/graphs/Charting) to determine if the store is meeting financial goals and implement plans to improve store performance.
●Hire, train, and supervised department employees to ensure company goals is achieved
● Set performance goals, resolving employee conflicts, and encourage team work.
●Maintained, updated, enforced safety and security procedures(opening and closing/ daily bank deposits)
●Assigning weekly work schedule and delegating work duties to employees
●Ensure daily sales by assisting on the sales floor (customers) to maximize profit
●Directly communicated with vendors and Principals on a daily routine to ensure payment and goods were received.
Prime Electric, Galena Park, TX January 2010 – June 2012
Electrician Apprentice
●Responsible for worksite preparation by ensuring generators and man lifts were fueled. Tools and PPE were readily available.
●Termination of ground (2/O and 4/O) wiring on sub section of the oil rig by using a hydraulic crimper.
●Drilling holes to install termination parts (Receptacles, Lighting and cable trays)
●Termination and installation of Flood lighting and Florescent lighting on sub parts
●Termination and installation of up to a 32 pin receptacle
●Running(pulling) various types of wire throughout the rig on cable trays
●Labeling of cables and receptacles by using a label machine to ensure proper connections.
OPINIONS UNLIMITED, Houston, TX November 2004 – November 2009
Call Center Manager
Project Management
Interim Moderating Facility Supervisor
●Directly responsible for daily allocation of tasks for 50+ personnel at a “Top Rated worldwide” research firm, while maintaining recruiter productivity through ongoing training and counseling
●Supervised phone room and maintained quality control by constant attention to each recruiter’s adherence to policy and procedures
●Implemented hands on training and employee development programs to increase productivity and initiated conflict resolution strategies to bolster a “can do” work environment
●Worked directly with all Project Managers regarding the progress of their projects in order to comply with completion dates
●Reported directly to Vice President/Human Resources Director on all personnel issues as well as daily project status updates
●Pioneered methods for better document control, production reporting and training criteria
●Interacted daily with clients from Fortune 500 companies while maintaining confidentiality and high quality services in a very fast paced environment
●Orchestrated policies and procedures to meet or exceed HIPAA and industry standards for control of PII (Personally Identifiable Information)
●Coordinated projects with industry affiliates to exceed client expectations while reducing expenses