Over ** years experienced in all processes of Emergency Management, Costing Analyst Specialist, Hazard Mitigation 404 and Public Assistance 406 project development, benefit cost analyst, damage assessment and program management. Fully Bilingual English–Spanish.
Also: HM HPA Specialist – Certified.
Current Position:
Costing Analyst Specialist and
406 Mitigation Liaison (CORE)
Consolidated Resource Center – Sacramento, CA
2018 to present (current pay scale IC 13-4)
Extensive program, project and organization management, contract administration, and cost /schedule controls. Government and commercial construction, nationally & internationally including KSA. Power Infrastructure, civil infrastructure, airport infrastructure, airport terminals, vertical buildings up to 20 stories, schools and university buildings, housing / hotel, recreational buildings, hospitals, hangers, commercial retail, industrial, and SOLAR specialty construction. Participated in design build, fixed cost, and negotiated cost projects throughout his career. Core Competencies include Project Recovery, Project Leadership, Strategic Planning, P& L Management, Change Management, Document Control Management, Earned Value Management, Cost Engineering, High- Impact Presentations, Mentoring & Coaching, QC / Quality Assurance, Outreach, MIS, Value Engineering, Estimating Support, & Constructability Review
Professional Experience:
Al-Ayuni Construction Mar. 2018 to July.
Sr Project Manager / Consultant / Contract
Riyadh, Saudi Arabia
Request to return to Saudi Arabia to prepare a contractor to build a Sea Hawk hanger for the Saudi Navy in Jabail. The client was USACE / CoE. They needed someone who had worked in Saudi Arabia before, knew the culture, military and USACE/CoE. This is a critical structure for the Corps of Engineers.
FEMA – Mitigation Nov. 2017 to Feb. 2018, St. Thomas
Lead Mitigation
Was assigned as lead Mitigation for the team in St. Thomas Island after current Lead was disabled. Was on island for 4 months.
Prime Projects Japan, Okinawa, Japan
Sr. Project Manager for 4 US Military Bases. 2016 to 2017
My projects were all LEED Silver projects that included an NEC building / Computer network facility to support the entire Pacific Fleet. (Secret). A F-35 hanger for the Marines at another base (Secret). Army head quarters facility for the US Army. USACE / CoE. A facility to support the NEC facility / radar at another base. (Secret). USACE contact numbers upon request.
Various Project Management/Construction Management projects in KSA, 2014 - 2015
Construction Management Senior Advisor
Advisory support on various Municipal infrastructure management projects in KSA. PM/CM, Project Recovery & Engineering Support for various projects including King Abdullah Financial District, King Khaled International Airport Expansion and other Saudi based building and infrastructure projects.
FEMA, Homeland Security, 1/1/13 to 12/31/13 Reservist
Part of a special team of specialist reviewing damage to airports and civil/power infrastructure by Hurricane Sandy. Write technical damage reports and mitigation for subsistence grants from the US Federal Government. Airports that were damaged included: La Guardia Airport, NY, Elizabeth Field Airport, Fischer, NY.
NAS Navy Air Station, San Diego, 2012 to 2013
Senior Project Manager - Project Controls
Project Control Manager for this $60 million Gold LEED certified hanger project at NAS, Coronado Island in San Diego, California. This is a design build project that was managed from cradle to grave. Responsible for the day-to-day control of this facility and reported this to the Navy. The project was completed within the budget refrains and schedule benchmarks. This included reviewing drawings and specifications for constructability, evaluated and prepared recommendations for changes in scope of work, lead team owners meetings, reviewed consultant work, approved payments, and established / implemented an effective control program for compliance with FEAD / Navfac.
AFCEE USACE project for the Mazar Sharif International Airport, Afghanistan, 2011 to 2012
Senior Project Manager
Classified construction projects for DoD. Project were varied but consisted of housing, hangers, central plants, administrative facilities, runways, taxiways and infrastructure. These projects were all Silver LEED projects.
L.A. Ontario International Airport, Ontario California, 2006 to 2009
Resident Engineer This project includes replacement of the existing baggage handling spaces; construction of new baggage screening rooms; replacement of the outbound baggage conveyor systems, and installation/integration of TSA-provided Explosion Detection System (EDS) machines as well as work on the various civil and power installations. As Senior Resident Engineer, duties include:
•Lead, communicate, and direct the project execution for the project team.
•Ensure necessary support is obtained from engineering and airport operations to meet project objectives.
•Coordinate with Architect / Design Engineers including RFI’s.
•Monitor schedule of activities leading to the completion of the contract with clear deliverables and acceptance defined criteria.
•Keep the Senior Management informed of project progression and highlight any major concerns/issues/successes as they arise.
•Manage the day-to-day interface with the project team and ensure all communication is effectively controlled.
•Ensure the project team is effectively structured and the roles and responsibilities are clearly defined, coordinated and understood.
•Work with all contractors to ensure that the impact of claims and variations are limited / reduced.
•Coordinate final inspection process.
•Oversee As-built drawings and project close-out.
Cal State University San Bernardino campus, Ontario, California, 2005 to2006
Senior Project Manager Project Manager for a LEED certified architecturally elite fitness building at Cal State University San Bernardino campus. This project included a basketball court, hockey rink, two saunas, aerobic rooms, cliff climbing wall, work out and weight rooms. This complex also held the administrative offices for the campus athletic department with state of the art conference room. The building had a double apex fan shaped roof that created a challenge and became a central architectural center piece for the campus. This building was mentioned in the regional Fitness Center AIA awards.
March Air Force Base in Riverside, California, 2003 to 2005 Senior Project Manager / Project Controls
Sr Project Manager Project Manager / Project Controls Manager for this $20 million LEED certified hanger project at March Air Force Base in Riverside, California. This hanger was the first LEED certified building by the US Air Force. This was a design build project that was managed from cradle to grave. It was written up in the local newspaper, ENR and the Air Force Times as an example of LEED certification can accomplish and the rewards the bring to a project. As the contractor Senior Project Manager, was responsible for the day-to-day operation of this facility. The project was completed within the budget refrains and schedule benchmarks. This included reviewing drawings and specifications for constructability, evaluated and prepared recommendations for changes in scope of work, lead team meetings, reviewed consultant work, approved payments, and established / implemented an effective control program for compliance with the Army Corp of Engineers.
Multiple projects with the LA Air Force Base in Los Angeles, Assigned to 61 ABG/CE Engineering Group, 2000 to 2003
Senior Project Manager / Quality Assurance
Senior Project Manager on multiple projects with the LA Air Force Base in Los Angeles including power installations. As Senior Project Manager reviewed construction contract documents on all Air Force Base Projects in the Los Angeles Area. Review all submittals and RFI’s for compliance and provided technical instructions for the Air Force. Provide claim avoidance measures and negotiations for the projects, including change Order negotiations, contract interpretations, and act as a liaison between the Contractors, Engineering & Air Force.
Major (GSA) government construction projects in the Los Angeles area, 1998 to 2000
Construction Manager / Quality Assurance
Reviewed all contract documents & inspected major (GSA) government construction projects in the Los Angeles area. Review drawings and specifications for constructability, evaluate and prepare recommendations for changes in scope of work, lead team meetings, review consultant work, approve payments, and establish / implement an effective quality control program for compliance with GSA. Closed out the Roybal Court renovation project at the Federal Building in downtown Los Angeles
Camp Pendleton Marine Base, San Diego, CA, 1997 to 1998
Construction Manager / Project Controls Manager
Review drawings and specifications for constructability, evaluate and prepare recommendations for changes in scope of work, lead team meetings, review consultant work, approve payments, and establish / implement an effective quality control program for compliance with Navy. Managed and closed out various facilities, civil/power installation projects at Camp Pendleton Marine Base. Also managed the Quality Control / Inspection program.
Multiple Navy Projects, 1996 to 1997
Program Manager / Project Controls Manager
Senior expert to institute improved Project Controls program for JOC contractors. Substituted the proper Control documents and procedures to contractors who were having difficulty with Navy regulations and procedures over their Project Controls program.
Power / Electro-Mechanical / Maintenance Facilities at Camp Pendleton Marine Base, San Diego, California, 1995 to 1996
Construction Manager / Project Controls Manager
Reviewed drawings and specifications for constructability, evaluate and prepare recommendations for changes in scope of work, lead team meetings, review consultant work, approve payments, and establish / implement an effective quality control program for compliance with Navy. Managed and closed out Power / Electro-Mechanical / Maintenance Facilities.
California State University Trustees construction management team, 1990 to 1995
Project Manager / Quality Assurance
California State University Trustees construction management team, responsible for contract administration, provided claims avoidance measures and negotiations for the project, including change order negotiations, contract interpretations, liaison between the Contractors, Architect & Owner. As Project Manager on two major building and infrastructure projects totaling $80 million, it was his responsibility to oversee all field aspects of management, inspection and close-out of these two projects.
Office Facility at a Federal Army Reserve Base, (US Army Corps of Engineers Project), Los Angeles, CA, 1988 to 1990
Project Manager / Quality Control Manager
As the contractor, was responsible for the day-to-day operation of this Office Facility at a Federal Army Reserve Base. The project was completed on time and under budget and produced over $100,000 in Change Orders. Reviewed drawings and specifications for constructability, evaluated and prepared recommendations for changes in scope of work, lead team meetings, reviewed consultant work, approved payments, and established / implemented an effective quality control program for compliance with the Army Corp of Engineers.
King Saud Hospital renovation project, 1985 to 1988
Construction Manager / Quality Control
Responsible for Construction Management on the King Saud Hospital renovation project with a $260 million budget. As part of the construction management team was responsible for contract administration, provided claims avoidance measures and negotiations for the project, including change order negotiations, contract interpretations, liaison between the Contractors, Architect & Owner. Also implemented an effective quality control program for compliance for this project.
King Khalid Technical University, Riyadh, Saudi Arabia, 1984 to 1985
Construction Manager
Responsible for supervision of a $240 million 2-year construction contract for Saudi Arabia King Khalid Technical University. This included 5000 custom built faculty housing units for the University, a water treatment facility and associated support buildings on the University. This included preparation of pay requests and supporting documents, handling multimillion dollar international letters of credit, negotiating subcontracts and auditing subcontractor/vendor submittals. Concurrently set-up and supervised plant to provide pre-cast concrete panels for the project.
King Khalid International Airport, Riyadh, Saudi Arabia 1982 to 1984
Construction Manager
Responsible for supervision of a $240 million 2-year construction contract for Saudi Arabia King Khalid International Airport as a sub to Bechtel. This included runway construction, taxiway, hangars, and interior finishes to the terminal. This included preparation of pay requests and supporting documents, handling multimillion dollar international letters of credit, negotiating subcontracts and auditing subcontractor/vendor submittals.
EDUCATION
St Leo University Masters –MBA (Cum Laude)
St. Leo University
BA Business Management, minor in Construction Management
Rensselaer Polytechnic Institute
BS Civil Engineering
CERTIFICATIONS
CCM certification
LEED trained
ICBO certified building
U.S. Army Corps of Engineers certified
HUD certified
OSHPD
4th Degree Knights of Columbus
Annual OSHA classes, ICBO updated yearly.
PUBLICATIONS
Thomas S. Kempton, 2011, Strategic Analysis of Halliburton
Thomas S. Kempton, 2012, Construction / Destruction Afghanistan
Iraq
Syria
Iran
ADDITIONAL CAREER HIGHLIGHTS
AWARDS
NIRSA Outstanding Sports Facility design award
Recognition by Cal State University for performance excellence.
First LEED certified building on CSUSB campus.
First LEED certified building for the USAF.
Letter of Accommodation from base commander James Rubeor, Brig. Gen., USAF.
Medals presented by Brig. Gen. James Rubeor for Integrity, Excellence & Service before Self.
AWARDS
2011 Professional of the Year Representing the Construction Industry (Cambridge).
Commencement Speaker for 2010 Graduation Class
Honored Outstanding Instructor of the Year
AIA regional mention for outstanding design award.
Letter from Robert Meehan, VP Bryan Construction for outstanding design build project performance.
CoE recognition for outstanding performance stakeholder outreach
Medal presented by Base Commander for Excellence Performance & Integrity.
Recognition by Engineering Group for performance excellence
Management of multiple projects without a single claim.
ADDITIONAL CAREER HIGHLIGHTS
ADDITIONAL CAREER HIGHLIGHTS
ADDITIONAL CAREER HIGHLIGHTS
ADDITIONAL CAREER HIGHLIGHTS