Mark J. Rossman
Chunchula Al. 36521
Ph.# 205-***-**** (call or text)
Email, *****.*******@******.***
Job resumes:
Assembly Mechanic / Assemblyman Trainer- Altec Ind. Plant 17
Employment dates: 2/21/05-8/24/06 and 10/9/06 — 11/30/09 and 12/27/2010 -2018
Maintenance Tech. Group Lead at Plant 14.
Assembly and repair of the following: P.T.O (power take off) Hydraulic pumps, contro! valves, dump valves, shuttle valves,
solenoid valves, supply & return system filters. Hydraulic system lay-out & hydraulic print reading. Trouble shooting,
Machine operator: Shear ironworker, band saw, brake press, steel lathe, and torch.
Certified Welder: Position tested Vertical up 3G
Thickness tested 1 in. thick plate
Applicable Code AWS D1.1-06
Position Tested Overhead 4G
Thickness tested 1 in. thick plate
Type welds... G.M.A.W.
Applicable Code AWS D1.1-06
Merritt Electric: Jobsite Foreman. Responsibilities were: Organize labor, order and pick up material, Electrical serves truck
and bucket truck work, daily communicate with company president on progress, and city building inspectors.
_ O'Neal Steel: Group Lead on Deslag crew, 1*.shift ; Responsibilities were as follows; Plan and create work
stations for each individual shipment, organize manpower according to employee job skills, check peace count and verify
accuracy, Keep equipment clean and working, work with and contact maintenance to avoid down time, production meetings.
afety Committee Member. Also 2™ shift Welder.
Electrician- Merritt Electric Co. (744-0974) Residential, Commercial, Industrial.
shooting A.C & D.C. motor control, switch gear design & set-up, Electrical serves truck, & bucket truck work and
Altec indu responsibilities are: Organize man power according to their ability,
services, trouble shoot and fix the following; Laser, Global punch, oe burners, bres
Air col ors and motor control, and Mig Welders
ore Al: Responsibilities are; organize all the electrical projects such
electrical problems, plan shut — down maintenance. Rebuilding old
‘