PROFILE

A competent Civil Engineer with over ** years’ experience and

excellent technical, organizational, communication and co- ordination skills. Experience in construction of buildings, housing projects, concrete and Earthworks, Power transmission lines and substations, Building maintenance and project management EDUCATION

Copperbelt University

From Jan 2025 to Dec 2026

MSc Project Management

Copperbelt University

From 2017 to 2023

Bachelor of Engineering in Civil Engineering

Copperbelt University

From 2003 to 2006

Diploma in Civil Engineering

Kasempa Boys Secondary School

From 1998 to 2000

Grade 12 School Certificate

SKILLS TRAINING

Association of Consulting Engineers of Zambia

19

th

to 20

th

February,2025

Measurement and Estimation of Construction Works

Development Bank of Southern Africa Vulindlela Academy 10

th

to14

th

September, 2012

Certificate of Recognition in Project Management

Zambia Institute for Accountancy Studies

16

th

to 19

th

March 2010

Project Management, Monitoring, Evaluation and Reporting Workshop

Professional Membership

• Engineering Institution of Zambia

• Engineering Registration Board

• Project Management Institute-Member

CONTACTS

Phone:

+260-***-***-***

+260-***-***-***

Email: **********@*****.***

LANGUAGES

• English

• Kaonde

• Bemba

• Nyanja

HOBBIES

• Playing football

• Watching Movies

• Reading Books

SKILLS

• Teamwork

• Good Communication

• Problem solving

• Reliability

• Result-oriented

• Bill of Quantity Preparation

• levelling

• Microsoft Project

• Msword, Excel, PowerPoint

• Project management

• Driving-B class

Davy Mambwe

Registered Civil Engineer

WORK EXPERIENCE

Zesco Limited Jan 2011 to Sep 2024

Position : Clerk of Works

Responsabilités/Duites

• Plan, Design, Cordinate Maintenance, Schedule and Supervisor in house works

• Carrying geotechnical investigation

• Design foundations for both Substations and transmission lines

• Day to day project management and Site Supervison

• Preparation of monthly and weekly reports.

• Review and approve structural designs and drawings, including building and tower foundation designs

• Material certification Supervision

• General project quality assurance

• Liaison with Project stakeholders

• Ensure compliance with safety

• Prepare, Bill of Quantities,Material Schedules and scope of works Projects /Assignements Worked On

• Kafulafuta Dam Water Systems Project

The Project included construction of 132-66kv/33kv Kafubu Substation. Extension of bay and control building at 66/11Kv Roan Substation and 66kv transmission line on Monopoles

• 250MVA Transformer

The project included construction of transformer plinth and other equipment foundations at 330KV and 88KV Bays at Kabwe Step Down Substation

• Kabwe Pensulo Line 2 Project

The project included construction of equipment foundations including reactor for line bay

• 330kV Kafue Gorge Lower Power Evacuation Lines Project The project included construction of 330kv transmission line from Kafue gorge lower to MFEIZ Substation, Kafue West Substation and Lusaka West Substation

• Connecting Rufunsa and Luangwa Districts

The project included construction of Mpasha Substation, Chitope Substation, Luangwa Substation, office blocks in Rufunsa, Chitope and Luangwa. Transmission line from Rufunsa to Chitope and Staff Houses in Rufunsa and Chitope

• Kabwe Pensulo Line 2 Project

The project included construction of tower foundations from Kabwe step down substation to Pensulo substation

• Connecting North-Western to the National Grid

The project included construction of 132kV/33kV Substations and 2 staff houses in Mwinilunga, Mufumbwe, Kabompo, Mumpezhi, Zambezi, Chavuma and Lukulu Districts Transmission line from Lumwana Mine Substation Mwinilunga, Mufumbwe, Kabompo, Mumpezhi, Zambezi, Chavuma and Lukulu Districts(800km)

and Lumwana Substation and Construction of 330-132kv Transformer and Line Bay

• Electrification of Kalumbila Mine

The project included construction of 330KV Kalumbila Substation, Extension of Lumwana Substation,330KV Transmission line from Lumwana Substation to Kalumbila Substation and 330KV Double Circuit Transmission line from Mumbwa to Kalumbila Mine

• Upgrade of 66kV Luangwa Substation in Kitwe

The project included construction of Transformer foundations and other Equipment and Extension of Control Building

• Distribution Expansion and Reinforcement Project The project included construction of Scaw and Mwambashi Substations in Kitwe and Ndeke Substation in Mufulira and 66KV Transmission line from Scaw to Mwambashi and Ndeke Substations

• Copperbelt Division

Maintenance of Zesco buildings and in house projects in Ndola, North-western, Luapula and Northern Regions

• Northern Division

Maintenance of Zesco buildings and in house projets in Kitwe, Mufulira, Luanshya régions and Kansanshi and Lumwana Substations

A&B Replacement Parts Limited Aug 2020 to Dec 2022 Position : Site Supervisor

Responsibilities/Duties :

• Pricing Bill of Quantities

• Quantify materials for work

• setting out and levelling

• Day-to-day supervision of work

• Prepare work schedules

Projects Worked On

• Construction of Fish bond and water tank reservoir, tank stand, animal trough in chirundu district

• Construction of escape stair case at ZICTA Head office in Lusaka

• Construction of two maternity annexes, waste treatment area in mambova and sekute of Kazungula Square One Limited Aug 2018 to Dec 2020

Position : Site Supervisor

Responsibilities/Duties :

• Pricing Bill of Quantities

• Quantify materials for work

• setting out and levelling

• Day-to-day supervision of work

• Prepare work schedules

Projects Worked On

• concreting access road within the Chilanga cement ndola

• replacement of failed concrete deck in Chilanga cement Ndola Marike Engineering Limited Jul 2008 to Dec 2010

Position : Site Manager

Responsibilities/Duties :

• Sourcing, tendering for new jobs/works,

• Overall supervision of works

• Quantify materials for works

• Prepare /Revise work schedules

• Attending project Progress meetings.

Projects Worked On

• Construction of underground workshop and installation of lifting winch At 1065Mw, 1720ft level 3 shafts in chililabombwe (KCM)

• Construction of underground workshop, service ramps and installation Of overhead crane at 1050 level Central workshop,3 shaft in chililabombwe (KCM)

• Reticulation of mushishima bridge and construction of spill way in chingola (KCM)

• Upgrade of Konkola and Nchanga in chililabombwe and chingola respectively. The project involved Construction of Double storey Classroom block, Library, ablution block, wall fence and car park

• Construction of Early Childhood Education School in Chiwempala Chingola funded by KCM

• Installation of Diesel skid tanks for PUMA at Zalawi Head office in Chingola Emageoy Enterprises Limited Apr 2008 to Oct 2010

Position : Site Supervisor

Responsibilities/Duties :

• setting out and levelling

• and supervision of works

Projects Worked On

• construction of Stores shed

• bund wall, plinths for pump and motors for sedimentation Tank

• two culverts for new concentrator in chililabombwe

• Rail line for surface at 3 shaft

• Construction of a concrete access road for new concentrator Fredkaz Engineering Limited Jun 2008 to June2008

Position : Site Supervisor

Responsibilities/Duties :

• setting out,

• leveling

• and supervision of works

Projects Worked On

• Construction of Wash Plant at Kagem Mine in Lufwanyama District Grinaker LTA-Konkola Deep Mining Project Dec 2007 to Jun 2008 Position : Construction Foreman

Responsibilities/Duties :

• Setting out,

• leveling and controlling high-rise structures and Excavations,

• Day-to-day supervision of works

• Preparation of bill of quantities and material Schedules Projects Worked On

• Shaft color concrète works

• main winder building foundations

• Cable trench,

• sink winder foundations

• two storey Substation

Marike Engineering Limited Dec 2006 to Nov 2007

Position : Trainée Civil Technologist

Responsabilités/Duties :

• setting out and levelling

• supervision of woks

Projects Worked On

• Puma Tank recovery Project in Ndola, Kitwe and ChingolaDistricts REFEREES

1.Mr. Kennedy Mwanza 2. Mr. Michael Mwansa

Deputy Director-Planning and projets Technical Director Zesco Head Office, Lusaka Marike Engineering Limited Lusaka. Lusaka

Cell : +260********* Cell : +260*********

3. Mr. Silwembe Mwalimu 4. Mr. Hilner Mulapani

Senior Manager, Civil Engineering Services Senior Manager – Planning and Projets Zesco Head Office, Lusaka Zesco Head Office, Lusaka Cell : +260********* Cell : +260*********

5. Mr. Chaali Kalebuka

Site Manager Transmission projet

Zesco Head Office, Lusaka

Cell : +260*********