Drilling Fluid Engineering Services
Mud Engineer Qualification
General Information
Education
Institution Degree Earned Major Completion Date
Ferhat Abbas University Engineer Chemistry Engineer 15th, July 1992 Halliburton University Cement Op Unipro II, HalWin & Cement Simulator
2001
Halliburton University Associated Engineer
Baroid
2002
Halliburton University/
BAROID
Drilling Fluids Engineer DFT 104 (Equivalent
Exam)
2015
Halliburton University/
Houston
Field Professional I BLOCK 1
DEVELOPPMENT & DFG
2015
Drilling & Completion fluids related training
Subject
Certificate (attach copy of
certificates)
Training Center Completion Date
Drilling Supervisor
To Whom It may
Concern _Sonatrach.pdf
Sonatrach Algeria HMD 1996
Cement Operator
Cement Op.pdf
Aberdeen Subea 2001
Associated Engineer
Baroid
Associated
Engineering Baroid.pd
Halliburton Algeria 2002
Engineer name: Hannai Mohammed
Phone number: 002***********
E-mail address : :
******.*****@*******.***/*****.******@*****.***
Nationality: Algerian
Birth date : 03rd, January 1966
Language : Arabic, English & Frensh
Familial Situation: Married
Employment History
Company Job title Date from: to: Location
UDFC - Algeria Senior drilling Fluids Engineer
/ Field Supervisor
Aug 2024 - Present Algeria
Halliburton_BAROID Senior drilling Fluids Engineer 15th, Jan 2023 / 5th, Nov 2023
IRAQ
EMEC Senior drilling Fluids Engineer 06.04.2022 /
01.01.2023
Algeria
Halliburton_BAROID Senior drilling Fluids Engineer/ Field Professional I
2012 / 2020 Oman
MB Petroleum Senior drilling Fluids Engineer 2008 / 2011 Oman BASP Senior drilling Fluids Engineer 2005 / 2008 Algeria AVA New Park Senior drilling Fluids Engineer 2003 / 2005 Algeria Halliburton Associated Engineering Baroid 2001 / 2002 Algeria Halliburton Cementing Operator
02.02.1999/12.31.
2000
Algeria
SONATRACH Drilling Supervisor Training 1996 / 1996 Algeria Field Experience (including mud types)
Operating
Company
Rig Name
Field
Accomplishments (specify major technical &
operational procedures implemented)
Date from:
to:
Technical and Operational Procedures
IWCF
IWCF Certificate.pdf
Petroleum Institute
HMD
2006
DFT 104
DFT-104 Equivalency
Exam.pdf
Halliburton University
2015
BLOCK 1
DEVELOPPMENT
TRAINING
BLOCK 1
DEVELOPMENT TRAIN
Halliburton Houston
2015
H2S
Hydrogen Sulfide
Safety.pdf
Halliburton University
2016
H2S
H2S Card-PDO
2022_Hannai Moham
PDO Oman
2018
Sonatrach - Algeria
Enf 16/ ENTP
227/ ADES
828/ ADES
801/ENAF 58/TP
162 / TP-210/
TP 200
Gassi Taouil &
CHEGGA / Hassi
Messaoud
Exploration &
Developpement
region/ Ain
Amenas/
Zelfana
- Drilled 16” ( 1.30 sg) & 12” (2.10 –
2.25 sg) holes section with OBM - NaCl
& Using BARITE as weighting agent
and drilled 8” hole section with
OBM -CaCl2 @ 1.47 – 1.50 sg using
CaCO3 and BARITE as weighting
agents.
- CO2 gas was controlled to avoid any
contamination of OBM by treatment
of mud to maintain good properties.
- Used separator/ POORBOY & Degazer
to separate CO2 gas, issue was fixed.
- successed.
2024 - 2025
CPM / ENI Iraq
HH_29 &
ZPEC-20, ZPEC-
16 & 25
Zoubair &
Rumaila BASRA
Iraq
- Pumped HI VIS / BAROLIFT & Heavy
pills with different formulation
depended of mud types & hole
inclination angle while drilling all
sections to ensure hole cleaning in the
Vertical & Horizontal wells.
- Run DFG to ensure the efficiency of
pills pumped to clean hole.
- At section TD swept hole with HI VIS
pills to clean hole prior running casing
and spot pills each section at bottom
to ensure the smooth casing run.
- Treated system with H2S Scavenger in
the expected H2S zone.
- Pumped wash Pills for completion job t
displace hole from WBM to
Completion Inhibited Filtrated Brine.
- Used Spud Mud, Inhibited WBM &
Completion inhibited Brine.
- Increased MW to stabilize hole in shale
zone
2023-2023
PDO / CPM
Halliburton Oman
Viking 117
Lakhwair
- Pumped HI VIS / BAROLIFT & Heavy
pills with different formulation
depended of mud types & hole
inclination angle while drilling all
sections to ensure hole cleaning in the
Vertical & Horizontal wells.
- Run DFG to ensure the efficiency of
pills pumped to clean hole.
- At section TD swept hole with HI VIS
pills to clean hole prior running casing
and spot pills each section at bottom
to ensure the smooth casing run.
- Treated system with H2S Scavenger in
the expected H2S zone.
- Pumped wash Pills for completion job t
displace hole from WBM to
Completion Inhibited Filtrated Brine.
- Used Spud Mud, Oil Base Mud,
Inhibited WBM & Completion inhibited
2018 - 2020
Brine in this region with WBM
(BARADRIL N Mud).
- Increased MW to stabilize hole in shale
zone.
Oxy Mukaizna-
Oman
LMP LMP Mixing and delivery Oil Based Mud to Rigs, control system and equipment of mixing.
2018 - 2018
OLEP Project
Great Well Rig
193
Doqm
Vertical & Horizontal wells
Used Spud Mud, Oil Base Mud, Inhibited WBM &
Completion inhibited Brine.
Increased MW to stabilize hole in shale zone
2018 - 2018
Medco_Oman
Abraj 105
Haima
Vertical & Horizontal wells
Used Spud Mud, Oil Base Mud, Inhibited WBM &
Completion inhibited Brine
Increased MW to stabilize hole in shale zone
2017 - 2017
BP Exploration
Khazzan-
Oman
Abraj 104
Khazzan
- Horizontal & Vertical drilling
- Pumped HI VIS / BAROLIFT & Heavy
pills with different formulation
depended of mud types while drilling
all sections to ensure hole cleaning.
- Run DFG to ensure the efficiency of
pills pumped to clean hole.
- At section TD swept hole with HI VIS
pills to clean hole prior running casing
and spot pills each section at bottom
to ensure the smooth casing run.
- Used Inhibited WBM (Hydrauguard
Mud).
- Increased MW to stabilize hole in shale
zone
2016 - 2017
OXY Oman
Abraj 206
ADAM &
KHAMILA
Horizontal drilling
Used Spud Mud, Oil Base Mud, Inhibited WBM &
Completion inhibited Brine.
Increased MW to stabilize hole in shale zone
2012 - 2016
OXY Oman
NABORS 809 &
810/ NDSC 32
Safah, Wadi
Laitham
- Horizontal & Vertical drilling
- Horizontal drilling (Used Air drilling
system as test to drill 12 ” hole, then
changed to WBM as the operation was
not success.
- Pumped HI VIS & Heavy pills with
different formulation depended of
mud types while drilling all sections to
ensure hole cleaning.
- Run DFG to ensure the efficiency of
pills pumped to clean hole.
2009 - 2012
- At section TD swept hole with HI VIS
pills to clean hole prior running casing
and spot pills each section at bottom
to ensure the smooth casing run.
- Used STOPPIT for the first time in
Oman as LCM pill @ 120 ppb and it
was successfully completed and DHL
was controlled.
- Used Spud Mud, Oil Base Mud,
Inhibited WBM & Completion inhibited
Brine
PETROGAS &
PTTE
Weatherford Sahmah
SHAMS -Oman
Vertical Drilling 2008 - 2009
Sonatrach - Hess
Groupment
ENAFOR 05
ENTP 129
Hassi Messaoud Drilling and Work over wells 2005- 2008 REPSOL & AGIP
ENAFOR &
SAIPEM
REGANE & EL
BORMA Algeria
Drilling vertical and Horizontal wells using Oil and WBM. Treated system in WBM with shale
inhibitors.
2003 - 2005
BP Exploration KCA Deutag Ain Amenas
Algeria
Drilling vertical and Horizontal wells using Oil and WBM. Treated system in WBM with shale
inhibitors.
2002 - 2003
TFT Groupment ENAFOR TFT
Drilling vertical and Horizontal wells using WBM.
Treated system in WBM with shale inhibitors.
2002
Sonatrach & TFT
Groupment
ENAFOR, ENTP
Rigs
Hass Messaoud,
TFT, Ohanet &
Roud Ennous
Algeria
Cementing Operations for all casing section where
I worked as Cement Operator
1999 -2001
WBM Experience (KCl, NaCl & Spud Mud)
BAROID, AVA, BASP,
EMEC Algeria, MB
Peroleum.
Halliburton Oman.
Halliburton Iraq
UDFC Algeria
ENTP 158,
ENTP 188,
ENAFOR 05,
KCA Deutag,
Abraj 105,
Abraj 104, MB
113, NABORS
Rigs, Viking.
ZPEC 16, 20 &
25 Iraq
Rigs……etc.
(HMD, TFT, Ain
Amenas,
Ohanet) in
Algeria Zoubair
Iraq,
Spud Mud. Bentonite Mud
Gel Polymer Mud.
KCL Polymer Mud (Inhibited WBM)
KCL/GEM GP polymer Mud (Inhibited WBM)
KCL/Glycol polymer Mud (Inhibited WBM)
BARADRIL N Mud
Silicate Polymer mud (Inhibited WBM)
Hydrauguard Polymer Mud (Inhibited WBM)
WBM High Salinity (Saturated Salty Mud)
2001-2025
OBM Experience (Invert Emulsion, All Oil, etc…)
BAROID, AVA, BASP,
EMEC Algeria, MB
Peroleum.
Halliburton Oman.
Halliburton Iraq.
OLEP Project.
UDFC Algeria
ENTP 158,
ENTP 188,
ENAFOR 05,
KCA Deutag,
Abraj 105,
Abraj 104, MB
113, NABORS
Rigs, Viking
and Great
Well Rig 193.
(HMD, TFT, Ain
Amenas,
Ohanet) in
Algeria Zoubair
Iraq,
INVERMUL, Invert Emulsion, SBM (Synthetic
Polymer Mud), AVA OIL Mud. OBM
2001-2025
ZPEC 16, 20 &
25 Iraq.
TP 210 Algeria
Heavy Brines (NaBr, CaBr2, Formats, etc.…)
CaCl2/CaBr2
Loss of Circulation (Highest concentration of LCM, types of losses, etc…) All Operating
companies
Most of Wells
Most of Fields
High concentration of LCM Pills was 180 ppb.
All types of losses (Seepage, Partial and Total)
2001- 2025
Hole Cleaning
All Operating
companies-
All Wells and
Sections
All Fields
Hi Vis Pills, Heavy Pill (Low Vis and Hi Weight
Pills using BARITE & Sweep Wate also LCM pill
as Nutshell C pill / Fibber Pills
The DFG is more than recommended and it is
required to optimize drilling parameters and
confirm hole cleaning by optimizing the drilling
fluids properties, surge and swab calculations
as well that avoids a lot of issues.
2001- 2025
HTHP
OXY Oman
Rig Abraj 206
Safah
Used Cooling system to control the mud
temperature and successfully completed
2017
High Overbalance and Stuck Pipe
OXY Oman
NARORS 810
Safah
Used N Flow pills & Caustic Pills to free the
pipes, successful operation,
2009- 2012
CPM / ENI Iraq
HH_29 &
ZPEC-20, ZPEC-
16 & 25
Zoubair &
Rumaila BASRA
Iraq
Caustic and B Free pill to free pipes.
2023 - 2025
SONATRACH Algeria TP 210
In Aminas -
Tiguentourine
Caustic (Ph- 12) and Nutshell pill to free
pipes.
2025
Solids Control Equipment
All Operating
companies-
All Wells and
Sections
All Fields
Different screens size & types used depended of
section and used Centrifuges.
Barite recovery used for some wells with Oil tools, Derrick & MI SWACO equipment.
2001-2025
Additional Accomplishments
Additional Information and/or comment
Mud Engineer Name & Signature
HANNAI MOHAMMED
Date: 08/01/2025
I hereby confirm that all the above informations are correct and under my responsibility. I worked as French, English teacher in Middle school and secondary school in between 1992 – 1993 and I passed my military services on 1993 - 1995. I have a nice experience in customer software system called Open Well & company services called Well Site @ different versions. I ‘m responsible for an environment comity in my town in Algeria also president of Parents Comity Primary School. I like football, Chess & Karate sports. With my experience at all Rigs and all operation assisted and done for 28 years ago, it’s important to me to enrich my knowledge and increase my expertise in the Oilfield to provide more services to you.