Victor Jacob Moraleja, REE, CEM
Project Management & Construction
EHV/HV Substation Manufacturing Telecommunication
(Data Center/IBS/Greenfield)
Mobile : +63.919-***-****
Email : ******.***********@*****.***
SUMMARY
I am an Electrical Engineer with 30 years of experience working in an independent, collaborative, and team-oriented multi-cultural environment with owners and contractor organizations in S.E. Asia and the Middle East. Consultant/Project Engineer for the construction management of New 380/110/13.8KV Substations, Modification and Expansion of Existing 380kV Substations and SVC Projects for Saudi Electricity Company. E&I Consultant for Wyeth Nutrition New Dry Blending Manufacturing Plant. Sr. Electrical Construction Engineer for Dubai Metro Rail-Red Line Project. Lead Design Engineer and Construction Management for Smart, Islacom, Ericsson and PLDT/ePLDT for Telecom Local Exchange Buildings, Greenfield, In- Building Cell sites and Hyper Data Center.
PROFESSIONAL EXPERIENCE
1.
February 2025 to Present
Design Engineer IV
Advance Technology and Life Sciences-Large Data Center Projects Fluor Daniel Inc. Philippines
• Apply cost competitive execution techniques to develop the most cost-effective total project solution for execution of the discipline engineering work.
• Develop and review project Scope of Services, Scope of Facilities (HV, MV, LV Voltage Levels), and other project baseline documents.
• Develop and build external relations with client representatives, vendors, and subcontractors and interface closely with other discipline functions promoting Client Service Excellence.
• Review vendor equipment documentation within the discipline and from other disciplines for compliance with project requirements and actively seek discrepancy resolution.
• Participate in people development by mentoring new and young engineers for competence in technical development.
• Analyze and make independent recommendations regarding solutions to problems with varying complexity in accordance with organization and/or project objectives and guidelines.
• Organize and prioritize a variety of projects and multiple tasks in an effective and timely manner, set priorities, and meet deadlines.
• Preparation of Technical Specifications based on existing standard for EPMS (Electrical Power Monitoring System) for Large Data Center Projects
• Preparation of EPMS (Electrical Power Monitoring System) Cable Schedule for HV/MV/LV systems.
• Reviews the Project Models thru Navisworks and check drawings for the design submissions.
• Incorporate health, safety, and environmental factors in design. 2. August 2023 to June 2024
Senior Project Manager-Power Systems
e-PLDT Vitro Hyper Scale Data Center Project-Sta. Rosa Laguna Kinetic Philippines Electrical Construction Inc.
• Lead the Project Management and Construction of the Electrical Works (MV/LV) of Substation, Central Utility, Admin and Ancillary Buildings.
• Lead the engineers and installation team for the electrical works, 34.5kV MV and 0.6kV LV cable pulling, termination and testing), Panelboard installation and wiring, lighting and lightning protection and equipment grounding system.
• Oversees the preparation submission of detailed drawings thru Revit for the equipment and cable tray layout based approved construction drawings and coordination with trade contractors.
• Coordination with Client and subcontractor for the Testing of MV and LV power cables prior to the installation of termination kits/Lugs at MV Switchgear, RMU, Transformers and Motor Control Panels and energization of the system.
• Leads the implementation of Occupational Health, Safety and Environment on the well-being of employees, the prevention of accidents and injuries, and the protection of the environment and the requirements of the Client and its representatives.
• Develop and review estimates and schedules, progress reports, including manpower forecasts
• Establish, track, and monitor material key quantities; provide analysis and forecasts
• Provides technical and administrative recommendation with the project team members for the Installation, T&C of the electrical scope of works.
• Prepare/review scopes of work for third party contracts
• Attends daily coordination and weekly progress meetings with Client and subcontractors having direct impact on the electrical scope of works and schedules.
• Coordination with Client requirements for technical developments, monthly billings, scheduling, and resolving engineering design and test problems.
• Develops and maintains complete project files and drawings. 3. August 2020 to May 2023
Lead Design & Project/Construction Management
DGS EDGE CORE (PLDT/Smart Data Center Project)
Elabram Systems Inc. (Ericsson PHPI-Client), Makati City
• Lead the Engineering Design (TSSR), Equipment Sizing & Calculation Specification, Construction Management of the Electrical (AC & DC), Civil Works, Mechanical and Telecom scope works for the Pilot Projects of 9 Existing PLDT/Smart-5G Edge Core Sites.
• Lead and Monitor the PDAT of Equipment (Genset, ATS, DCPP-Rectifier/Battery/DCPDU, PACU, FM200/FDAS). Review of Fabrication drawings for Panelboards and Shop drawings of site layouts.
• Manages the Design, Submission for approval, TSSR, DDD (EE-AC/DC, CW, ME Genset/PACU, FOC), BOM, BOQ, for the complete SF Scope of the project.
• Manages the Coordination with Meralco and Electric Cooperative for the Upgrade of Existing AC system (New Transformer, primary metering, termination and energization).
• Review and approve the constructability assessment of the project with all the disciplines for the civil, electrical, delivery of mechanical and telecom equipment.
• Provides technical and administrative recommendation with the project team members for the Tie-Ins to existing facilities to ensure minimal production shutdown.
• Coordination with Client requirements for technical developments, scheduling, and resolving engineering design and test problems.
• Develops and maintains complete project files and drawings.
• Evaluation & approval of contractors’ billing.
• Projects Involved:
-Renovation of Existing PLDT/Smart sites in North Luzon-6 Sites and Metro Manila-3 Sites
-Upgrade of existing AC power supply with Meralco and Coop (NL Projects) 4. May 2012 to October 2019
Consultant-Project Engineer/Construction Manager-New 380/110/13.8kV BSP S/S for Saudi Electricity Company-Western Operating Area (Client) Extra-High Voltage Projects Department
DAR ENGINEERING & CONSULTANTS, Jeddah, Kingdon of Saudi Arabia
• Lead the Construction Management Team for the New 380/230/115/13.8kV BSP, Dynamic Reactive Power Compensator, and Expansion of Existing 380kV BSP.
• Oversees the implementation of OH&S and SEC 5-Star Safety Standard.
• Manages contractor’s submittal for the review and approval from Substation Eng’g Design, Protection, Communication and Maintenance Departments and issue approve drawings & calculations for construction.
• Resolve conflicts pertaining to the PTS, drawings, and contract to ensure the projects timely completion.
• Monitoring on the installation of GIS, Transformers, Control/Protection Panels, cable laying and termination for power, control and Fiber Optic cables, HVAC and Fire protection/Alarm System and resolving conflicts on the interconnection of different disciplines.
• Prepare weekly and monthly reports for project progress and raise obstacles observed during design and construction.
• Facilitates the clearing of punch list generated during the testing and commissioning and acquire clearance for site energization.
• Conducts constructability assessment of the project with all the trades.
• Coordinates with company control and operations departments for the outage/shutdown schedule for connection to the existing 380kV network.
• Develops/maintains complete project files & evaluate/recommend contractor’s monthly billing.
• Projects Involved:
-New Al-Khuzam 380/110/13.8kV BSP (Jeddah, KSA)
-New Dynamic Reactive Power Compensation-600MVAR Capacitive & 400MVAR Reactive SVC Project (Madinah, KSA)
-New Jedddah Central 380/110/13.8KV BSP (Jeddah, KSA)
-Expansion of Al-Dhahiyah 380/115/13.8kV BSP (Dammam, KSA) 5. July 2011 to February 2012
Consultant-Electrical, Instrumentation & Control-Dry Blending Plant Pfizer Global Engineering (Wyeth Nutrition Plant)-Canlubang, Laguna
• Responsible for the management and construction of the electrical scope works for the New Dry Blending Process Plant.
• Review daily work permits and risk assessment, method statements prepared by the contractor as per the approved Loss Prevention Program for safe working conditions with compliance to the requirements of OH&S Standards and GMP (Good Manufacturing Procedures).
• Review the constructability assessment of the project with all the disciplines for the civil, electrical, and delivery of mechanical and process equipment.
• Provides technical and administrative recommendation with the project team members for the Tie-Ins to existing facilities to ensure minimal production shutdown.
• Coordination with plant end-users (Process, Utilities, Sanitation, EHS, Security) for technical developments, scheduling, and resolving engineering design and test problems.
• Witness the testing and commissioning of the LV, ELV & auxiliary systems for the Initial Qualification (IQ), Operational Qualification (OQ) & Production Qualification (PQ) of the Plant.
• Develops and maintains complete project files and drawings. Evaluation & approval of contractors’ billing.
• Project Involved:
-New Project Valentine-Dry Blending Plant (Canlubang Plant, Philippines) 6. July 2008 to September 2010
Site Electrical Engineer-110/13.8kV Substation
Saudi Electricity Company-Western Operating Area (Client) High Voltage Projects Department
Al-Gihaz Holding - Energy Construction Division, Jeddah, Kingdon of Saudi Arabia
• Responsible for the construction of New LSTK Project for multiple 110/13.8kV Substation as per SEC Engineering Standards.
• Implement all OH&S and SEC 5-Star Safety standards.
• Supervision for the preparation of floors and walls openings and cable support for the incoming and outgoing HV and MV cables, cable trays for power and interface cables at the cable basement, switchgear room, control rooms and battery rooms.
• Supervision for installation of 8 Bays-110kV Single Breaker-Double Bus GIS Switchgear, 3- 67MVA,110/13.8kV Power Transformer, 2-1.5MVA, 13.8/0.4kV Auxiliary Transformer, 40-13.8kV Switchgear Panels, 110 and 13.8kV voltage level, Feeder/Bus Bar Protection Panels, Control, Indication and Monitoring Panels (GIS-LCC, DFR, SOE, AVC, UF, UV, SCADA, Communication) and modification at the existing remote ends.
• Supervision of cable pulling and termination for HV Cable from GIS to transformer primary and MV Cable from transformer secondary to the 13.8kV Switchgear.
• Supervision for the installation, cable pulling and termination of interface/control and power cables for LCC, switchgear, protection, AC & DC distributions panels.
• Supervision for the installation of equipment/panel/indoor/outdoor structures grounding and shielding system of the station.
• Pre-commissioning for internal and interface wiring of GIS/LCC panels, 13.8kV SWGR, Protection/Control, AC & DC Distribution Panels.
• Supervision for the installation of HVAC, Fire Alarm /Fire Protection.
• Attends weekly coordination meeting with clients for project updates.
• Documentation of scheme modification and as-built plans for final acceptance and handover.
• Projects Involved:
-New Al-Haramain 110/13.8 kV Substation (Jeddah, KSA)
-New Al-Nuzla-2 110/13.8 kV Substation (Jeddah, KSA) 7. March 2007 to February 2008
Electrical Design Engineer
CZFP-Clough Zuhair Fayez Partnership
Al-Khobar, Kingdom of Saudi Arabia
• Design of Electrical Auxiliary Works in compliance to Saudi Aramco Engg Standards & Practices.
• MV/ LV Power/Control Cable Tray & grounding layout for equipment & control panels.
• AC and DC cable and conduit schedule preparation.
• Low Voltage distribution panel, lighting, and small power layout.
• Battery and Rectifier/Chargers including DC distribution layout.
• Interface with designer and documentation of Tech Bid Evaluation & Response to Bidders.
• As project control, prepared monthly billing of company PMS contract with five major currencies.
• Attend weekly coordination meetings and prepare management reports.
• Documentation of design package, transmittals, and submission as per agreed project timeline. 8. January 2006 to January 2007
Sr. Electrical Engineer-Phase 1 (RED LINE)
JT Metro JV-Japan Turkey Metro Joint Venture
Dubai-RTA (Client), Deira, Dubai, United Arab Emirates
• Lead a group of 5 Engineers with more than 120 technicians for the main station and three sections of the project.
• Liaise with Dubai Municipality for approval of Affection Plan, NOC-No Objection Certificate, DEWA (Dubai Electricity and Water Authority) and ETISALAT for utility requirements of the elevated and underground precast plants, construction offices, employees housing camps.
• Review and approve temporary/emergency electrical plans & specifications for construction of site offices and train stations.
• Safety patrol conducted in all areas with to ensure safe working conditions of personnel and contractors.
• Supervision for the installation of 11kV RMU, Switchgear, underground Cable, distribution transformers and LVSG as per DEWA standard.
• Responsible for the rental of generator sets for the elevated/tunnel construction site offices and providing power and lighting for the augering and concreting activity of civil works group.
• Prepare technical reports/accomplishments to management for on-going and completed works. Evaluation and recommendation of contractor’s billings and issuance of a certificate of acceptance.
9. December 1995 to June 2005
Technical Specialist – Engineering and Construction Management Network Services Division
Smart Communications Inc, Makati City, Philippines
• Phase I (1995-1998): Main Station – Backbone Construction
• Engineering & Construction Management of (8) Local Exchange Facility, (12) BSC & (120) Nationwide Transmission Backbone /Greenfield Cell sites.
• Design of electrical scope and preparation of specifications with compliance to the established Smart Communication Standards, latest Philippine Electrical Code and Local Government Regulations.
• Preparation of SLD, electrical loads 230V AC, 48 & 24Vdc battery/charger, service transformer, circuit breakers, cable, and generator sizing calculation.
• Management and construction of telecom facilities: Building layout, tower erection, arrangement of telecom equipment, power transformer, generator set, LVSG, battery bank, distribution panels, cable laying, termination, lighting, lightning protection, electrical and equipment grounding system.
• Testing, Acceptance of electrical scope and preparation of As-Built plans for handover to Operation & Maintenance.
• Phase II (1998-2003): Rollout – Nationwide Construction
• Turnover ten (10) energized base station per month for target rollout.
• Liaise with Government Agencies and Contractors for the complete permit requirements of Barangay Clearances, Sangunihan Resolution, Mayor & City Engineering Permits (Civil, Electrical, Occupancy & CFEI).
• Responsible for the project management of cell site works, and initiate measures to facilitate speedier completion
• Developed new procedures and methods for fabrication/erection of towers, installation of electrical/communication panels/antennas and assembly of equipment shelter.
• Attend weekly meetings with contractors regarding issues/concerns for site acquisition, LGU permit application/approval & application/contract negotiation with Meralco/Cooperative for permanent power connection.
• Responsible for the logistics of company supplied towers, equipment shelters, generators, cellular and transmission equipment delivery as per site requirements.
• Phase III (2003-2005): System Upgrade & Maintenance (ETACS-GSM-GPRS-EDGE-3G)
• Upgrade existing electrical systems in parallel to the advancement in telecommunication system.
• Conceptualize and develop programs concerning optimum energy utilization. Installation of capacitor bank at MSC for power factor correction, replacement to energy saving lighting fixtures, TVSS and recommendation for conservation of energy.
• Preparation of company standards for engineering design and maintenance. Special Projects for Maintenance of Rollout Sites: 1. Design, bid, award and fabrication monitoring of 20ft & 12ft Equipment Shelter: 600 units per year (complete with electrical panels, lighting, portholes, grounding & cooling system). 2. Design, bid, award and fabrication of Cell site on Wheels (Trailer Mounted Cell site) for temporary installation, (complete with 10ft Container Van, 25kVA Genset, 1000Li Fuel tank, 100Ft. Guyed Tower).
3. Bidding, Procurement and Acceptance for 500 units (mixed ratings) of Generator Sets complete with ATS (500, 250, 125, 60, 45 and 25) kVA. 4. Engineering, procurement, installation, and acceptance for the upgrading of 2Hp Window Type AC to 3TR Split Type AC.
5. Check of electrical (AC and DC) and mechanical equipment for operability and proper functionality.
10. June 1994 to December 1995
Supervisor-Engineering and Construction Management ISLA Communications Co. Inc., Makati City, Philippines
• Responsible for the preparation of electrical plans and specifications for greenfield and building co-located cell sites.
• Team member for Cellular rollout planning, site selection and acquisition.
• Responsible for the management and construction of Metro Manila Rollout, Liaise with Government Permits and preparation of project technical reports.
• Provide technical assistance to procurement for sourcing of suppliers for self-support/guyed towers, equipment shelters, generators and subcon who will undertake the project implementation.
• Supervise the installation of self-support and guyed towers, equipment’s from Motorola (BTS, cellular antennas, Rectifier, Battery) and Siemens (Transmission Equipment, microwave antennas) in the Telecom Shelter / Room complete with power, lighting fixtures, grounding, Window AC Units.
• Application for permanent power to all facilities and provision of 25kVA back-up generators.
• Evaluate & approve contractor’s invoice & issuance of PAC/FAC certificate
• Completed the first 24 roll-out sites in Metro manila within four (4) months for its product launching in the Philippine Market.
11. October 1992 to June 1994
Electrical Engineer-Design
Energy Management Department/Metro Manila South Civil Works PHILIPPINE LONG DISTANCE TELEPHONE CO., Makati, Philippines
• Evaluate electrical plans and specifications of new projects and upgrade of existing exchanges submitted by designers to ensure compliance with existing PLDT Engineering and Construction Standards.
• Designs and upgrade the electrical facility of existing exchanges by installing automatic capacitor banks for power factor correction.
• Responsible for the evaluation, testing and acceptance of 3, 5 &10 kVA On-line and Stand-by UPS, emergency lights and appliance/motor protector
• Conducts electrical audit to existing facilities to promote programs concerning optimum energy utilization.
• Evaluate and approve contractor’s proposals for electrical equipment, cable layouts and panel shop drawings for fabrication and installation.
• Conducts field inspection, prepares technical reports and provides technical solutions to construction issues and evaluation/recommendation of contractor billings.
• Project Involved:
-10 PLDT Zero Backlog Program for Metro Manila Subscribers.
-Design and Installation of a 90kVAR Capacitor Bank-PLDT Alabang
-Check, Evaluate and recommend for replacement for the service entrance cable at PLDT Cavite.
-Measurement of the AC System for Power Factor Correction for Manila and North Luzon sites. 12. March 1992 to October 1992
ELECTRICAL MAINTENANCE-MOTOR REWINDER
ACLEM PAPER MILLS, San Pedro, Laguna, Philippines
• Conduct routine inspection for all electrical equipment and machines (relays, contactors, motors, AC units, panelboards and breakers) to ensure proper working conditions.
• Performs cable splicing and termination, installation of circuit breakers, motors and distribution transformers including testing and commissioning.
• Performs motor rewinding of induction motors for company requirements and utilization
(2Hp to 25Hp).
EDUCATIONAL ATTAINMENT
• Bachelor of Science in Electrical Engineer, 1985 to 1990 Technological Institute of the Philippines, Manila LICENSES
• Registered Electrical Engineer, REE-20280 (Issued Aug 5, 1991/Valid-Jul 28, 2027) Professional Regulations Commission, Manila Philippines CERTIFICATIONS
• ASEAN Certified Energy Manager: CEM-PH-418-1021
(Issued Aug 5, 1991/Valid-Jul 28, 2027)
Enpap4.0, Quezon City Philippines
AFFILIATIONS
• IIEE-Manila (Institute of Integrated Electrical Engineers - NCR Manila, Phil.)-Since Jan 1991
• SCE-E (Saudi Council of Engineers-Electrical) Kingdom of Saudi Arabia, Member# 98749
–Since May 2012 (Valid until June 17,2019)
• IIEE-LIFE MEMBER #LF-007200 Since June 2002
• IIEE-ERCSA (Institute of Integrated Electrical Engineers-Al-Khobar, KSA)
-From March 2007 to May 1013
• IIEE-WRCSA (Institute of Integrated Electrical Engineers-Jeddah, KSA)
-From May 2013 to November 2019
• IIEE-MSC (Institute of Integrated Electrical Engineers-Metro South Chapter)
-From February 2020 to Present
TRAINING PROGRAMS
DATES PROGRAM TITLE LOCATION
Feb 12-16, 1996 Power Supply: Rectifier & Battery, ERICSSON COMP AB Stockholm, Sweden Feb 19-20, 1996 ELECTROMATIC-EM Generator Sets, ERICSSON COMP AB Ornskoldsvik, Sweden
Sep 21 to Oct
26, 2002
Mobile Technology Professional Program, Informatics - Certificate # I-185227
Ericsson Ortigas,
Manila
Nov 18, 2005
AutoCAD 2006 w/Color Rendering Level I & II,
Autodesk No. 09360, SM Manila
Nov.27 to Dec.
1, 2006
Cisco Certified Network Associate Program,
Global Knowledge PH No 06-640*********
Phil. Tektite, Ortigas
Manila
Dec 11-21, 2006 PC Networking and Administration, TESDA Accreditation - CAV NCR#07-01161 Pasay Manila
May 10-19, 2015 DocRev Training-SAS (Substation Automation System), Siemens Power Academy-SEC-Western Projects
InterCon Jeddah.
KSA
Nov 21-22,2016 FACTS-Flexible AC Transmission System, Siemens Power Academy-SEC-Western Projects
InterCon Jeddah.
KSA
Feb 26 to Mar 2,
2017
DocRev Training-SAS (Substation Automation System), ABB -SEC-Western Projects
Crown Plaza, Jeddah
KSA
Oct 15-19, 2017 Medium Voltage(13.8kV) SWGR NES-H Training, AlFanar Electrical System-SEC-Western Projects Jeddah, KSA Mar 18-22, 2018 Substation Teleprotection-NSD 570 (O& M) Training, ABB -SEC-Western Projects
Crown Plaza, Jeddah
KSA
Apr 15-19, 2018 Digital Fault Recorder-IDM User Course, Adwan -SEC-Western Projects Jeddah, KSA
SEMINARS
DATES PROGRAM TITLE LOCATION
May 10, 1995 Total Critical System Support
(DCDC/LIEBERT Corp.) Century Park Sheraton, Manila Sep 23, 1995 12th IIEE-Metro Manila Technical Meeting Sulu Hotel, QC, Manila Nov14-17, 1995 20th IIEE-NCR Annual National Convention PICC, Manila May 3, 1996 Power & Comm. Equipment Protection (IECEP) Manila Midtown Hotel Nov 10,1997 Lightning Protection System
(Lightning Master-USA) Dusit Hotel Nikko, Makati City May 25,1998 Power Solutions (Lucent Technologies-Bell Labs) Shangri-La Hotel, Makati City Jun 24-26, 1998 23rd IIEE-NCR Mid-Year GMM and Seminars PICC, Manila Sep 25, 1998 GEL/AGM, VRLA Batteries
(SEC IND. Battery. Co. Ltd) Shangri-La Hotel, Makati City Nov 23-26, 1998 23rd IIEE-NCR Annual National Convention PICC, Manila May 4, 1999 Transient Voltage Surge Suppression System
(DCDC/Liebert Corp.), New World Hotel, Makati City Oct 21-24, 1999 24th IIEE-NCR Annual National Convention PICC, Manila Nov 19-22, 2001 Supervisory Development Program
(SMART Com. Inc.)
Smart Tower,
Makati City
Oct 10-11, 2002 Construction Safety – Project Engineers
(Safety Org. of the Philippines, Inc.)
Smart Tower,
Makati City
Jul 16-17, 2003 Defensive Driving & Road Safety
(Green Ads Aerocheck) Westin Phil Plaza Hotel, Manila May 27-28, 2004 Repeater Systems Training (SMART Com. Inc.), Smart Sta. Ana, Makati City Nov 22, 2004 Data Comm & IP Technology
(SMART Comm. Inc./PLDT
PLDT-Dansalan,
Mandaluyong City, Manila
Jun 15, 2007 2007 IIEE-ERCSA-Mid-Year General Membership Meeting
Le Meridien Hotel,
Al-Khobar, KSA
Sep 7, 2007 IIEE-ERCSA-HV Outdoor Switchyard Design-II Al Bustan Hotel, Al-Khobar, KSA
Nov 12, 2012 17th IIEE-ERCSA-Annual Chapter Convention Le Meridien Hotel, Al-Khobar, KSA
Jun 12, 2015 Voltage Drop, Dry Trafo & Central Battery
(IIEE-WRCSA) Trident Hotel, Jeddah, KSA
Jan 15, 2016 Design & Installation-Generator Sets La Parilla Restaurant,
(IIEE-WRCSA) Jeddah, KSA
Apr 8, 2016 NEC Article 110-Electrical Installation
(IIEE-WRCSA)
La Parilla Restaurant,
Jeddah, KSA
Jun 15, 2016 2016 IIEE-WRCSA-Mid-Year General Membership Meeting and Conference Trident Hotel, Jeddah, KSA
Nov 11, 2016 2016 IIEE-WRCSA-Annual Convention &
Technical Conference Trident Hotel, Jeddah, KSA
Mar 13, 2021 MV SWGR Testing, IR and Hi-Pot Testing
(IIEE National) Zoom Online Learning
Mar 26, 2021 Protective Relaying Principles and Applications
(IIEE Kuwait) Zoom Online Learning
Apr 10, 2021 MV SWGR Technology Application and Solution
(IIEE-MEC) Zoom Online Learning
Apr 23, 2021 Short Circuit Calculation (IIEE Kuwait) Zoom Online Learning Apr 17, 2021 Electrical practitioners’ capacity upgrade in inspections, audit & safety (IIEE-TCPDC) Zoom Online Learning May 22, 2021 1ST National EE Enthusiast Summit
(IIEE-TCPDC) Zoom Online Learning
May 23, 2021 Electrical Safety Enforcement and Awareness/ Distribution System Safety (IIEE-Davao) Zoom Online Learning May 30, 2021 22nd Tech Seminar & GMM IIEE South Cavite Zoom Online Learning May 30, 2023 6th National Electrical Safety Summit Zoom Online Learning Sep 18, 2021 RA 11361 Anti Obstruction-Power Lines Act (IIEE National) Zoom Online Learning
June 3-6, 2024 IIEE-Metro Manila Regional Mid-Year Conference The Tent, Alabang MTL City Dec 6, 2024 IEC TC 64 INDUSTRY TECHNICAL EXCHANGE MOA Square Auditorium Apr 12, 2025 2nd Saturday-DATE WEBINAR Series 2025
“Grounding and Bonding” Zoom Online Learning
May 1-3, 2025 IIEE Metro Central MY & GMM Conference Novotel Hotel, QC May 7, 2025 Solutions to Improve Construction Workflow Hilti Spec2Site-Hiti Philippines Inc.
Fluor Daniel,
Muntinlupa City
May 24-25, 2025
IIEE MSC MY&GMM: Powering Tomorrow:
Technological Advancements in Renewable,
Alternative Energy, and Data Facilities
Mpire Center, Cubao QC