Email ID: *********@*****.***
Contact No. :+91-969*******
Father Name : BASKAR
Date of Birth : 24.06.1990
Educational Qualification : Diploma (CIVIL)
Nationality : Indian
Religion : Christian
Marital Status : Married
Language Known : English, Tamil, Malayalam, Hindi
Permanent Address Present Address
12 56, NORTH STREET
PERUMANAL, TIRUNELVELI DIST,
PIN: 627106, TAMIL NADU, INDIA
12 56, NORTH STREET
PERUMANAL, TIRUNELVELI DIST,
PIN: 627106, TAMIL NADU, INDIA
DOCUMENTS DETAILS
Documents Number Date of Issue Date of expiry Place of Issue INDIAN CDC MUM 600***-**-**-**** 26 05 2035 Mumbai Passport W4553172 10-11-202*-**-** 2032 Madurai
COP
( Panama )
PAM LIM ASD AB06441 21-11-202*-**-** 2029 Panama
H
SEA EXPERIENCE
COMPANY VESSEL NAME TYPE LOCATION Sign on Sign Off POSITION Hind Offshore Sea Stallion Accommodation
/Hook up Barge INDIA 01 Jun 2024 20 May 2025 AB
Swiber Swiber Conquest
Pipe Laying &
Accommodation
Barge
INDIA 18 Feb 2022 07 Mar 2024 AB
SAHAYA ARUL JALOUSE
AB / RIGGER
PERSONAL DETAILS
Email ID: *********@*****.***
Contact No. :+91-969*******
OFFSHORE COURSES :
BOSIET
H2S
COURSE DETAILS
Document Number Date of Issue Place of issue Validity PSSR
4020126101250185 05 04 2025 Thoothukudi 04 04 2030 PST 4020126101250185 05-04-2025 Thoothukudi 04-04-2030 FPFF 4020126101250185 05-04-2025 Thoothukudi 04-04-2030 EFA 4020126101250185 05 04 2025 Thoothukudi 04 04 2030 STSDSD 4020126621250205 08 04 2025 Thoothukudi Unlimited DUTIES& RESPONSIBILITIES
Inspection of tools and tackles.
Inspection record on the lifting equipment’s.
Ensure periodical colour coding of the lifting equipment’s.
Communication between the lifting team.
Conducting and monitoring tool box talk.
Study the location before lifting.
Lifting hazard identification and control.
Selection of crane for each lift with proper safety factor.
Ensure competent persons for lifting & slinging activities.
Preparing lifting plans according to the nature of the job as simple and complicated lifts.
Getting approval from the supervisor for the lifting plans and alters it according to the hazards. ROUTINE WORK
Performs a variety of rigging activities associated with the operation of offshore cranes and winches, acts as crane banks man during the loading / unloading of materials and supplies on the barge/super complex.
Performs lifting operations during the shutdown and when required by the site, ensures safety of personnel and equipment, checks all slings, mooring wires, ropes and lifting gears are in good operating conditions, checks frequently, as per the maintenance schedule program that all lifting equipment are in a safe and good conditions
Operates pull lifts, chain blocks, rope blocks, pneumatic / electric winches as required.
Email ID: *********@*****.***
Contact No. :+91-969*******
Performing rigging duties on dismantling static
equipment like removal of exchanger bundles, valves pipe work and equipment internals, assist pipe fitters and helper in spading and man way opening and box up as required etc.
Checks weight and size of loads and determine rigging equipment required.
Undertakes rigging of all lifts according to rigging practice and safety rules
Can be work in scaffolding, overboard scaffolding.
Confined space (if required) with taken all safety and precautions according to the risk assessment and PTW (permit to work)
Store & Routine Maintenance a) Keeping an up to date inventory of all lifting equipment held in the Barge/ super Complex rigging stores.
Keeping an up to date register of lifting equipment issues from the rigging stores plus details of the user and location.
Checking visually all equipment in the stores and it is returned and maintaining it as per the recommended maintenance procedures.
Ensuring all lifting equipment is made available to the inspection engineer for inspections. Following inspection, he will be responsible for color coding the equipment and informing the mechanical supervisor of any repairs, which may be required.
Coordinating all lifting operations on the Barge/Super Complex, ensuring that correctly rated equipment is used with correct lifting procedures.
Safety Adheres to the Company’s safety policy, standards and procedures while performing rigging jobs.
Ensures that safety equipment under custody is in proper condition.
Attends regular safety meetings with the workforce Work relations has a direct contact with the crane operators and personnel involved in the rigging operations.
Latitude Reports to supervisor when assigned to work, works according to standard procedures and following instructions, has a certain amount of latitude in deciding how to perform each task, work is supervised and checked closely by supervisor or foreman. IN CONSTRUCTION HANDLED
Involved In Pre-Commissioning & Commissioning Activity, Given Rigging Assistance For Hydro Testing, Air Blowing & Blasting, Leak Test, Pressure Test, Chemical Cleaning, Oil Flushing, Pigging & Nitrogen Purging.
Email ID: *********@*****.***
Contact No. :+91-969*******
IN MAINTENANCE HANDLED
Removal and reinstall ( after calibration ) of valves( Gate, Globe, Butterfly, Ball, Choke, Check Valve Control, PRV, NRV, ARV, PCV, LCV, XCV, FCV, PSV) Pumps, Motors,Tube bundles, Compressors, spool pieces, level gauges, shaft and also attending breakdowns. IN OFFSHORE
I handled loading and offloading of materials and supplies on the barge/super complex. Performed lifting operation maintenance shutdown. Performed lifting operations of lifting and material handling equipment, cranes, overhead cranes, lifting gears. Operates pull lifts, chain block, rope block, pneumatic/electric winches. Performed rigging duties on dismantling static equipment like removal of exchanger bundle, valves pipe work and equipment internals, assisted pipe fitter and helper in spading. Also erected structures, beams, pipes, valves, etc. laying hoses from platform to boats for chemical transaction, and also lifted chemical tanks from boats to deck & platform, attended each & every shutdowns. All offshore installation handled very well. Involved in Well Conversions for Water Injections and Gas Injections. Lifting Operation performed for flow line and also choke valve.
Date : YOURS TRULY,
Place : SAHAYA ARUL JALOUSE