Post Job Free
Sign in

Production Technician Field Specialist

Location:
Midland, TX
Posted:
August 23, 2025

Contact this candidate

Resume:

CURRICULUM VITAE

I. Production Technician & Artificial Lift Field Specialist

Ange Doudet Adimatcho

TEL: +1-432-***-****

Address: *** **** ******* **** ******* TX 79703 USA EMAIL ADDRESS: **********@*****.***

ACADEMY BACKGROUND

- 2021 Midland College Associate of Petroleum Energy Technology

- DECEMBER 2006: Advance Diploma of Technician in Telecoms System at CGA Accra-Ghana

- JUNE 2006: Diploma of Technician in Telecoms System, WPI Institute Accra-Ghana June 2005: Certificate of Technician Telecoms System in WPS Institute Accra-Ghana JUNE 2004: Proficiency of English Language at Greenwich International Institute Accra – Ghana

- JUNE 2003: Bac “C” Math-Physic, Higher School Franco-anglais, Ndjamena-Chad ACADEMY & FIELD EXPERIENCE BACKGROUND &SKILLS

- Petroleum Industry

- Distributed Control and Programmable Logic

- Networking Technologies

- Pumps, Compressors and Mechanical Drives

- Electronic Troubleshooting, Service and Repair

- Basic Fluid Power (Hydraulic & Pneumatic)

- Industry Automation (Programmable Logic Controller) Allen Brandley RS Logix 5000

- OSHA

- Mechanical Skill for Energy

- Corrosive Basic - Industrial Mathematics

- Implementing and Supporting Client Operating System

- Petroleum Instrumentation

- Reservoir Recovery and Production Methods.

- ARTIFICIEL LIFT:

- ELECTRICAL SUBMERSIBLE PUMP

- PDI (Pre Deliverance Inspection), ESP Installations (RIH) & ESP Pull Out Of Hole - Y/Tool Job, Packer Job, Shroud Jobs . - Shimming and Splicing - Spooler set up.VSD Toshiba & Sensia Troubleshooting

,change parts (IGBT,Control Board,Interface Board,Jumber Board

,TVSS,Fusses,Diodes,Instruct...)Productions Optimization, Transformation test, tap Calculation. Mounting &Commissioning SCB3&20,Gateway

- Cable and Motors test using Megger, Fluke and Uniconn,Instruct Schlumberger for downhole gauge Reading. - Phase Rotation and sequence Test -ESP Equipment’s sizing

and Application -Motor and Seal Oil fill Service. Well Start UP.

- PROGRESSING CAVITY PUMP (PCP) -,PCP Installation(Assembly) and Dismantling (Pull out) –

Space Out – Drive head Installations – Connection of suckers rods, pony rod – IPCP (Insert Progressing

Cavity Pump) DST Job with PCP and IPCP 's Strings

- PLANT PRODUCTIONS TECHNICIAN

- Isolations of lines for pigs lunching from SPT (southern production terminal) to LACT (lease automatic custody transfer) and pigs receiving from Mangara to SPT,Plant Processing and Troubleshooting (heater treater tripped, pressure control valve,level control ) . PID and

PFD knowledge,Recycling from tanks to treaters via recycle pumps 212, Transfer and Exports Pumps Start

up and shut Down,Sampling for analyzing (Pour point Test, Total Petroleum Hydrocarbon Test, Basic

Sediment and Water Test ) assist Control Room Operator, Heater Treater Flushing, Flare System

Draining and Troubleshoot, Line up water Removal Unit (tank 500) to Wetland,Line up Water Removal Unit (tank 500) to receive water (- from CPF (Center Production Facility) to Tank 500, Line up the recycle line, Skimming from Water Removal Unit to Heater Treater or Vacuum Truck via skimming pump 502, Parameters taking of Facilities (Water Tank, oil Production and Export Tanks, Heater Treater, Inlet and outlet

flow line),Compressor Screw & Reciprocating ) Inspection,Mini Troubleshoot,Monitoring. Gauge the Tanks - Daily monitoring of multiple wells site by vehicle - Test, Calibrate and Troubleshoot Equipment, ESDV reset and mechanical problems.

Job is to be performed employing safe work practice while utilizing acceptable Environmental procedure to maximize earning while minimizing cost assigned oil and gas producing

.Wellhead and Flow line Daily reading record. Installs, commissions, Maintains, and other rotary equipment, Burner Monitor systems. - Installation and repair of electrical, electronic, and pneumatic

- PLC & DCS

(CONTROL ROOM) -

AUTOMATION OF OIL WELL

- PLANT MONITORING & PLANT

INSTRUMENTATIONS (Installation, Calibration, Repair)

, HEATER TREATER, SEPARATORS (Phases 2&3)

WORKS EXPERIENCES (Onshore and Offshore)

-From October 2023 to May 2025 Schlumberger as ESP Field Specialist

-From February 2023 to September 2023 New Fortress Energy as Gas Processing Operator

- From October 2022 to January 2023 Subsea Technician Oceaneering International

- March 2022 to Now Cimarron Energy Field Technician

- January 2019 to November 2019 HALLIBURTON SPERRY Drilling as Downhole Tool Mechanic Tech

- June 2015 to June 2017 Glencore Explorations &Productions as Production Operator

- September 2013 up March 2015 SCHLUMBERGER ARTIFICIAL LIFT As: Artificial Lift Field Specialist,

TOTAL - Exploration and Production in Bugungu Project (UGANDA), PERENCO Exploration and

Production Project: Tchatamba, Oba, Nyougo, Olende (GABON)

- From January 2009 to December 2011 with WOOD GROUP ESP As: ESP and PCP Field Technician ESP

(Electric Submersible Pump), PCP (Progressing Cavity Pump)

- SAFETY KNOLEDGES:

- OSHA Programs

-Schlumberger QSHE Level 2 Certificate

- OPITO Approved Bosiet with CA – EBS Certificate

-TWIC Card

-Swing Rope/ Personnel Transfer

- LOTO

-Basic Rigging

-Fall Protection /Working at Heights

-First Aid/CPR/AED

- PEC Card

- OSHA 10 Hour General Industry Safety and Health Card



Contact this candidate