Post Job Free
Sign in

Project Engineer Construction Manager

Location:
Fredericksburg, VA
Posted:
August 22, 2025

Contact this candidate

Resume:

TROY C. DAVIS

**** ******** **** ***** ***** 540-***-****

Fredericksburg, VA. 22407 ****************@***.***

Past Construction Work Experience

Mr. Troy C. Davis has 26 years of extensive experience in the field of construction inspection as Construction Manager, Project Engineer and Senior Inspector, on VDOT bridge and roadway projects. Mr. Davis’ past project experience includes Bridges; project showings; pre-construction and construction progress meetings; bridge superstructure replacement, grading, drainage, water and sewer, substructure repair, and widening; pile driving; structural steel; bolt tensioning; precast and cast-in-place concrete; deck grooving; silica fume and latex deck overlays; integral back walls; approach roadway stabilizing and paving; box culverts; curb and gutter; retaining walls; bridge painting; and erosion and sediment control. He is familiar with documentation procedures including work orders and change orders, source of materials submittals, daily diaries, safety reports, material books, monthly estimates and construction workbooks.

Mr. Davis’s past work experience include:

Capital Project Inspector-City of Manassas City-Wide Capital Projects Construction Cost: $400,000 Completion Date: August 2014.

Inspected the daily progress of multiple construction and utility projects; determines conformance with local, state and federal laws, codes, standards, and specifications; performs duties associated with site inspections; determines if active construction sites meet or exceed the requirements of the Virginia Work area protection standards; creates technical punch lists to ensure contractors and utility providers are complying with standards and specifications; issues code violations as needed; maintains all related documentation.

Project Inspector-McKissack & McKissack, Inc. City-Wide Sidewalk, Curb and Gutter Maintenance Project, District of Columbia, DDOT, Construction Cost: $3 million, Completion Date: December, 2012.

Responsibilities included inspection of all contractor activities related to the project, sidewalk; curb and gutter; retaining walls and traffic control. Documenting all pay quantities, keeping daily log of project activities, and assuring all inspection and testing was performed in strict compliance with DDOT standards and specifications.

Construction Manager-DEVCON Contracting, Inc, Richmond, VA. Construction Cost: $1 Million, Completion Date: December 2011

Compose letters and reports documenting construction activities. Prepared routine correspondence and reports detailing status of construction projects. Provided technical analysis and expertise to resolve construction problems. Performed construction project management work including review and approval of contractor material submittals and payment invoices. Provided a common approach to construction safety and awareness. Conducted training sessions on referenced documents related to safety such as VDOT Specifications, Work Area Protection, Manual of Uniform Traffic Control Devices (MUTCD), VDOT Flagging Certification and OSHA Regulations.

Project Consultant-Belcher Consultants, Alexandria, VA. Construction Cost: $100,000, Completion Date: January, 2009

Performed the audit of VDOT contract final records to determine that the records and final pay quantities represent an actual representation of the work done by the contractor on a project.

DBE Program Consultant-Woodrow Wilson Bridge Project, Alexandria, VA. VDOT, Construction Cost: $2.5 Billion, Completion Date: May, 2009

Project experience included direct construction management and engineering assistance and consulting services to minority, disadvantaged and women-owned businesses (SWaM/DBE) that are engaged in or desiring to bid on the Woodrow Wilson Bridge Project. Advise VDOT and FHWA on the status of DBE matters by way of a monthly report regarding the concerns, issues, challenges and achievements of the program efforts on a monthly basis. Work with VDOT to establish the overall annual goals for the DBE program as they relate to the Woodrow Wilson Bridge Project.

Senior Inspector-Interstate 66/Fairfax County Parkway Interchange, Fairfax, VA, VDOT, Construction Cost: $7 million, Completion Date: August, 1998. Inspection activities covered all phases of bridge, traffic signal, and roadway construction. Responsibilities included work orders, source materials submittals, daily diaries, material books, monthly estimates, construction work book (CWB), sublet request evaluations, EEO documentation, as builds‘, erosion and sediment control reviews, payroll certifications, project closing documentation, and claims reviews.

Senior Inspector-Route 1/Woodlawn Road Intersection, Fairfax, VA, VDOT, Construction Cost: $300,000, Completion Date: July 1997.

Responsibilities included monitoring contract progress and ensuring that project milestones were met, including drafting correspondence, preparing work orders, keeping daily diaries, reviewing invoices, preparing monthly estimates, and conducting weekly safety training for the inspector teams.

Senior Inspector-Beulah Road/Fairfax County Parkway Interchange, Springfield, VA, VDOT, Construction Cost: $2.5 million, Completion Date: September, 1996. Responsibilities included supervision of various types of construction to ensure that the contractor’s performance was in compliance with VDOT specifications and standards, including grading, as-built reviews; traffic signals; and erosion and sediment control, traffic control, structures, and retaining walls. Kept the daily diary and materials book.

Senior Inspector-Fairfax County Parkway/Telegraph Road Interchange, Alexandria, VA, VDOT, Construction Cost: $18 million, Completion Date: June, 1996.Project experience included bridge superstructure replacement, substructure repair, and widening; pile driving; structural steel; bolt tensioning; precast and cast-in-place concrete; deck grooving; bridge painting; silica fume and latex deck overlays; integral back walls; approach roadway stabilizing and paving. Inspection activities covered all phases of bridge, traffic signals, and roadway construction.

Senior Inspector-Northern Virginia District-Wide Maintenance Surface Asphalt Project, Fairfax County, VA, VDOT, Construction Cost: $3 million, Completion Date: December, 1996.Project involved reconstruction and repair of asphalt pavement at various locations in Fairfax County. Responsibilities included inspection of all contractor daily work activities, as-built reviews; traffic control; and erosion and sediment control coordinating inspection staff, keeping daily diaries, preparing monthly estimates, and reviewing invoices.

Senior Inspector-Route 29/Graham Road Intersection, Merrifield, VA, VDOT, Construction Cost: $1.5 million, Completion Date: June, 1995.Responsibilities included inspection of all contractor activities related to the project, curb and gutter; retaining walls; as-built reviews; traffic signals; and erosion and sediment control, traffic control, documenting all pay quantities, keeping daily log of project activities, and assuring all inspection and testing was performed in strict compliance with VDOT standards and specifications.

Senior Inspector-Franconia-Springfield Parkway/Fairfax County Parkway Interchange, Springfield, VA, Virginia Department of Transportation (VDOT), Construction Cost: $50 million, Completion Date: April, 1994.

Project experience included bridge superstructure; substructure repair, and widening; pile driving; structural steel; bolt tensioning; precast and cast-in-place concrete; deck grooving; bridge painting;; integral back walls; approach roadway stabilizing, grading, drainage, water and sewer and paving. Responsibilities included supervising project staff, performing inspection of all contractor activities related to the project, negotiating changes to scope with contractor, documenting all pay quantities, keeping daily log of project activities, and assuring all inspection and testing was performed in strict compliance with VDOT standards and specifications. Monitor the work of contractors to ensure quality control and contract compliance for roadway, structure and bridge construction projects of moderate to considerable complexity. Responsibilities also included performing work zone safety checks and environmental control checks.

Senior Inspector-Northern Virginia District-Wide Maintenance Curb and Gutter Project, Fairfax County, VA, VDOT, Construction Cost: $650,000, Completion Date: February, 1993.

Responsible for project inspection, as-built reviews; traffic control; and erosion and sediment control. Testing concrete and soil compaction, keeping daily log of work activities, and preparing monthly estimates.

Senior Inspector-Edsall Road Bridge over Interstate 95, Alexandria, VA, VDOT, Construction Cost: $150,000, Completion Date: January, 1992.

Project involved replacing external beams with shallower beams to increase the clearance under the bridge. Responsibilities included documenting all pay quantities, keeping daily diary of project activities, and assuring that all inspection was performed in strict compliance with VDOT standards and specifications.

Project Manager-Fairfax Maintenance Facility and Garage, Fairfax, VA, VDOT, Construction Cost: $5,952,000, Completion Date: August, 1991.

The project involved new roadways, sidewalks, a courtyard and landscaping associated with the new building. Provided scheduling services and Reviewed cost estimates for this garage that will be designed to accommodate 4,300 parking spaces on five levels, and will include all building systems including entrance/exit plaza revue control systems. Site work included the design of new ramps, signage and signal systems. Provided scheduling services for the renovation and new addition to the building. The project involved removal and replacement of the existing building’s roofing system and windows; and repair to its exterior facade.

In summary, Mr. Davis has extensive experience in the following areas: Construction Management; Project Management including: Road and Bridge Specifications; Buildings; Bridges; Pavements; Grading; Erosion and Sediment Control; Traffic Management Systems; Project Closing Documentations Final Audits and Final Estimates; Value Engineering; Cost Estimating, Constructability Reviews; Project Schedule Reviews and Monitoring including CPM; Claim Analyses and EEO documentation



Contact this candidate