RESUME
NAME: HARNISHKUMAR SURESHCHANDRA BHATT
ADDRESS: PLOT NO.2908, Email address: *************@*****.*** 302,katha appartment,.
Jaldhara square, Mobile number: +918*********
Kapodra patiya
GIDC, Ankleshwar 393002
Professional Objective:
Contribute to the organization with best efforts in achieving organization goals in the field of ELECTRICAL ENGINEERING to develop and sharpen existing skills and capabilities to deal with new challenges. Educational Qualifications:
EXAM BOARD YEAR OF
PASSING
PERCENTAGE
DIPLOMA
ELECTRICAL
Technical
Education Board
1994 51.1%
H.S.C.(SCI.) G.S.E.B
GANDHINAGAR
1991 35.00%
S.S.C G.S.E.B
GANDHINAGAR
1987 79.50%
Project in Last Semester: 150-watt inverter
Equipment: -12v battery, inverter transformer & electronic circuit. Certificate of competency: - permit for electrical supervisor (Govt.) permit no: G/AS/E-14318
PROFESSIONAL EXPERIENCE
** Presently Working as Electrical Supervisor with Dangote Oil & Refinery Company, Nigeria through ANI Integrated Services limited from 21 st
July 2023 to till date.
Job profile : Electrical Commissioning work and Testing of Electrical Erthing System lighting system,LV & MV motor testing,Control and power Cable,Glanding Termination
,P.C.C,& M.C.C., Battery bank, UPS & Power & Distribution Transformer installation testing &
. as per PTW Procedure.
**J.K.Enterprise, Bharuch
As a Electrical Supervisor for Running Plant contractual work And shutdown project work for Abott Pvt Ltd .Jhagadia. Gujarat since 23/11/2021 to 10/07/2023. ABROAD EXPERIENCE -:
Madina Group of company WLL Qatar
For SHELL GTL (Qatar )
From 22/12/2018 to 19/03/2019
Sr. Lead Electrical Technician
JOB RESPONSIBILITIES
TPSP, site fecilitie work & Genretor & Tower lighting . as per PTW procedure (AAPA) for SHELL GTL standard .
Earthing system & all types of Lighting system maintenance, Emargency Light, Normal Light etc..
PCC, MCC,Transformer, maintenance.
Glanding & Termination & cable preparation work,battery 2
maintenancework .
Restricted AUTHORISED GAS TESTER (RAGT) for ASU PLANT . Heavy Engineering Industries & shipbuilding Co. K.s.c (public) Foreman Electrical
From 05/12/2016 TO 27/02/2018
Electrical Foreman
JOB RESPONSIBILITIES
Electrical Commissioning work and Testing
Electrical Erthing System lighting
installation,motor connection,Control and
power Cable laying,Glanding Termination
,P.C.C,& M.C.C Battry bank,Cable Tray work
Transformer installation testing for KOC. as
per PTW Procedure.
Qatar Engineering & Construcation Co.W.L.L
For shell & pearl GTL,ASU Plant MTA. And
For Ras-Gas company limited Qatar.
From september 2014 to may 2015
Electrical Supervisor :
JOB RESPONSIBILITIES
Site facility electrical works, like generator
installation, lighting installation, power management system, PTW procedure, safety trainings during
shutdown work.
Qatar Engineering & Construcation Co.W.L.L
For SAMSUNG Engg(Lafan refinery DHT) Project
From 9th July 2013 to 31st oct. 2013
Electrical FOREMAN :
JOB RESPONSIBILITIES
Commissioning & testing M.C.C. & P.C.C. battery bank maintenance. Module testing power and Control Cable laying, Glanding, Termination. Cable tray work,
earthling system and lighting system work.
Qatar Engineering & Construcation Co.W.L.L
For Ras-Gas company limited
From 13th Sept. 2012 to 29th Oct. 2012
From 12th Jan. 2012 to 1st Jun. 2012
Electrical Supervisor :
JOB RESPONSIBILITIES
Site facility electrical works, like generator
installation, lighting installation, power management system, PTW procedure, safety trainings during
shutdown work.
INDIA
HARSH CHEMICALS,ANKLESHWAR P
From 15th Nov 1993 to 15th oct 1994
Electrical Supervisor :
JOB RESPONSIBILITIES Electrical supervision for running plant work. 3
LT power and lighting installation work,
troubleshooting work for plant, AC- DC motors
,generators, transformers, drives, PCC MCC
manufacturing work etc.
SPECIAL PRINTS LIMITED,SURAT
From 9th march 1995 to 8th march 1996
Electrical Engineer :
JOB RESPONSIBILITIES
AC-DC motor maintenance, transformers, drives.
Maintenance and Trouble shooting of all types of
electrical equipments and Preventive Maintenance etc HV, MV and LV switch Gears, Transformers, Relay
Panel, Breakers, MOV’s, HVAC, MCC, and Distribution Board’s.
CHEMOX CHEMICAL LIMITED
From 5th apr 1996 to 5th nov 1996
Electrical Engineer :
JOB RESPONSIBILITIES
RunningPlan&UtilityTroubleshooting,PCC,MCC,transforme rs,
CT-PT-units, DG set, etc.
PETROFILS CO-OPERATIVE LIMITED
From 14th july 1997 to 17th march 2001
Technician Gr-3(Electrical) :
JOB RESPONSIBILITIES
HT-LT motors, PLC, UPS(NELCO make), power
invertors, transformers, CT-PT units, 132 kv
substations. lighting work, ACB,SF6 circuit breakers, relays, VFD 5HP to 100HP make-Allen Bradely,
yaskawa, Siemens.
GPIPL,ANKLESHWAR ( GREEN POWER INTL PVT LTD)
From 5th oct 2006 to 7th oct 2010
Electrical Supervisor :
JOB RESPONSIBILITIES
Operation and maintenance of dewts gas engine(1364 kw * 5).13th rack PLC,PCM 1G relays, control panel, battery bank, battery chargers, LT switchgears, PCC MCC. Capacitor bank, schedule checking work.
Execute field electrical maintenance activities in accordance with maintenance schedule.
Read electrical schematic drawings and
troubleshoot abnormalities arising in the plant.
Engine monitoring system
Lube oil system
Gas system
Electrical system
TEM control systems
Speed governing systems
Cooling system
Exhaust gas system
Log sheets, weekly, monthly, generation
reports and other work connected with captive
power plant.
Total EXPERIENCE: 15 years
GULF EXPERIENCE: 4.5 years
4
Personal Detail :-
Date Of Birth: 6/12/1971
Marital Status: Married
Languages Known: English, Hindi & Gujarati
Passport NO.-U4695615
Date of Issue: 23/10/2020
Date of Expiry: 22/10/2030
Personal traits and abilities:
Ability to adopt well people and adjust to new and changing situation.
A keen attitude for learning new technologies.
Teamwork motivation
Salary Expected:
As per company norms
Statement:
The above data & facts I have mentioned are true to the best of my knowledge. As and when required, I shall produce the necessary supporting documents. HARNISH BHATT