Jun. 2011 - Dec. 2011
• Estimating with Plans Planswift
Software. • Studying construction
specifications to determine installation
requirements and procedures. •
Preparing equipment and tools,
including scaffolding, ladders, tape
measures, straightedges, hand tools,
and power tools. • Chalk lining
references lines and points to level
metal frames and furring channels. •
Measuring and cutting metal runners,
studs, and furring channels to required
sizes. • Installing horizontal and
vertical metal studs to frames to
attach wallboards. •Measuring, cutting,
fitting, and fastening drywall boards
onto the frames. •Cutting tidy openings
into boards for electrical outlets, vents,
and fixtures. • Installing metal framing
and decorative trim for windows,
doorways, and vents. • Supervising
general construction workers, when
required. • Ensuring compliance with
construction industry specifications
and safety standards.
JONATHAN AGUILAR
To work in an environment which encourages me to succeed and grow professionally where I can utilize my skills and knowledge appropriately.
Performance Contracting Inc. UNION
Journeyman
Kaiser Hospital @ Ontario, CA.
OSHPD Project.
Metal Framing & Hanging Drywall. I
would check everybody’s work, QC. I will Frame Exterior and
Interior Heavy Gauge Framing. I frame Soffits, Fire Rated walls,
Curtain Walls, Install Metal Backing for all mounted wall Items.
Read plans, Layout where backing need to be installed Performance Contracting Inc UNION
Leadman
Saint John’s Hospital @ Santa Maria, CA OSHPD
PROJECT
Hands on, Metal Framing Exterior and Interior
Heavy and Light Gauge Framing, Install Backing for Exterior Trips,
Expansion Joints. Install Hollow Metal Doors. Hang Drywall
Interior and Densglass Exterior. Install Lath, Trims, Expansions,
Paper, Milcore ect. Layout walls Interior.
Performance Contracting Inc. UNION
Leadman
Bob Hope @ Los Angeles, CA.
Layout, Metal Framing, Drywall, Shaft walls,
House Keeping, Suspended Ceilings, QC, Pick up.
Fire Rated Walls.
SKILLS
OBJECTIVE
EXPERIENCE
*****************@*****.***
Rialto, Ca
"Adaptable Team Player With
Expertise In Metal Framing & Drywall”
Jan. 2012 - Dec. 2012
Jan. 2013 - Aug. 2013
Sep. 2013 - Jan. 2014
• Read Plans, Layout at its finest. •
Interior & Exterior all types of Metal
Stud Framing. • Drywall. • Install FRP. •
Exterior Lath. Installing Black Paper,
Trims, tying wire, etc. • Some Welding.
• Installing Doors. • Estimating
Projects size $20k to $2M. using
Planswift software. • Computering. •
Project Managing. • Billing. •
Communication.
Date of Birth : 12/20/1991
Language : • English. • Spanish.
Performance Contracting Inc. UNION
Leadman
"Disneyland Star Tours".
"Disneyland Goofy’s Kitchen".
"LAX Airport"
"Targets".
"Malls". Etc.
I would perform Layout, Metal Framing, Drywall,
FRP. On these
projects for Performance Contracting Group.
The Raymond Group UNION
Leadman
The L.A. Forum @ Inglewood, Ca
Layout, Metal framing Radius, Fancy Framing,
Install Doors, House Keeping, Drywall, Soffits, Sound Walls, Fire
treated Walls, QC make sure inspections will pass. The Raymond Group UNION
Leadman
Wilshire Hotel @ Los Angeles, Ca
QC, Metal Framing, Drywall, Sound Walls, Layout.
PERSONAL DETAILS
Feb. 2014 - Mar. 2015
April. 2015 - Jan. 2020
Zenith Construction Inc.
Estimator/ Project Manager/Foreman.
I was Awarded 10 Projects and managed them from
Scratch Layout to 100% Completed Finish.
•Projects were: Specialty Café, Jimmy Johns
Restaurant, ZO Skin Health,Elements Massage.
Several Western Dentals, Tenant improvements.
I would Estimate the project, send a proposal out, follow up, attend Kickoff meeting, perform Layout, send 20-day Prelim out, put man power on project, run project, schedule Inspections,
order material, follow scheduling, submit Billings with their Conditional Lien Waiver, receive Check send out Unconditional.
Finalize project, Punch list, send out project warrantee. Aguilar Drywall
Project Manager/ Superintendent
Many Tenant Improvement projects
Projects from $50k to $2M size projects, did
Interior and Exterior, I ran the field from scratch to end Layout,
Exterior and Interior, Heavy gauge framing, Densglass, Frame
parapet 2 Story building, Billings, Change orders, RFI’S, communication with other trades. Complete project on schedule
and within budget.
Journeyman/ Leadman
Many Tenant improvements projects, Hospitals, OSHPD Projects. Etc
Superintendent
Temecula Medical Building.
Some Oshpd Projects
PROJECTS
Project Engineer
I've Estimated over 50 projects and been awarded more then half, communication is very important, I managed all size projects and been very successful in my career.
• Disneyland Projects Goofy’s Kitchen
• Many Targets.
• Tenant improvements.
• San Manuel Casino.
Etc.