Willie T. Perkins, III
Direct Line Career Highlights and Projects
Goal: Consideration for the Technician II: Level III position.
Personal Statement: After reviewing the qualifications for the Technician II: Level III position, I believe that I have proven my ability to handle the position, through skill, accomplishments and interaction with fellow employees, customers, Team Leads and management. The following is a comparison between the Technician II position requirements and my career skills and accomplishments with Direct Line during my tenure with the company.
Technician II: Level III qualifications:
Able to troubleshoot both copper and fiber cable.
Able to test both copper and fiber cable.
Accept responsibility of outcome of work performed.
Knowledge and use of basic telecom hand tools must understand customer service.
Clear understanding of job safety requirements.
Able to read and understand job floor plan.
Familiar on wiring schemes and wiring testing.
Able to pull all types on low voltage cables.
I understand and capable of performing field terminations and labeling.
Able to maintain orderly paperwork, capable of running midsize projects and service jobs.
Possess skill to layout mdf and idf closets, able to dress all types of cable and perform all types of terminations.
Capable of working in data center.
Able to patch network equipment.
Able to report operations manager and take daily direction from lead technician, senior technician and advance senior technician
Skills:
Proficient with all on site test gear; JDSU LS & PM, Fluke, EXFO, OTDR
Excels in fiber troubleshooting
Able to manage large ticket que and stay within the allotted SLA’s timeframe
Proficient in all device installations from Arista 7010 to larger arista 7516
Ability to understand portmaps and procedures
Capacity to conduct a professional relationship with fellow employees and the customer
Achievements:
SLA Highest approval rating
oASH2.5 100G Augmentation: T42802120 (Lead)
Overview: Removal and installation of 80 Arista 40G chassis with 100G models and recalling
Highlights:
First post removal and installation of 20 devices within a 12-hour timeframe, with zero cross connections or down links and only one low light: P62290762
Received commendations from customer acknowledging the speed and accuracy of the completion of project.
oSmart PDU Install: T42516765 (Lead)
Overview: Installation of new equipment designed to increase productivity and efficiency.
Highlight:
Managed ASH2 100G Augment Project and the Smart PDU Install simultaneously.
oAsh3.13 & Ash6.6 100G Augmentation (Co-lead)
Overview: Removal and installation of over 8,000 optical transceivers