Ironwork:
ller,Tek -C&D battery racks(8 and 16 foot)
-Cable rack,Aux bar,battery strand support etc.
-USWEST zone for earthquake support
-Built from either ceiling mounted instruct or floor mounted stanchions
-CLEC bay into both existing and new lineups
-Fiber optic traysand rack open.
Equipment:
-Notel-OC48 OC12 OC3 OC192 Access nodes transport nodes
-Fujitsu-FLM-150/300/600/2400
-Cisco-FLM2400 etc.
-RC28,repeater,UE9000
-C&D batteries1680 and 4000
-Lucent/At&t and Lorain rectifiers200,400AMP
-Cable and Wiring:
-750 MCM thru 12AWG power and ground.
-Hle splice,VOLT TELCOM
Contrator for Pac-Bell in San Francisco,CA
ydraulic and manual crimping and H-Tapping
-Wire warp and crimp quick-connect termination.
Lacing and Dressing:
12 to 100 pairs 22 thru 28 AWG transmission cable
extensive wire wrapping and dress
-DS-X,DS-O,DS-3 terminated and dress
-Cable splicing
-Cable transfer
Installation of equipment relating to common systems operation specifically CLEC systems
1996-1998 Cable splice, CDI TELCOM
Contractor for US WEST in Salt Lake City,UT and Portland,OR Connect,Rearrange,Repair and maintain outside copper cable, new aerial,Buried and Underground, cable throws and closures, repair bad splice,removing bridge taps,
troubleshooting,deloading,cut over, rehap,B-BOX.I also worked with customer and small businesCable lacing (power and bundle)
-20 AWG thru 26 AWG as transmission
-RAMPER FOR DELTA SINCE JANUARY 18.1999-RETIRED.