Post Job Free
Sign in

Electrical Engineer Team Lead

Location:
Accra, Greater Accra, Ghana
Salary:
9,000
Posted:
May 22, 2025

Contact this candidate

Resume:

Emmanuel Justice

Botchway

Schneider Certified Engineer

(FSE) Expert in UPS Start-up

(Easy 3S, Easy 3M, Galaxy VS),

Electrical Systems, and Project

Execution Skilled in Quality

Assurance, Training, and Problem-

Solving with Strong

Communication and Innovation-

Driven Approach.

Personal details

Emmanuel Justice Botchway

************@*****.***

024-*******

P.I.C Borstal Box 129, Accra

July 31, 1989

Male

Ghanaian

Skills

teamwork

interpersonal skills

adaptability

strategic thinking

planning capabilities

Profile

A seasoned Electrical Engineer with extensive experience in multinational organizations, adept at handling tasks with minimal supervision in high-pressure environments. Possesses excellent teamwork, interpersonal skills, and adaptability. Quick to learn, receptive to feedback, and committed to meeting deadlines. Strategic thinker with strong planning capabilities. Education

BTech in Electrical Engineering (Power and

Automation)

2021 - 2023

Accra Technical University

HND in Electrical/Electronic Engineering 2017 - 2020 Accra Technical University

NVTI Certifications in Radio & TV Electronics

NVTI Written

2010 - 2011

NVTI Grade I Certificate 2009 - 2010

NVTI Grade II Certificate 2007 - 2008

Apprentice in Electronics (Radio & TV

Repairs)

2001 - 2006

Employment

Senior Electrical Engineer Aug 2014 - Present

Fairgreen Limited

Installation and maintenance of APC Hot Aisle Containment for Data Centers. Installation of Schneider UPS and Ortea AVR systems. Servicing and troubleshooting laptops and desktops. Preventive Maintenance Service on UPS, AVR, laptops and desktops for SSNIT, VRA, Judicial Service, Petroleum Commission, Tullow Oil and Absa Bank branches.

Installation and maintenance of Schneider In-Row precision, and Uniflair Med/Large Room Cooling units.

Transport Officer Jan 2014 - Aug 2014

Fairgreen Limited

Responsible for transporting Fairgreen staff and ensuring the timely and safe delivery of client items. Duties include coordinating transportation schedules Health Promotion Assistant Sep 2012 - Nov 2013

Maamobi General Hospital

Personal driver to the Late Mr. Osei Dickson (Senior Chief Officer, Ghana Prison Service). Sep 2012 - Nov 2013

Languages

English

Twi

Fanti

Hobbies

Playing Football

Cooking

Personal Driver Apr 2011 - Sep 2013

Late Mr. Osei Dickson

Personal driver to the Late Mr. Osei Dickson (Senior Chief Officer, Ghana Prison Service).

Achievements

Major Projects

Bank of Ghana (Head Office, Accra) – March 2024

Position: Team Lead

Installed and commissioned APC Schneider Galaxy VS 120kVA UPS and battery cabinets.

Bank of Ghana (Ahensian - Kumasi) – August 2024

Position: Team Lead

Installed Schneider Uniflair Air Cooled Chillers, Down Flow Units, Power Distribution Units, and Easy Cooling Units.

Ghana Interbank Payment and Settlement Systems Ltd (GHIPPS) – September 2023

Position: Team Lead

Installed APC Galaxy VS 80kVA UPS and battery cabinets. Implemented APC Hot Aisle Containment with In-Row Cooling Systems. Ghana Interbank Payment and Settlement Systems Ltd (GHIPPS) – September 2023

Position: Team Lead

Installed APC Galaxy VS 80kVA UPS and battery cabinets. Implemented APC Hot Aisle Containment with In-Row Cooling Systems. Union Systems Global Ghana Ltd (Accra) – July 2023 Position: Team Lead

Installed APC Schneider Easy 3S 30kVA UPS.

Implementation of APC Hot Aisle Containment with 7 Racks and 4 In-Row Cooling Units.

Installed APC Modular Rack Distribution Panels and Schneider Chiller Units. Ghana Bauxite Company Ltd (Accra) – July 2023

Position: Team Lead

Installed APC SMART-VT 20kVA UPS.

Installed Proton Energy Servo 75kVA AVR.

Kwame Nkrumah University of Science & Technology (KNUST) – December 2022

Position: Team Lead

Installed APC Schneider Easy 3S 80kVA UPS.

Implemented APC Hot Aisle Containment with 24 Racks and 8 In-Row Cooling Units.

Installed APC 277kW Power Distribution Units and Schneider Chiller Units. University of Cape Coast (UCC) – July 2022

Position: Team Lead

Installed APC Schneider Easy 3S 30kVA UPS.

Installed Ortea Orion 80kVA AVR.

ABSA Head Office (Accra) – November 2021

Position: Team Lead

Installed 2 Ortea Orion Automatic Voltage Regulators. Laying of AVR Input and Output Cables.

Electoral Commission (Accra New Office) – May 2020 Position: Team Lead

Installed APC SMART-VT UPS 20kVA.

Laying of UPS back-up load.

Gold Fields (Accra) – August 2019

Position: Team Lead

Installed APC SMART-VT UPS 20kVA.

Laying of UPS back-up load.

EcoBank Data Center (Ghana)

Position: Team Lead

Built APC Hot Eco Aisle Containment with 32 Racks and 16 In-Row Cooling Units Systems.

Tullow Oil Ghana (Takoradi) – September 2016

Position: Team Lead

Built APC Hot Eco Aisle Containment with 8 Racks and 2 In-Row Cooling Units Systems.

Installed 2 APC Galaxy5500 100kVA UPS.

Judicial Service Ghana (Accra) – April 2015

Position: Team Lead

Installed 2 APC Galaxy5500 UPS and 2 Ortea Digital Voltage Regulators. Built APC Hot Eco Aisle Containment with 8 Racks and 2 In-Row Cooling Units.

Installed biometric controllers and APC Chiller Units. Petroleum Commission (Accra) – June 2015

Position: Team Lead

Built APC Hot Eco Aisle Containment with 8 Racks and 2 In-Row Cooling Units.

Installed PTZ security cameras, 2 APC Galaxy5500 100kVA UPS, and Ortea 250kVA AVR.

Installation and configuration of APC Chillers.

Certificates

APC by Schneider Electric Certifications

CSP Training on Easy 3S, GVS, and 3M UPSs (Start-up) Schneider On2Power Training (Online)

Data Center Power Basics

Symmetra PX Family

Galaxy Line Overview

Cooling Market Landscape (Part I & II)

How Cooling Works

InRow Product Application Overview

Modular Power Distribution

Forecasting & Accommodating Data Center Growth

References

References available upon request.

March 5, 2025



Contact this candidate