Worked on Senior level of Management for 20 years and total 33 years’ experience in construction of road, Building & hotel projects in Tanzania Saudi Arabia and in India. Knowledge of Morth, ASSTO and BS code. Projects with respective cost. Resource development. time over runs and quality compliance to inshore satisfactory of projects. formulating operating budgets; managing overall operation for executing, construction projects with cost & time perimeter; participating in review meeting for evaluating projects progress. Handling commercial projects planning, contracts, billing, estimation, site coordination.
Worked History
1)Working with Makhan infra. Sub-contractor to GHV
2022 till date Airforce station Deesa Client MES.
Working as Sr. section engineer.
Airport work in Gujrat for their Road, cannel,
Runway and Building work.
2) 2018 to 2021. Indradip Infra ltd. (P.W.D) Road MDR (HAM). Flexible Working as Sr, Project manager for the project mention and responsible for timely completion,
Coordination with client, consultants and contractors, preparation bills, planning and monitoring and revise of TCS. Lessoning with required Authorities.
MDR project of 280km widening and reconstruction project (1136 CR. Project cost)
Pusad Gunj widening of 20km, SH 51, Simble pimple km31 SH 257,
Gunj Khadka reconstruction SH 265 km 9.5 this includes (19 HPC,4 box culverts, 2 MB)
Pusad Digress widening 26km SH 257. (12 HPC 3 MB) kolambi to Wadgaon km 11 SH 90A, Kapra phata to sakra phata (13 HPC 6 minor bridge’s) km 17 SH 316, Sakra phata to Pandrakawda 29km SH 267, (18 HPC, 4 BOX Culverts and 3 minor bridges)
Pandrakawda to zhari zamni km 26 SH 273 (57 HPC, 7 SLAB CULVERTS 8 MINOR BRIDGES)
3) 2016 to 2017 project cost 311 CR.
Satyasai baba infra- Client (MSRDC) NHI EPC MODE Road project 2-LINE
Rigid. Working as Sr. Project manager Competing project on time and taken COD Was responsible for coordination and planning Day to day activities monitoring coordinate Consultant’s, and Govt. offices for Liaoning Ahmedpur Ambejogai road 2-line concrete road
51km 3 major and 9 box culverts NH 548 D and Paithan to Pandarpur (shirurkasar to chubli phata 24km NH 752 110 HPC, 4MB, 13 BOX CULVERTS
4) 2011 to 2016 Tricone engineering (USA.)
Project in Saudi Arabia.
Working as Project manager for Road repair surface and drain in Makkah and Taif region, road surface removing and repairing up km 10 to km 45, repairs of culverts and Minor bridges. STAFF OF 29 SKILLED worker and 4 engineer.
School Building of education ministries Riyadh
School Building of 623 sq./mtr building cost 13 million Saudi Riyal
Precast material Building with RCC foundation, wall panels slab panels and precast Underground and overhead water tank, windows as per fix size, toilet bathrooms and staircases is also precast. our scope of work was foundation and assist at the time of assembling of precast material, Flooring and electrical work, gardening, and compound wall work.
5) 2009to 2011 DC construction PWD MDR road project Flexible
Working as project manager project cost 45 CR.
Daryapur to Akote road work 30km of SH 47 Akote to Jalgaon Jamud road of 26km.
The widening road with cement soil stabilization in the widening section of 10 meter.
Having crusher of capacity 100MT /PER HOUR HM plant 120 ton/hour the work with back filling of 600 mm, sub grade of 500mm GSB OF 250MM 125MM WMM. Cement treated base of 125mm DBM 70mm with 1 meter pawed and earthen shoulder of 2 meters.
6)2004 to 2008 working with ILFS
client NHI 9 Pune Sholapur Road km 22 to 62
project cost 890 CR.
Working as Sr. Engineer, planning and execution of project this include time le completion. coordination and resource management, supplying of crush material and murmur of site. Lab set up. Coordination with client and contractors for hindrance of project, lesioning with govt authorities, coordination with mechanical departments for speedy production.
7)2000 to 2004 k.k, construction for Valecha engineering client PWD
Widening of road from Sultanpur to Dusarbeed km 30 Flexible Road,
Widening of 3.5 meter to 7-meter flexible road. earthwork, GSB Grade 1 to 3 WMM and DBM
8)1991 to 2000 J.W. Ladwa (Tanzania) Client Ministry of work
Babati Singida road work of 86 km 144 Pipe culvert, two minor bridges, four major bridges
It’s a gravel road with new alignments and profile approved by Dorsch consultant’s project starting station was Singida town, and end was Babati, the backfilling, excavation levelling and coordination, using that time equipment’s like Eywa, Ivaco,Tata trucks, all Caterpillar equipment’s for excavation,grading,cutting. backfilling and levelling, good Ham company compactors.
9)1988 to 1991 K.K. Construction client irrigation Maharashtra
Irrigation cannel of Kukde project in Shrigondha at km 134,135, that time mostly excavation was done manually and blasting . irrigation work include slab culverts and equates,
Education Qualification
Central English night High school Ahmednagar 10th 1980
Diploma in civil. Purendar collage 1987
B.E. civil Purendar collage Pune 2009 external