Seeking challenging assignment with a
growing organization where I can devote
myself for long term and grow higher
within organization with my best
performances.
Team leader Hard working
Logical thinker Team management
Quick learner sharing feedback
coperative personality
*Univeersal MEP Project Engg. Ser.
Ltd.( VOLTAS Subdivision - A TATA
Enterprises
Inst. Engg.( N0v. 2024- till now)
Project- Rural Water Supply Project
Clint:- RURAL Water supply devlopment (Odisha)
*Rkg. Instrumentation Pvt.Ltd.
Site Engineer (Feb.2024-OCT.2024)
Project:-DCU Unit (HRRL) HPCL Rajasthan Refinary Ltd Client:-TATA Project Ltd.
* Olyan Descend (Saudi Arabia)
Inst. supervisior (Sep.2023-Feb.2024)
Project:-Yandu Renfinery TA Project 2023-24
Client:- Saudi Aramaco
*ISCCO Abu Dhabi
Inst. supervisor (Jan.2023-Mar.2023)
Project:-B2 TA project.
Client:- Abu Dhabi Polymercompany Ltd.
* ANI intergrated services(i) Pvt.Ltd.
Site Engineer (May2021-Oct.2022)
Project :-HGU, DHDT Unit (HRRL) HPCL Rajasthan Refinary Ltd. Pachpadra,Badmer.
client:- Toyo Eng. India Pvt. Ltd.
* Miraj instrumention services (i)Pvt.Ltd.
Inst.supervisor ( Jun.2018-Feb.2021)
Project :-G3OU Project Chambal fertilizers Gadepan Kota,raj. Client :- Toyo Eng. India Pvt. Ltd.
Mob.No. :-+917*********
Addr. :-7-E-52 Vigyan Nagar, kota, Raj.
Pin.-324005
E-mail :-************@*****.***
Passport no. :-V2405621
2015-2019 -Diploma
GovT.Poly..college,Kota( BTER))
[Branch-electronics & communication]
2013- BSER 10th (72%)
Work Experiences
Education
MAZHAR ALI
I NSTRUMENT ENGINEER
CARRIER OBJECTIVE
Personal Details
IInterpersonal skills
Key skill
Feild instrumention Site supervision
instrumentatiion erection
electricals control valves
installation cable laying
flow meter thermocouple
transmitter temperature Gauge
RTD PLC
Engineering layout drawings & Details:-
· Preparation of cable schedule & its layout.
· Preparation of cable tray, Lighting & MCT layout. Basic knowledge of computer
Language known :- English,Hindi
Birth Date:-28/12/1995
7 YEAR
PROFILE SUMMARY
[INSTRUMENTATION ENGINEER Total Exp: 6 Years ]
• Reviewing instrumentation scope of work, drawings and executing the construction and maintenance activities in line with the project specification and standards.
• Supervision of Installation, Termination & Testing of field instruments, conduits, cable trays and tubing for instruments.
• Responsible of full understanding of controls requiring general knowledge of low voltage
, 24 volt DC with knowledge of the control circuit from 4 to 20 mADC input/output/to/frominstrumentation equipment.
• Routine Calibration of Instruments (Calibration Shop / Field/ Online / Offline).
• Maintenance preventive / Repairs and calibration all field instrument .
• Loop checking, Trouble shooting, pre-commissioning, commissioning and maintenance activities.
• Erection, dismantling, calibration, installation of field instruments.
• Understanding & trouble shooting of P&ID and ILD diagram, Hookup diagram, Loop wiring Diagram Instrument specification sheets and, Jb details & cable layout .
• Associated with Loop Checking, Testing/Pre-commissioning activities of all types of instruments.
• Prepare request for inspection to client for inspections and acceptance of installations and Testing.
• Coordinate Quality procedures to construction department, Project management and client Inspectors and Corrective actions for client inspection comments/punch list.
• Responsible for clearing the Technical Query's with consulting client engineers and design department.
• Make Calibration for all type instruments by using HART COMMUNICATOR 375 & 475.
• Associated with checking of the following types of drawings, Hook-up drawings for field instruments, Instrument Location & Cable Routing diagram, Instrument Duct/Trench layouts, Cable Routing Lay00t, Cable Tray Layout, Control Room Layout and cable schedule.
• In current Project working as a INST. ENGINEER & looking after Overall Instrumentation Execution and O&M activities of Site.
i do here by confirm that the information stated above is correct to the best of my knowledge and i bear the resposibility for the correctness of the above mentioned particulars.
Date :- Name:- MAZHAR ALI