RESUME –Sr.Electrical Engineer (Oil and Gas projects-construction)

(Green and Brown field projects)

MRITUNJAY PAL

E–Mail ID: *************@**********.***

Mob No +974-********/919*********

Skype : Pal_mritunjay

Doha Qatar Po box -1744

PROFILE SUMMARY:

Highly resourceful and strategically inclined CONSTRUCTION ENGINEER with diverse credentials that combine solid 16 years experiences in industrial field including oil and gas industries and Power Generation. Possess great ability to work in a multidisciplinary team and be experienced in finding holistic building design solutions with a strong ability to communicate. Articulate communicator can fluently speak the language, blending technical expertise with interpersonal skills while interacting with the clients/teams and providing product/operational support.

OFFSHORE TRAINING COMPLETED IN UAE / QATAR (OPITO APPROVAL)

• Helicopter under escape (HUET)

• Sea survival

• TSBB

• Firefighting training completed

• Personal basket and swing rope training.

SAP System for Activity on Priority Basis P1-EMERGENCY, P2-HIGH, P3-MEDIUM, P4-SHUTDOWN WORK

SAFETY AWARENESS TRAINING

H2S, BA,

Qatar Gas Permit to Work / E PTW and Work management/Job Safety Analysis (JSA) system.

LOTO. (QATAR GAS OPRATING COMPANY LNG)

SIMOPS.

Hazardous Identification.

Health, Safety and Environment course.

Authorised Gas Tester

Confined Space Entry Training.

Fire and Safety watch training.

CAREER EXPERIENCE

•Qatar gas Operating Company Limited -Through (DOPET) (12thSeptember 2021 to 28 Mar 2024)

Construction Sup /Lighting Maintenance Supervisor At (BARZAN/RLTO/QG NORTH)

Responsibilities:

•Initially involved in execution works till handover the project and continued in maintenance.

•Monitoring of all kinds of Electrical activities as an EPC Contractor.

• Co-ordination with other discipline to making work front for executing the job by sub- contractor.

•Installation of Cathodic protection system for tanks and piping, concrete structures. (at Tank form area etc..).

•To ensure All Instrument installation as per Approved for Construction (IFC) project drawings,

• Continuity and loop checking of instrument after installation.

•Clear the punch list & proper hand over reports from projects.

•Troubleshooting in case of Breakdown / Major Fault in Electrical System & Fault Analysis.

•Hand on knowledge on soft starters, VFDs and electrical switch gear.

•Hand on Knowledge on LV/HV Electrical Power Distribution Systems.

•Operation and Maintenance of LT (3 phase, 440 volts) Motors.

•Proper Layout of Earthing, Lighting, Grounding of Electrical Energy System

•Knowledge of the requirements for Instrument installations within hazardous areas.

•Monitoring the cable pulling of 33 KV / 11KV / 6.6KV / LV etc.

• UPS, Battery Bank, marshalling panel, LV, MV, HV SWGRs wiring.

•PETROFAC EMIRATES LLC (Dec 2016 to 30th July 2019) –CONSTRUCTION ENGINEER -UZ750 Surface Facility Development Project on Artificial Islands

Responsibilities:

• Mechanical Completion Coordinator on Island in Abu Dhabi.

•Module / Area Handover coordinator.

•Telecom/Electrical Engineer for Construction works.

•Managing Subcontractor for Site related works and issuing Site Instructions where required.

•Managing Material resources.

•Coordination at site to resolve construction issues and provide feasible solutions to subcontractor.

•Issuing work permit to carry out works by subcontractor.

•Implementing the safety at site as per the rules and norms.

•Responding to the letters from subcontractor.

•Plant Cathodic protection system installation, Heat tracing for pipes, plant lights, Streetlights, High mast lights etc.

•PETROFAC EMIRATES LLC (September 2015 To 30th Oct 2016) –CONSTRUCTION ENGINEER -At Bomesc Offshore Engineering Co, Ltd –China Yard

Responsibilities:

•Monitoring Electrical/Telecom for Construction works for Module Substation construction.

•Planning & Estimation of materials, procurements, assessment of manpower, making shop drawings.

•Monitor competence of construction staff to meet the appropriate professional standards for the project.

•To co-ordinate the communication of Best Practices by active participations on reviews.

•Improvement on Electrical standards and guidelines.

•Promoting training of work force to share and transfer of knowledge and experience.

•Managing Subcontractor for Site related works and issuing Site Instructions where required.

•RELIANCE INDUSTRIES LIMITED (March 2013 to August 2015)

Responsibilities:

•Electrical Construction Engineer- Metallocene, EOEG-DBN

•Worked for various construction related electrical job as per international standards etc.

•Erection of power and distribution transformer up to 31.5 KVA etc.

•Erection 25 MVA, 2MVA, 6.6 of HT switch gear panel up to 6.6KV, HT & LT bus duct up to 3000A, PCC, MCC, PMCC Battery charger and control panels.

•Routing and laying of HT/LT cable including glanding, termination jointing of H.T cable and UT cable and fabrication, erection of cable tray.

•Installation and testing of earth pits and laying of earth strip for various electrical equipment, transformer an earthing HT panel / HT breaker.

•Ereaction, testing and commissioning of plant lighting system.

•Ereaction, testing and calibration of all type of instrument work FT, LT, MV, AFR, SOV.

•I had been entrusted with erection commissioning FHS system, S.S tube laying, instrument mounting panel fabrication, Erection, and commissioning

•Co-ordination with other department such as planning, quality, operation, and maintenance Q.M.D, Contract cell. Etc.

•Co-ordination to our Engg to preparation site work requesting (SWR) Bill of quantity (BOQ). As built drawing and material reconciliation.

•Planning and job following up day-to-day basis with field Engg.

•Toolbox talks among groups weekly.

•NATIONAL CONTRACTING COMPANY - CD (REZYAT GROUP)

Sr. Electrical Engineer (Oct 2010 to Oct 2012)

Plant: SEPCO III,660X2 MW STEAM TURBINE - RABECEL ELECTRICITY SAUDI ARABIA

Responsibilities:

•Plan for timely completion of completion of work as has been planned for the department.

•Planning the work efficiently, organizing plant facilities in order to meet agreed deadlines.

•Day to day management of the site, including supervising, monitoring the site glanding, termination & tray erection work force.

•Preparing reports as required.

•Resolving any unexpected technical difficulties and other problems that may arise.

•Assuring quality control, ES&H matters on site.

•Overseeing the selection and requisition of materials.

•RELIANCE INDUSTRY LIMITED (Nov 2007 to August 2010)

Electrical Construction Engineer

Plant: Jam Nagar export refinery (JERP) - 397 MW Substation AYZ 200–50 Construction (R.M.U.) Power

Responsibilities:

•Erection of HT switchgear panel up to 6.6 KV, H.T. & L.T Bus duct up to 3000 A, PCC, MCC, PMCC, Battery, Battery charger and control Panel.

•Routing and laying of HT/ LT cable including glanding, termination, testing and jointing as per Cable Schedule including fabrication and Erection of cable tray.

•Installation and testing of Earth pits and laying of Earth strips for various electrical equipment.

•Erection testing and commissioning of plant lighting system.

•RMU –, L&T, LUCY GAS, C/B RM6, ABB Oil, Schneider etc.

•Familiar in installation fault tracing and troubleshooting like CB Close / Open defect, CB Rack in / Rack out defect etc.

•Operating of testing equipment like MEGGER, EARTH TESTER, PHASE SEQUENCE TESTER, Contact resistance tester (Micro Ohm Meter).

•Work permit has been taking in parallel of shift Engineers for all kind of works.

•ADDITIONAL EXPERIENCE

•DODSAL PVT. LTD. - Rajasthan Atomic Power Project 5&6 KOTA SITE Engineer (August 2006 to Oct 2007)

•M/s. SHIV SHKTI ENTERPRISES - Karnataka Atomic Power Project 3 & 4 KAIGA Electrical & Instrument Engineer (2nd October 2005 to 28th July 2006)

•WALCHAND NAGAR INDUSTRIES LTD. - TARAPUR Atomic Power Project 3 & 4 Electrical Engineer (August 2004 to September 2005)

•EDUCATION & CREDENTIAL

Bachelor’s Degree in electrical Council of engineering and technology (India) in the year June 2017 with Second Class

Diploma in Electrical & Electronic Engineer from Department of Technical Education (Government of Karnataka) in the year November 2004 with Second Class

•Industrial Training Program TAPS (TARAPUR ATOMIC POWER PLANT)

•PERSONAL PROFILE

Name : Mritunjay Pal

Date of Birth : 28th March 1981.

Father’s Name : Shri Baliram Pal.

Sex : Male.

Nationality : Indian.

Marital Status : Married

Language Known : English, Hindi, Marathi, Bengali, & Kannada.

Passport No : N 0320260

Passport date : 09/06/2015 Date of Expiry 08/06/2025

Place :

Date :

(MRITUNJAY PAL)