Post Job Free
Sign in

Civil Engineer Project Management

Location:
Dubai, United Arab Emirates
Salary:
20000
Posted:
June 25, 2025

Contact this candidate

Resume:

ZAKIR HUSSAIN

Civil Engineer with over ** Years’ Experience in construction industry (Approved Engineer by Dubai municipality for Un-limit license both (Consultant & Contractor), Approved Engineer by Trakhess & Member of the UAE Engineering Syndicate.

Contact: 055-*******, ****************@*****.***, Profile:

A sincere, diligent & focused Civil Engineer, with an excellent and rewarding career of over 30 years, with noteworthy project management expertise and total commitment to achieve organizational objectives.

Core Competencies:

Project Management Technical Specifications Site Management Civil Construction

Statutory Compliance Relationship Management Civil Works Professional Experience: -

In Dubai – UAE

1. TIME PROPERTIES & HADI CONSULTING ENGINEERS

RE(Resident Engineer & Client Representative)

Reporting to; Managing Director

{From May 2023- Till now}

Cost control

Project Budget preparation and reporting to MD & CEO

Ensure prior to work commencing on site that every principal contractor is registered and in good standing

Liaison with Authority

Monitoring contractors work progress and productivity and arranging meeting to speed up work

Completed project

Residential Apartment Building TIME1 (TOWER)

2B+G+13FLOOR+ TERRACE (RESIDENTIAL BUILDING PLOT ON 648-8569 @ WADI AL SHAFA 5

,DUBAI,U.A.E)

286 Apartments (Studio-208, 1 Bedroom-52 and 3 Bedroom-26) Under construction Project

TIME -2 (Tower)

1B+ 3P+G+16FLOOR+ TERRACE (RESIDENTIAL BUILDING PLOT ON 648-8687 @ WADI AL SHAFA 5, DUBAI, U.A.E)

308 Apartments (Studio-71, 1 Bedroom-200 and 2 Bedroom-26 & 3Bed room 11 2. MZOON HOLDING

{From July 2020- May 2023}

Reporting to; PM & Managing Director

Civil Engineer (Client representative cum consultant)

Coordination with Client, Project Management team and other department. Monitor and control of all project costs

Monitor and control of all project costs.

Managed the general contractors and subcontractors with knowledge of construction trades.

Identified potential problems, took corrective action, and notified the proper level of authority

Finalization and negotiation with subcontractor.

Review and issuance of Daily/Weekly/Monthly Reports Residential cum commercial Building at Al Majan Area -Dubai Client : M/S Harib

Contract Value : 60Million

Duration Period : 360 days.

Farmhouse Phase II interior and Exterior modification Client : M/S Muzoon Properties

Contract Value : 40 Million

Duration Period : 360 days

2.AROMA INTERNATIONAL BUILDING CONTRACTING (L.L.C)

{From October 2018- Till now}

P Reporting to : Managing Director

QA/QC Manager –Present responsibilities

1Implement Quality Control plans & procedures

Develop and maintain the quality standards for the onsite construction works.

Review Suppliers / Subcontractors Pre-qualification Documents, Method Statements, ITP’S with checklists, Material Submittals and test reports to ensure compliance with contract requirements as delegated by PQM.

Monitor subcontractor’s systems implementation and follow to ensure that all required submittals made in timely manner. Identify, analyze, and resolve issues related to the Quality Assurance and Quality Control

Online submission of all DM applications and process such as Demarcation, coordinates, site fence, plot occupancy etc, down loading revised drawing permits and other all related documents from DM portal - Trained Engineer by DM BCS (Building Control System)

Effectively monitor and control project progress and efficient resource utilization.

Analyze and share lessons learned throughout the project.

Preparing and Review and issuance of Daily/Weekly/Monthly Reports 3* Hotel for Pavilion Hotel Management at Al Jaddaf Water front area -Dubai Client : M/S Fahad AbdulRahaman Abdul Aziz Thunayan Contract Value : 30 Million

Duration Period : 300 days.

G+2P+14Typ+Roof on Plot 326-5591 at Al Jadaf, Dubai Client : M/S (DEJEM) Ayedh Dajem Real Estate Development Contract Value : 100 Million

Duration Period : 360 days

2-SHAPOORJI PALLONJI MIDEAST L.L.C

{From January 2014- October 2018}

Reporting to : Project Direct

QA/QC Manager - Present responsibilities

Implement Quality Control plans & procedures

Develop and maintain the quality standards for the onsite construction works.

Review Suppliers / Subcontractors Pre-qualification Documents, Method Statements, ITP’S with checklists, Material Submittals and test reports to ensure compliance with contract requirements as delegated by PQM.

Monitor subcontractor’s systems implementation and follow to ensure that all required submittals made in timely manner.

Identify, analyze, and resolve issues related to the Quality Assurance and Quality Control.

Planning and coordinating QA/QC activities, ensuring Quality Control of the work according to contractual requirements. Identifying and reporting field discrepancies and non-conformances.

Co-ordination of field inspection activities with Consultant engineers.

Preparation of Inspection test plan and controlling the site inspection as per ITP.

Review of method statements as per consultant requirement for all site activities and maintaining all records for the same.

Coordination with construction team to prepare field change request and RFI to confirm the acceptance

/approval of design changes.

Coordination of subcontractors and engineering department to prepare as built drawings as per site condition.

Coordination with the site team to close out of NCR’s and Site Memos.

Preparing list of materials and relevant testing covering, type of material, type of test, frequency and acceptance criteria based on project specification and standards.

Coordinating with site team to close out of Snags and preparation of Handing over documents.

Conducting weekly meeting with construction team and QA/QC Engineers /Inspectors to verify and resolve the quality issues at site.

Preparing observation report for site activities related to the subcontractors and execution team ensure the quality of work.

Coordination to perform Second party audit of subcontractors Quality System.

Review project Quality plan, Health and Safety plan and related risk assessments, Ensure project quality objectives are attained and that activities are under in a safer manner in accordance with local Authorities regulation, project requirements and company HSE Policy

Follow-up on the submittals of drawing, and approval (Planed Vs Actual)

Ensure that all works executed as per conformance with approved QAQC guidelines to achieve highest quality and excellence standard in the delivery of project.

Down load revised drawing permits and other all related documents from DM portal -Trained Engineer by DM BCS (Building Control System).

Liaison and coordinate with DM structural Engineers & inspectors to secure structural approval and to secure avoiding and minimize violations and fines.

Tool box training to workers, execution team, and supplier, contractor awareness of understanding the importance of time, Quality and cost to Success full completion of project without any defect within the approved duration time without any delays and to customer satisfaction.

Monitoring Quality control, ensure on going site construction activities with the approved PQP and IMS procedure.

Daily site walk awareness of understanding as a lesson learn for good and bad practice work to avoid defects

, repair and rework and rework

Liaison and coordinate with client, consultant & subcontractor supplier submittals with all discipline

Tool box training to worker and site execution team, supplier and subcontractor’s awareness and understanding that the local authorities DM, DCLetc. Rule and regulation, professional practice and procedure to avoid any violations and fines, which is outside the budget.

Tool box talk and training to worker, execution team, supplier, subcontractor to avoid rework and cost of repairing work.

4 * Hotel, Commercial & Residential Structures:-AlMaktoum Hospital Redevelopment PhaseII

- 2B+G+14 Four Star Hotel Building at Naif,Deira - Dubai.

- 2B+G+12 Residential Apartment Building at Naif,Deira - Dubai.

- 2B+G+8 Residential Apartment & Commercial Retail shop at Naif,Deira - Dubai. Client : M/S Al Wasl Asset Management

Consultant : M/S Kling Consult.

Contract Value : 560Million.

Duration Period : 690 days.

3. (ARC) INTERNATIONAL ARCHITECTS & ENGINEERS.:

{From June 2006 and until January 2014}

Civil Engineer - Approved by Dubai municipality.- General Projects Department Dubai Municipality

Fully responsible to ensure the jobs are completed within contractor duration & and as per Specification requirement. Formulate quality procedure to monitor progress, quality control, testing of material, conducting progress meeting with subcontractor, supplier and attending client progress and technical meeting.

Shall ensure that the company policies and PQP, quality procedures, statutory regulations and project specifications are compiled.

Monitor Main & subcontractor’s systems implementation and follow to ensure that all required submittals made in timely manner. Identify, analyze, and resolve issues related to the Quality Assurance and Quality Control.

Tool box training to Contractor & Subcontract, execution team, supplier, contractor awareness of understanding the importance of time, Quality and cost to Success full completion of project without any defect within the approved duration without any delays and to customer satisfaction Olympic Swimming pool Stadium, Dubai - {From April 2010 -2012}. Project : PJ-4096 Dubai Sport Complex.

Consultant : Arup International.

Con tractor : M/s. Binladin Contracting Group LLC. Contract : 1 Billion Dhs.

Period : 720 days.

Palace for H.H. the Chairman of, Dubai Municipality - {From March 2009 and up till March 2010l}. Project : PJ-1160

Consultant : Al-Shadeed Engineering Consultant

Con tractor : M/S.Binladin Contracting Group. LLC. Contract : I Billion Dhs.

Period : 720 days.

New Central Laboratories Building and ITD Building at DCL, Dubai {From September 2007 and up till May2008}.

Area of project : (3800 square meter).

Project : PJ-2226

Consultant : ARC International.

Contractor : Bhatia General Contracting

Contract Value : 76,501,523.65 Dhs.

Duration Time : 450 days.

Multi Story Car Park at Al Sabkha, Dubai.{From June 2006 and up till September 2007}. Area of project : (3700 square meter).

Project : PJ-8814

Consultant : ARC International.

Contractor : Al Malik Building Contracting Co.

Contract Value : 33,963,180. Dhs

Duration Ti : 364 days

4..Arief & Bintoak Engineering Consultant, Dubai.

{From May 2002 and until May 2006}- As a “Civil Inspector”

Inspection of Structural (Concrete, Timber and Steel Structure), Aluminum & Glazing, Finishes and Other Civil Works. Material submittals review, leveling, site instruction, snag list, testing of materials, witnessing all concrete pour, commissioning of work, monthly progress reports, method statement review, bill verification, quality assurance, site safety, welding/surface check for Steel works, Load test for Pre-cast concrete & Pile foundations, Fresh concrete filed testing and witnessing & material inspection and witnessing.

Planning and coordinating Contractor QA/QC activities, ensuring Quality Control of the work according to contractual requirements. Identifying and reporting field discrepancies and non-conformances

Monitor Main & subcontractor’s systems implementation and follow to ensure that all required submittals made in timely manner.

Identify, analyze, and resolve issues with Contractor related to the Quality Assurance and Quality Control.

Review and issuance of Daily/Weekly/Monthly Reports Residential Structures:-

B+G+9 Storied Residential Building at Mankhool, Bur- Dubai. Area of project : (5400 square meter).

Contractor : Buset Gnereal Contracting Co.

Contract Value : 60,000,000.00.

Duration Time : 360 days.

G+5 Storied Residential Building at Karama, Bur-Dubai. Area of project : (3000 square meter).

Contract Value : 30,000,000.00.

Duration Time : 360 days

Commercial Structures: -Trucks/Buses workshop cum office Building for Gargash Enterprises (Mercedes Benz) Area of project : (6000 square meter).

Contractor : Rigid Construction Group L.L.C

Contract Value : 20,000,000.00.

Duration Time : 360 days

Authority Structures:-

Police Barracks facilities at Rashidiya for Dubai Police Force, Dhabi – UAE Area of project : (5500 square meter).

Contractor : Ranya Construction Group L.L.C

Contract : 40,000,000.00.

5- Al Karnak Engineering Consultant, Sharjah

{From Feb 1999 and until May 2002}.

As a “Civil Inspector”

Various Residential Building, villas at Sharjah Involved in quality assurance giving site instruction, Daily report, material submittal, shop drawing review, Find discrepancy in the drawing and Assisting to Residence Engineer. 8- M/S M.K.M.S Construction Pvt. Limited, India

{From Feb 1995 and until Feb 1999}.

As a “Site Engineer”,

Planning, Scheduling, Tendering, Materials Purchase, Labor Management, Co-ordination with Consultants, Client, & Sub-Contractors. Labor Payment, General Supervision of works. Involved in the execution of various types of Commercial and Residential buildings at Madras.

Education Credentials -

Bachelor of Civil Engineering – 1995 (Madurai Kamarajar University Faculty of Engineering Name : - Zakir Hussain

E-Mail address : - Zakirhussain ****@*****.***

Date of birth : - 21 / 06 / 1972, in Chennai– India. Status : - Married & have three children.



Contact this candidate