Post Job Free
Sign in

Process Engineer Saudi Arabia

Location:
Calgary, AB, Canada
Posted:
May 05, 2025

Contact this candidate

Resume:

ilhee Jang

**** ** ****** ** *******, Alberta, Canada, T2T 5B9

Cell Phone: 403-***-****, E-mail: *********@*****.***

OBJECTIVE: Process Engineer

HIGHLIGHTS OF QUALIFICATIONS & SKILLS

•Performed Process simulation for facilities and developed PFD, DPDT, Heat & Material Balances, UFD & P&ID

•Participated hands-on in designing SAGD, Gas/Refinery, Petrochemical (Olefin) facilities, Aromatics (BTX Plant), Wastewater treatment/Sewage System, Gas/Oil Pipelines, Compressor Stations, CO2 Flooding, Olefin, LNG, Well Pads, HDPE and PP Facilities in Canada, USA, Saudi Arabia, India, Thailand, Singapore, Iran, and South Korea.

•Prepared datasheets for equipment such as vessels, columns, heat exchangers, pumps, compressors, storages tanks and instruments for facilities and pipelines

•Performed the feasibility study for flare system and checked facilities performances.

•Performed Transient Analysis for liquid/gas pipelines using Synergi Pipeline Simulator, AFT Simulators.

•Very good at simulating facilities/pipelines utilizing Pipeline Transient Analysis (Synergi Pipeline Simulator and AFT Simulator), and Hysys, VMG, Promax Simulators

•Effective team member who is comfortable with leading or collaborating.

•Participated in and prepared for HAZOP, ORA (Operational Requirement Analysis), OPPSD (Overpressure Protection by System Design) for facilities.

•Developed and executed initial plant start-up sequence diagram for converging all department on the priority work and complete project on time.

•P. Eng for Alberta & British Columbia Provinces.

WORK EXPERIENCE:

2024.05 – Present Bluestar Engineering, Calgary, Canada.

Senior Process Engineer

Projects involved:

North River Train 1, 2 & 3 Revamping (Compressor section, Refrigeration, Amine and TEG Unit, Gas Turbine for Power Generation)

CNRL SCOBE Gas Plant Project and CNRL FARRELL Gas Plant Project (Compressor section, Refrigeration, Amine and TEG Unit)

2023.07 – 2024,04 EPFC Corp, Calgary, Canada.

Senior Process Engineer

Projects involved:

ConocoPhillips Montney Development Phase II project (Sales Gas, CRU (Condensate Recovery Unit).

2023.02 – 2023, 06 Vista Projects, Calgary, Canada.

Senior Process Engineer

Projects involved:

Cenovus Foster Creek Sour Gas Treatment Project (Treating, Amine, SRU and Utilities)

2022.07 – 2023, 01 KBR AMCDE Engineering, Al-Khobar, Saudi Arabia.

Senior Process Engineer

Projects involved:

•Saudi Aramco Fadhili Gas Plant Expansion Project (2.5 BCFD)

2019.08 – 2022, 06 Lauren Services, MGMS Groups, Calgary, Canada.

Senior Process Engineer

Projects involved:

Pembina Facilities Modification Projects

CNRL Albian Sand Utilities Revamping Projects

2010.09 – 2019, 07 Stantec Consulting Ltd, Calgary, Canada.

Senior Process Engineer

Projects involved:

•Suncor Canada – 1. NCG-Steam Co-Injection to Well Pads Projects 2. Aqueous Ammonia–Steam Co-Injection to Well Pads 3. CO2–Steam Co-Injection to Well Pads Project 4. ORF and SNCG-Steam Co-Injection

•Husky Canada – 1. SGS Pipeline Pump Station Project 2. PMA Project 3. Minehead and Galloway Plant VRUs Studies Project 4. LACT Units Design Project 5. Tide Lake Battery Project 6. Ansell Gas Plant Revamping Project

•Cenovus Canada – 1. Narrow Lake Offsite Pipeline Project, 2. Pelican Well Pad 3 Project

•CNRL Canada – 1. Slop Oil Treatment by Centrifuge Project 2. Gas Plant Revamping Project 3. Desand Unit Replacement Project.

•Pengrowth Canada – 1. Compressor Station Expansion Project, 2. Pipeline (60 km) Construction Project,

•Keyera Canada – 1. Acid Gas Injection Pipeline Project,

•PNG Canada – 1. Kitimat Pipeline Expansion FEED Project,

•Alberta Canada – 1. Diluent Terminal Project,

•ConocoPhillips Canada – 1. Surmont 2 SAGD Project.

2007, 08 – 2010, 07 Kellogg, Brown & Root, Houston, USA & Saudi Arabia.

Senior Process Engineer / Start-up Engineer (2009, 3 – 2010, 7) at Houston in Texas and Al Jubail in Saudi Arabia

Projects involved:

•Saudi Kayan Olefin Project. (2009, 03 – 2010, 07), Saudi Kayan Petrochemical Co, Ltd (1350,000 MTA ethylene plant).

Technical Professional Process Lead (2007, 08 – 2009.02) at Houston in USA

Projects involved:

•Ras Tanura Integrated Project. (2008, 10 – 2009, 02), Saudi Aramco & Dow Chemical

•Yanbu Export Refinery Project. (2007, 08 – 2008, 09), Saudi Aramco & ConocoPhillips

2005, 08 – 2007, 07 Hatch Energy., Calgary, Canada

Senior Process Engineer

Projects involved:

•N-Solv Project, Petro-Canada, Calgary, Canada. (2007, 02 – 2007, 08),

•Weyburn CO2 Recycle Compressor Expansion Project, Encana. (2006, 06 – 2007, 01)

•SCOP HAMRIN Oil Field Development Project, Kirkuk IRAQ. (2005, 08 – 2006, 05)

2005, 03 – 2005, 07 IMV Projects Engineering Co., Calgary, Canada

Process Specialist

Projects involved:

•Blackrock Orion SAGD Heavy Oil Projects, Blackrock Adventure co.

2003, 09 - 2005, 02 Fluor Canada Ltd., Calgary, Canada

Process Specialist

Projects involved:

•Ultra Low Sulfur Diesel Upgrade Project, Shell Canada

2003, 01 – 2003, 08 Shell Canada Limited., Calgary, Canada

Process & Safeguarding Specialist

1993, 04 – 2002, 03 Daelim Industrial Co. Ltd., Seoul, Korea

Projects involved (all Turnkey Projects):

•1,000 MMSCFD Southpars Gas Development Phase-1 Project (Iran)

•250,000 MTA HDPE Haldia Petrochemical EPC Project (India), (1999, 01 – 2002, 01)

•2,000 MMSCFD Petronas Gas Processing EPC Project (Malaysia)

•200,000 MTA LDPE Phillips Plant EPC Project (Singapore), (1995, 05-1996, 08)

•350,000 MTA Ethylene Thai Olefin Plant EPC Project (Thailand), (1993, 03 –1995, 04)

1986, 01 – 1993, 03 YNCC Co. Ltd in Korea

Process/Operation Engineer:

•Operated Naphtha Cracking Olefin Plants

EDUCATION

•B. Sc., in Chemical Engineering, 1986, Chung-Ang University, Seoul, Korea



Contact this candidate