Post Job Free
Sign in

Civil Engineer Project Management

Location:
Doha, Qatar
Posted:
April 29, 2025

Contact this candidate

Resume:

ARISTON ROXAS DACAYO

Address: New Slata, Doha Qatar

Mobile No.: +974********

Email Address: *************@*****.***

Visa Status: Transferrable Visa

Academic Qualification: Bachelor’s Degree

With QID

PROFESSIONAL BACKGROUND:

Position: Mobility Marshall

Elegancia Resources

Doha Qatar

Project: FIFA World Cup Nov – Dec 2022

Directing spectators to their designated gates for easy access going to main Entrance of the Stadium.

Ensuring the smooth flow of spectator’s path in and out of the stadium.

Maintaining the crowd control protocol to avoid stampede.

Provide adequate and precise information about traffic bearing area PROFESSIONAL BACKGROUND:

Position: QC Inspector

REDCO International

Doha Qatar

Project: Barwa Integrated Family housing Jan 19, 2021 – Nov. 30 2021

Initiate Internal Work Inspection Request (WIR) prior to invite Consultant for checking and approval.

Coordinate with the Erection Team to resolve Quality issues.

Ensures that work is carried out and executed are as per approved drawings, specifications and material submittal sheets.

Receiving and Checking Work Inspection Request to confirm attachments are as per the approved

Carrying out final Inspection with the consultant for closure of Work Inspection Request raised by site construction team.

Ensuring the proper description of all submitted WIR for verification of quality documentation prior to execute the Inspection in every discipline.

Carrying out Internal Repair works Inspection with the main contractor QC Engineer for handing over the finished architectural works.

Position: Civil Engineer Sept 28, 2019 to May 31, 2020 KEMCO Edge facility Management

Doha, Qatar

Project: 44 West Bay Tower (Rectification Works for QCD approval)

Prepares Permit to Work (PTW) to be issued for Sub-Contractors prior to the commencement of works to be Carried out;

Ensuring the availability of resources required to do the work.

Review and provide Comments on Method statement and ITPs submitted by Sub-Contractor prior submission to Project Management Team.

Ensuring the effective Implementation of this procedure

Initiating IRs for Civil, Architectural & Structural works that has been carried out

Following up the Project Management team (Consultant) on Site observations till Final closing.

Receiving and Checking Material delivery on site to confirm as approved brands and supplier by the consultant.

Supervise daily work activities which has been carried out by sub-contractors if conforms as per the approved shop drawing.

Manage Project Quality Plan and Documentation that conforms Qatar Construction Specification.

Manning the closure of NCR that the Consultant address to the identified violation during execution of the works.

Position: QC Inspector March 23, 2018 to May 5, 2018 CCC

Doha, Qatar

Project: Building B014 Administration & ICC-Metro Depot 1 (FT.RSD)

Carrying out the IR’s, testing and preparing the verification (Inspection forms) documentation according to the latest approved QCPs and ITPs

Collecting Main Contractor signature on inspection and test documents;

Submission of completed documents to the discipline QC Engineer;

Participating in the scheduled Site Quality Walkthroughs;

Reporting Site Observations to the discipline QC Engineer ; and

Verifying the effective Implementation of correction, corrective / preventive actions to address identified QC issues.

Position: QC Engineer (Material Receiving Inspector) Feb 23, 2014 to May 30, 2016 Saudi Oger Ltd.

Dhahran, KSA

Project: Saudi Aramco - King Abdul Aziz Center for World Culture (17 floors Bldg. +2Basement)

Ensuring that the QCPs and ITPs are available prior to start of work as per the project Quality deliverables schedule.

Verifies, review all quality documents and Test reports pertaining to quality requirement stipulated in the Project Specification & Project Quality Plan. ARISTON ROXAS DACAYO

Conduct pre-inspection / Inspection of Material receiving inspection(MRI) for structural works of reinforce concrete & structural steel, Architectural & civil works

Ensure all shop/detailed drawings are approved & with compliance on Quality standard requirements of Saudi Aramco.

Initiate RFI for Material receiving Inspection (MRI) on the Saudi Aramco Quality Management Inspection System (QMIS) for Final approval of the Project Inspection Division.

Ensure all Materials Delivered meets the Quality requirements and conforms with ASTM

Raised Internal NNC, Standard violations and pro-active notification

Performs quality check and evaluate all incoming materials delivered by sub-contractor that will be used in construction.

Coordinate with the Saudi Aramco Project Management Team to resolve Quality issues. Position: QA/QC Engineer April 24, 2012 to February 22, 2014 Saudi Oger Ltd., Riyadh, Kingdom of Saudi Arabia

Project: KAP 1- King Abdullah Bin Abdul Aziz Development of Security Centers (Prototype Security Center Buildings)

Reporting to senior Qc Engineer if No QC supervisor of his trade assigned in site.

Coordinates with Qc Site Manager Frequently.

Verifies methods for testing, Instrument calibration and evaluation for performing designated inspection and testing.

Ensures that the QC documents/record like drawing, report, submittals are kept in order and made readily accessible. QMS related documents such as forms and procedures are kept updated and available.

Maintains communication with the Site Project Manager, Pilot, sub-contractor and consultant in order to ensure adequate process capability and information feedback.

Coordinates /deals directly to site management and sub-contractor to identify deficiencies.

Ensures that work is carried out and executed as per drawings, specifications and material submittal sheet.

Establishes liaison with the consultant’s representative on quality related matters and make available upon request, copies of documentation and tests performed.

Issues non-conformance report that does comply with contract document. Report any work disagreement his immediate service manager.

Ensures that all materials and equipment installed on site or fabricated off-site conforms to the contract documents or MSS.

Review test procedures, coordinates and agree with the consultant on test date.

Assumes the logging of non-conforming works and the corrective action procedure and report on such concerned Site Manager.

Ensures that all openings related to his service, above false ceilings are properly sealed and fire zoning is not infringe

Ensures that the newly revised documents carry the latest revision number, date, status and that all superseded documents are kept separately for future reference.

Ensures that as- built information is recorded daily on QC copy of the drawing. Follows up on Reserve List MO) with the SM, Sub-contractor and the FMD Facilities and Management Department Division and ensures lifting valid points,

Attends projects hands- over to the client representative and/or FMD division.

Prepares Monthly report and discuss pending issues to supervisor. ARISTON ROXAS DACAYO

Position: Civil QA/QC Engineer March 23, 2009 to April 23, 2012 Saudi Oger Ltd., Riyadh Kingdom of Saudi Arabia

Project: King Abdullah Financial District (18 floors + 4 basement Luxury Hotel Bldg.)

Ensuring all necessary resources needed for carrying out QC is available at site.

Initiate Internal Inspection prior to raise IR for Civil, Architectural and structural work.

Ensuring the quality plan, projects procedures and contractual technical specification are being implemented through testing procedures according to standard codes and client requirements.

Ensuring that all measuring and test equipment at site are calibrated in good working condition and calibrated certificate are maintained.

Ensuring that any confirmed non-conforming works are clearly identified reported and done according to the approved NCR procedures.

Check all materials and equipment delivered at site in compliance with approved submittals and project specification.

Implementation of the Quality policies defined in this procedure and for ensuring that the requirements of the ISO 9001 standard are implemented and maintained

Prepare Inspection Test Plan QA/QC procedure standard and QA/QC Forms applicable to the requirement of the project.

Position: Civil Engineer Nov. 28 – Mar. 2, 2009

RBA Associate Consultancy

154 Sikatuna Village, Quezon City

Project: Two Storey Residential Unit

To execute the task delegate in a manner that complies with the objective and strategies of civil work department. To initiate and complete any action to fulfill the above responsibilities in charge in the implementation of earthworks civil work and pipe laying.

To see to it that workmanship and materials shall comply with the approved drawing and technical Specification.

Prepare schedule for the requirement of the materials and equipment needed in the implementation.

Make Quality in the field prior to request for inspection to the consultant ensure all work is carried out in safe manned in compliance with project safety manual. Position: Site Engineer May 28 – June 20, 2008

Mark Steel Construction Corp., GMA Cavite, Philippines Project: Eagle Cement Cooler Clinker

Responsible in furnishing daily activity, weekly and monthly Progress report

Manning the preparation of acquiring different working permits

Supervised workers in their daily activities such as the fabrication of footing Frame and other related task.

Estimates volume of concrete poured in lean concreting of footing foundation.

To execute the task and complete any actions to fulfill the duties and responsibilities. ARISTON ROXAS DACAYO

Scheduling of work manpower loading and scheduling of equipment ensure all work is carried out in a safe manner in accordance with the Philippine Standard. Sub-Contract Work Sept 2002 - April 2007

San Marcelino Zambales, Philippines

Civil works

Labor Excavation

Carpentry

Masonry

Painting

Grill work

Haulage

Position: Field Engineer May 2001 – June 2002

MANCON-CBDC

Makati City

Responsible in establishing point for the new sequence of daily activities.

Supervise workers in daily activities for the early accomplishment.

Responsible for the implementation of the plan base on given specification. SUB-CONTRACT WORK March 1999 - January 2001

Subic Zambales

Civil Works

Labor Excavation

Masonry

Plumbing

Electrical

Floor sanding

Position Held: Site Engineer January 1997 – December 1998 VIVO CONSTRUCTION CORPORATION

San Marcelino, Zambales

Project: Low Cost Housing Units

Responsible for the construction of all the structures base on given plan.

Supervise roofing, steel work and roofing sheet installation.

Prepare working schedule to finish the project ahead of time.

Execute daily construction activities as per the approved Drawings and supervise earthworks and other related tasks.

EDUCATIONAL ATTAINMENT:

Bachelor of Science in Civil Engineering

FEATI UNIVERSITY

ARISTON ROXAS DACAYO

Sta. Cruz, Manila

1991 - 1996

SEMINARS AND TRAINING ATTENDED

Time Management-Get 0rganized f0r Peak Perf0rmance 16 February, 2015 (Saudi Oger Ltd.)

Effective Planning and Scheduling,

17 February, 2015 (Saudi Oger Ltd.)

Leadership Skills-C0mmunicati0n c0aching and c0nflicts, 18 February, 2015 (Saudi Oger Ltd., Easter Regi0n)

Building Better Team,

19 February 2015 (Saudi Oger Ltd., Easter Regi0n)

On Job Training ( Freyssinet Philippines), 1994

Training on Auto cad (Crescent Technology Institute), 2005 AFFILIATION

SAUDI COUNCIL OF ENGINEERS

ARISTON ROXAS DACAYO



Contact this candidate