FamilyName:
Mohammed
GivenName(s):
MohammedTajuddin
YearofBirth:
01.04.1976
Nationality:
Indian
Profession:
CivilEngineer
Language(s):
English
Educational Background
Diplom in Civil Engineering Diploma
ComputerSkills
MSOffice
ProfessionalExperience: ISOCERTIFIED9001:2015(QMS-LeadAuditor).
WORKINGEXPERIENCEWITHSAUDIARAMCO PROJECTSK.S.A.:QMSLeadAuditorISO- 9001:2015CERTIFIED.
SAPNo.70013708AramcoBadgeI.DNO.7079915
•Excavationandbackfillingcompactionandfielddensitytest(SAES-A-114)
•Rebarandformworkwithembeddeditems(SAES-Q-001)
•Concretepouringactivities(pre-casUcast-insitu),(09-SAMSS-097/SAES-Q-001)
•Surveyingandlevellingforpads/structuresandfoundationwork,(SAES-Q-005/A-114)start something otherthanitaly
•Erectionofsteelstructuresforbuildingspiperackandpipesupports(12-SAMSS-007/008)
•Elevationofvertically,horizontalityerectionofsteel(Columns,Rafter,Purlins,Beamsand Ridges)(12-SAMSS-007)
•Anchorbolttighteningandrespectivemethodstatements.(AISC)
•Asphaltconcreteworksactivities(SAES-Q-006),(PrimeCoaUBindercourse/Tackcoat/wearing course)
•Groutingforstructuresbareplates/anchorboltmanholesandmetering,skids(SAES-Q-010,Q-011)
•Bitmasticcoatingforconcretestructures/moistures(SAES-H-003)
•Internalauditsoftheprojects(Scheduled-Q)
•Epoxycoatingofrebarandpouringwalls&doorsforbuildings(SAES-Q-001-APCS,ASTM-DTTS)
•Punchlistworkitemsandasbuiltdrawings(Schedules-Q)
•QA/QC-documentationworkoncompletionofProjects(Schedules-Q)
WORKEXPERIENCE
Company Sendan International Co.Position QaQCCivilInspectorDuration :Jan2023toJune2024.
Project SeAHGulfSpecialSteelIndustries.
CONTRACT.No.
Company
SGSI/EPC/0001.ARAMCOI.D.No.C-7079915SAPNo.70013708.
SAUDIARCHIRADONCO.LTD
Position QaQCCivilSupervisor Duration :Oct2018toMar2019.
ProjectCONTRACT.No.
Company
KING SALMAN INTERNATIONALCOMPLEX(MARITIME INDUSTRIES. 660*******(IK). ARAMCO I.D. No.C-7079915SAPNo.70013708.
ApplusVelsosiSaudiArabiaLtd.
Position :QaQCCivilSupervisor
Duration :July2013toJune2018.
Project :JZR&TPEPC-9CrudePackage.AndSafniaGasPlant-(Tanajib)./
Project :SADARASDLBuildingsPM&C/Project/ARAMCOMarineOffshore-(Tanajib)
Responsibility
•InspectionofPileFoundationforHpFaireArea,AcidAreaandStructuralFoundation
•InstallationintothetrenchBoringwithCIPMETHOD,centrelinealignmentandsettlement.
•Steel ReinforcementCirculerColumnsfoundationsand rebarsinspectionstorage and prior toSurging andmeasurementsatimes recoredeachsteps.
•ConcretecastinPlacePileFoundationdia600MM.
•LoadtestAreaTestandCompressiveTestandremovingtimetotimecasingPilerecords.
•Inspectionof Foundationfor Solar power for StructuralFoundationInstallation into the trench centerlinealightnment and settlement.
•AnchorBlockFoundationPouringInspection.
•ManifoldBlockpouringinspectionandothersizeofpipeinchesinstallationinspection.
•Pipesupportfoundation/Sleeperfoundationandblockwallfoundationinspection.
•Concrete pouringinspection undergroundsolar structural Foundationfor installation of Solar Cell for sun shine restore capacity unit-foundation
•Checkingofexistingswaleprotectionmaterialinstallationandexpansionwallconstruction
JobResponsibilities:
•InspectionofFoundationforBollard Structural FoundationInstallationinto the trench centrelinealignment and settlement.
•InspectionofSecuritygateHouseBuildingFoundationtoRoofwork.
•InspectionofSecurityEquipmentX-RayFoundationtoTopofTheBuildingwork.
•InteriorArchitecturalwork design Inspection and metal Stud Floor tilesInspectionand RoofParapetwaterproofingWork.
•AsphaltPaving insideGate to the Building Area up to BollardSupportand FromX-ray buildingtoPavingofConcretework tilltoBollardSupports.
•DocumentationWorkForallChecklistRFl'STillToPunchlistItemWork.
•Inspectionof Foundationfor Solar power for StructuralFoundationInstallation into the trench centerlinealightnment and settlement.
•AnchorBlockFoundationPouringInspection.
•ManifoldBlockpouringinspectionandothersizeofpipeinchesinstallationinspection.
•Pipesupportfoundation/Sleeperfoundationandblockwallfoundationinspection.
•Concrete pouringinspection undergroundsolar structural Foundationfor installation of Solar Cell for sun shine restore capacity unit-foundation
•Checkingofexistingswaleprotectionmaterialinstallationandexpansionwallconstruction
•Inspectionofbackfillingmaterialsisapproved.
COMPANY :UNISISENGINEERING
POSITION :CivilQCSupervisor
Duration :Feb-2011tojune2013
POJECT :HighVoltageSP-5ANDMC-5BUILDINGCOMPLEX
CLIENT :REDSEAREFINERY/JSDP/LUBREFANDYASREF(YERP)Ltd.
CONTRACTOR : SSEM/NESMA/ISS/ABVROCKGROUPLtd.(660********) CONTRACT I.D.No. C-721593.ARAMCOI.D.No.C-7079915SAP No.70013708.
JobResponsibilities
•Inspectionof Substationbuilding4No's of Bldg. ConstructionInspectionfrom foundationtoroofall includingblast-proof wallinspection.
•HighVoltageFoundationInspectionandtransformerwallinstallationinspection.
•EarthWork/Pavingslabaroundinsideplantandaroundfoundationinstallation.
•MainDam/RetainingwallSaddleDamconstructioninspection.
•Sub-ChannelworkinstallationallinspectionactivitiesasperscopeofWork-designanddrawings.
•Maintenance inspection in plant foundation repairs all heavy equipment foundations and channels installationsewagewaterdrainwaterandmanholedolphinConcreteblockfoundationinspectionasper approved drawings.
•Paving/Groutworkforfoundationtop-pour BasePlate Alignmentandsealantcontrol jointinpaving workinspections.
•OperatorsShelter(OS#1-7BuildingConstructioninspection).
•Bottomoffootingtoroof/parapetwallthroughoutblastresistanceretainingwallinstallation Inspection.
•Earthwork/PavingInspection
WORKINGEXPERIENCE
CompanyCONTRACTOR
:VelosiCertificationServiceL.L.C(ABU-DHABI) GALFARCONTRACTINGANDENGINEERING
CLIENT TAKREER -ADNOCPOSITION SR.CIVILQCEngineer DURATION March-2009toDec-2010
Job Responsibilities:
•InspectionofPipeInstallationintothetrenchdia2mcenterlinealightnmentandsettlement
•AnchorBlockFoundationPouringInspection.
•ManifoldBlockpouring inspectionand other size ofpipei.e:Dia 36",30",24"and20 inchesinstallationinspection.
•Pipesupportfoundation/Sleeperfoundationandblockwallfoundationinspection.
•Concretepouringinspectionundergroundseawaterintakefoundation.
•Checkingofexistingswaleprotectionmaterialinstallationandexpansionwallconstruction
Inspectionofbackfillingmaterialsisapproved.
PipeLineexcavationearthworkandalignment ofpipetrenchandlowering thepipecentreline of trench alignment inspection and sand bedding and constructionof concrete thrust block work inspection.
•Fencingwork/foundationofSSD-1FencefoundationInstallationInspection
•ConcretePre-castPanelfoundation/Wall-PanelConstructionInspection.
•DocumentationOfCivilInspectionworkandattendedinternal/externalandFinalauditingwithClient Auditor inallevery inspection responsiblework without N.C.R Raised byClient.
•Monitoring/supervisewithnewinspectorandsupportedtheminNCRhowtobeClosed.
•SafetyseminarattendedinseveralProjectandselectedexaminationofSafetyasaLevel-1
•WorksiteSupervisor/InspectionactivitiesandfinalPunchlistItemClosed
WORKINGEXPERIENCE:
Company GL-DOHA
Client QATARGASLAFFANREFINERY
Contractor Position Duration Project
DAEWOOENGINEERING&CONTARCTINGCO/AlJaberEnergy&Services.
SR.CivilQCInspector.
Jan-2007toFeb-.2009
:ExpansionofjettiesandSuiter-QG-11
JobResponsibilities:
Inspection ofRTR Pipe 30"inch &12 inches Installation storage and HandlingofMaterials and equipmentfoundation.
Concrete Pouring inspection ofThrust Block foundation andFull Thrust Anchor Foundations. GRP/GREPipeinsatallationinspectionofcenterlineandalighnmentofpipe.
Concrete pouring inspection of combined footing andunderground utilties catch Basin foundations. InspectionofBackfillingmaterialslayerbylayeraspermethodstatements.
QA/QCDocumentations.
•Prepareandfollowupofmaterialrequesttomaterialsprocurementdepartment.
•Prepareandfollowupofactionrequesttofabricationandmaintenancedepartment.
•Dailyschedulingandmonitoringofmanpowerandequipment.
•Preparedailyworksitereportofmanpower,equipmentandactivitiesfordailysubmittaltoSAPMT.
•Preparedailyworksite activitiestositeengineers/foremanforimplementation in accordanceto Saudi Aramco Approved Drawings,Standards & Specifications.
•Monitorand checkall dimensionslay out,elevationand plumbnessto ensurethat all activitiesare within the projectscope and specifications.
•Monitorthepreparationand executionofconcrete testing resultsandensure thatallworks conform to the project specifications and relevantstandards.
•Fullresponsibilitiesfortheimplementationofsiteactivities.
•Providedailyequipments,toolsandmaterialrequiredoneveryactivity.
•Advanceplanningoneveryactivityforequipmentmaterialandmanpowerrequiredforeachactivity.
•Submittheactivityreporttotheconcerneddepartment.
•Inspectionand supervisionof concrete pouring and site work such asexcavation work,footing and gradebeamlayout,superstructureslabs.
•Checkingforthelayoutofthebuildingsoffsettinganddistanceasperplansandapprovaltothe clients.
•If backfillingis required select a good back fill material and inform the client for inspection and get sampleforlaboratorytest.
•Check fortheinstallationofpolythenesheet withapproval required thickness and alsoforming if sufficienttoholdtheconcrete.
•Testing the cement,sand and aggregates and water if required,to be tested by independent laboratory.
•Constructionofthefoundationforthebuildings,checkingfortherebars,form workscoordinatesand elevation,embedded,pouringconcretewitnessingfor samplingandtesting theconcrete caringofconcreting andtestinglaboratory crashingofsamples.
•Inspection of form works,reinforcements and check position of anchor bolts if they are in the specifieddimensions.
•Checktheinspectionofeveryexcavationtoseecontractorsarewithinthespecifiedlimits.
Company Project
:ChiyodaTechnipJointVenture
:QGIILNGOnshoreFacilities,RasLaffan
Job Responsibilities:
•Witnessingtheinspectionofgroutingworkswitherectedstructures.
•Performtest to compactedbeddingsurfaces,alum test to concretematerial to be poured on caster manholes and basins compaction test sub grade,sub base and asphalt base course and excavation, installation andback filling.
•Reviewscopeofworks,designdrawings,plans,detailsandspecifications.
•Implement the engineering managementon site which refers to the activities combining technical knowledge,organizingworkforce andmotivatingmanpowertoachieve thestandard output within thebudget cost.
•Coordinatingwithprojectteam,ClientsandSubContractorsregardingQualityandsafety.
•Inspectionandassociatedcheckingofallprojectactivities.
•Linecheckingpunchlisting/clearingofthepunchlistaspertheprojectspecificationsand requirements.
•CoordinatingwithQNQCforeffectiveimplementationofqualitysystemrecommendedqualityaudits and follow up.
•Ensuretheresultsofinspectioninaccordancewithprojectqualityplan.
•Toensurethatqualityrequirementsaredeterminedandsatisfiedthroughoutallphrasesofcontract performance,including,asapplicable,design,developing,procurement,constructionandpre-commissioning.
Company Contractor
Client
Project
AramcoI.D. Position Duration
:Al-TamimiCo.Cons.Division
:TecnicasReunidasGulfCon'tor/TekfenConstruction&Installation&N.S.HEst.
:SaipemCo./ MMGCo.
:ARAMCO/ABB,LumusAliraza/SABIC
:DHT Projectat YanbuRefinery/PetrochemicalWorks,Yanbu-01Expansion Project. GasWellProjectWell#9&10./HaradGasPlant./BerryGas(Up-GradeFireWater).
No#7079915
Sr.CivilQCInspector Oct-2001toDec.2005
Job Responsibilities:
•Monitoring Inspections progress,review Inspectors'reports and documentation. Verify upon completionofthe work,thatallrequirementshavebeenmeet andthat the requiredQuality recordshave been collected and filled.
•Updatingandrevisionofthedrawingsaccordingtoamendmentsandmodificationscarriedoutinthe field.
•Overseethedailycontentandconsistencyofsub-ordinateinspectors'dailyinspectionlogbooks.
•ImplementationofCompany'sQNQCProgram
•PrepareQNQCplanindicatingdifferentholdpoints,witness&inspectionpoints.
•Implement&ensure that workmanship,materialsandequipmentarehandledwithstrictadherence&conform toSaudi Aramco Approved Drawings,Standards&Specifications.
•Monitorandimplementprojectscheduleandpreparedaily,weeklyandmonthlyprogressreports.
•Monitorandcheckall dimensionslay out,elevationand plumbnessto ensurethat all activitiesare within theproject scope and specifications.
•Monitorthepreparationandexecutionofconcretetestingresultsandensure thatallworksconform to the project specificationsand relevant standards.
•Fullresponsibilitiesfortheimplementationofsiteactivities.
•Providedailyequipments,toolsandmaterialrequiredoneveryactivity.
•Advanceplanningoneveryactivityforequipmentmaterialandmanpowerrequiredforeachactivity.
•Submittheactivityreporttotheconcerneddepartment.
•Inspectionandsupervisionofconcrete pouringand sitework suchasexcavationwork, footingand gradebeamlayout,superstructureslabs.
•Checkingforthe layoutofthebuildingsoffsettinganddistanceas perplantsandapprovalto the clients.
•If backfillingis requiredselect a good back fill materialand inform the client for inspectionand get sampleforlaboratorytest.
•Checkfortheinstallationofpolythenesheetwithapprovalrequiredthicknessandalsoformingif sufficienttoholdtheconcrete.
•Testingthecement,sandandaggregatesandwaterifrequired, tobetestedbyindependent laboratorv.
•Constructionof the foundationfor the buildings,checking for the rebars,form works coordinatesand elevation,embedded,pouringconcretewitnessingfor samplingand testing the concrete caringof concreting andtestinglaboratorycrashingofsamples.
•Inspectionofformworks,reinforcementsandcheckpositionofanchorboltsiftheyareinthe specifieddimensions.
•Checktheinspectionofeveryexcavationtoseecontractorsarewithinthespecifiedlimits.
•Witnessingtheinspectionofgroutingworkswitherectedstructures.
Page5of8 D:\DocumentsandSetlingsluser\Desktop\Civil_lnspector_C_V_-2.doc
Company Position Duration
:Saleem&Associates/MoghulConstruction/Ahmed&Associates
:QA/QCCivilInspector
:Jan-1996toAug-2001
•Constructionofthefoundationforthebuildings,checkingfortherebars,form workscoordinatesand elevation,embedded,pouringconcretewitnessingfor samplingandtesting theconcrete caring ofconcreting andtestinglaboratory crashingofsamples.
•Inspection of form works,reinforcements and check position of anchor bolts if they are in the specifieddimensions.
•Checktheinspectionofeveryexcavationtoseecontractorsarewithinthespecifiedlimits.
•Witnessingtheinspectionofgroutingworkswitherectedstructures.
Company Position Duration
:Saleem&Associates/MoghulConstruction/Ahmed&Associates
:QA/QCCivilInspector
:Jan-1996toAug-2001
Job Responsibilities:
•Inspectionofexcavation&backfillingactivities.
•Surveyofundergroundservicespriortoexcavation.
•Ensureexcavationsarekeptfreeofwater.
•Checkingnoforeignmatterisinthetrenchduringbackfilling.
•Ensuringapprovedbackfillmaterialisused.
•Checkingsegregation,gradation&moistureofbackfillmaterial.
•Checkingdepthofeachlift.
•Checksandbidding.
•Monitoringoffielddensity/compactiontesting.
•Inspectionofincomingmaterials.
•Formworkinspection.-Cmublocksinstallation
•CoordinationwithclientforinspectionPlasteringwork-Paintingworks
•Inspectionofrebarbending&repairofepoxycoating.
•Checkingthatapprovedmixdesignisused.
•Monitoringofcylinderpreparation.
•Inspectionreportspreparation.
•Ensuringthatformworkiswatertightduringpouring.
•Checkingrebarworkasperdrawing.
•Inspectionofconcreteactivities.
•Inspectionofallcivilworksincludingtheconstructionofbuildingandsub-stationbuilding.
•Inspectionofqualityplan.
•QA/QCDocumentation.
•ConcreteSlump-Test
•CheckingBatch-to-batchuniformityofconcrete.
•Checkingtemperatureofconcretewhileplacement.
•Preparationoftestcylinders.
•Monitoringofconcretepouring.
•Checkingsoilanalysis&surveyaspects.
•Inspectionofcathodicprotectionandanodeinstallation.
Page7of8 D:\DocumentsandSetlings\user\Desktop\Civil_lnspector_C_V_-2.doc