MUWAFFAQ ZUHIR AMIREH
Contact number: +224-***-******, +962*********
Email : **************@*****.***
PROFILE SUMMARY
** ***** ** ********** ** Project Planning, Contract Management, Resource Allocation and Relationship Management
Expertise in planning, monitoring and coordinating multidimensional execution of projects
Adroit at complementing the projects as per schedules within budget by proper planning of activities, material procurement, deploying manpower & machinery
Expertise in dealing with Clients, Consultants, Contractors, floating enquiries, procurement coordination, inspection follow-up, expediting deliveries and site administration.
A strategic planner with experience in conducting & coordinating the project activities, estimation & costing and the resource management.
Expertise in cost analysis, project estimates, Structural analysis, quantity survey and quality control, ability to organize and control multi-discipline engineering requirements in accordance with client-approved plans.
JOB OBJECTIVE – Minimum Qualification
- Executive of Infrastructure Projects, Built Road & Paving Asphalt, Installed All Utilities
- Structural buildings and Heavy-Duty Building Project
- Executive for USAF Airport Project Apron CCA Ramp, Taxiway, and Runway.
- Marine Construction Engineering of Executive & Installation a Quay Wall.
- Revetment Walls, Breakwater, Dredging & Reclamation projects.
- Executive of Power Plants Green Diesel Projects in Oil and Gas Field.
EXPERIENCE:
2020-present: Projects Director
Global Consulting Center S.A.R.L (Guinea – Conakry)
Role & Responsibilities:
-Developing project plans and budgets to ensure successful completion of projects.
-Managing multiple projects simultaneously, ensuring deadlines are being met with customer satisfaction.
-Monitoring progress, identifying risks and determining corrective action to rising problems or risks.
-Scheduling regular meetings with stakeholders to review project status, discuss changes or issues, and develop solution.
2014-2020: Regional Projects Manager and Consultant
Khatib & Alami Consultancy (KDC Ltd.)
Projects:
1) Construction of Saudi Arabian Embassy Offices and Ambassador`s Resident – Conakry, Guinea
2) Educational modern building construction 111 with (TBC & AECOM) – Riyadh, KSA
3) Projects Coordination of North and South Regions of KSA for the Ministry of Housing for Villas & Infrastructural
Projects at K&A / CEC.
4) Project Manager Consultant of infrastructural Project Al Kharj Industrial City MODON Phase 2 (Al Kharj- KSA)
Role & Responsibilities:
• Developed and implemented project plans, budgets and timelines and establish priorities for maintenance, design,
development and analysis of entire infrastructure stages.
• Monitored progress against the plan and reported on variances.
• Managed stakeholders and clients expectations and maintained effective communication channels.
• Coordinated resources for projects ensuring they are allocated efficiently.
• Supervise and provide support and monitor a team of to maximize the activities revenue as well as train upcoming
managers for duty.
• Hold coordination meetings to prioritize work site and work to resolve disputes.
• Provide leadership in steering projects toward defined standard infrastructure solutions, platforms and best practices.
2007- 2014: Senior Construction Manager (CPEng.)
Contrack International OCI. JV. Construction Instructress- United Arab Emirates
Projects:
1) Borouge III Construction & Executives of Green Diesel Projects with Abu Dhabi Polymer Company Limited, TSJ Ltd. (Tecnimont) and Samsung Joint Venture – (AlRuheis – UAE)
Project: Executing power plants of Green Diesel with Heavy Structures & Architectural 58 Buildings Works for 10 Substation Buildings, 2 Blender Silos Flush Air System, 2 Compressor Area 4 Powder Bins including Haulage System, etc. including Infrastructure Networks. Installing all utilities like water pipe lines of different dimensions HDPE pipes from 1200mm HDPE firewater pressure. Carrying out fabrication & erection with the chambers & fittings and managing HDPE potable water pressure piping fabrication & erection with chambers & fittings, and sewerage networks system for some buildings. Pivotal in installing power cables 400 KV, 132 KV & 122 KV, finishing street lights.
2)Al Reem Island Development Infrastructures Package 1 & Sector 5&6 Infrastructure Projects with Bunya and Tamouh (Abu Dhabi- UAE)
Project: Constructed bridge and the tunnel between Bridge & Marina Square connecting paving asphalt for all original & local road. Interlocked the streetlights & installed all utilities for the owner BUNYA & Tamouh including University Al Sorbonne like Sewerage Networks System for each plot. Carried out fabrication & erection of pipes and developed manholes, connections with the main line with the Authority Approval Testing and Commissioning, Build One STCC Building for Traffic Control. Built and executing original & local roads around 30 km including Curb stones and 4th layers of Paving Asphalt. Street lights. Traffic lights. Camera’s sys,
3) Al Saraya Development Project Infrastructure & Hard Landscaping and Marine Works for Lagoon Sheraton area with Sorouh – (Abu Dhabi- UAE)
Project: Installed utilities Networks Fabrication & Erection Chambers Manholes & Commissioning of following:
oStorm Water Networks, Gas System Networks, Telecom Utility Networks, Fire Fighting Hydrants, and Irrigation System Networks including Pump Station and 2 Reservoir 20000 m3
oLandscape of 19 Fountains Water features with Equipment, Rooms, Mechanical Works for the Underground, Electrical Tunnel, Installed & Laying of Cables Medium & Low Voltage
oInstalling of Panel Boards & Control Panel for each plots, Lighting Fixture and Earthling system built of Roads & Paving Asphalt, Street lights, curb stones interlock)
oPreparing the 29 plots for towers & dismantle the old quay walls corniche, the existing
Dec’2005-Sep’2007: Petroserv Limited in the Head Construction Division, Doha as Projects Manager for Infrastructures Projects in Qatar
Project 1: Led the construction of TSE Main to Al Rakhiya Farm (Doha & Rayyan Sewerage). Deftly constructed the connection chamber that included risk assessment, working around the live twin 800 mm TSE mains water lines, exposing the existing TSE main pipes and installing two reducers from 800 mm to 600 mm for DHPE 600 mm water pipe lines along 20 km including installing of 40 Chambers.
Project 2: Cultural Village Project Marine Beach Construction Including Sewerage System &Pump Station
The project included 2 rooms; 1 Mechanical Room with all equipment & electrical room with panel board & control panel, paving around building and protection fence, executing of precast concrete culvert underground to outfall the Sea Beach, dredging the beach from 0.0 level up to – 2.50 m along the beach for 4.0 km.
Project 3: Marine Division Projects as Project Manager Doha, Developed Al Wakrah Port Phase 2 Quay Wall Breakwater for Qatari Coast Guard.
Project Handled Developed Al Wakrah Port Phase 2 for Qatari Coast Guard. Managed a Quay Wall Breakwater, Dredging & Reclamation. The project consisted of Dredging & Excavating Rock, Filling Rocks Laying & Construction of Concrete Block Quay Wall, Installation of Furniture, Pontoons, Steel Piles, and Portal Station. Worked for Open Sea Doha for Doha Port. The project was in dredging
PREVIOUS EXPERIENCES
2004 – 2005: Project Manager Marine Division Projects as with Petroserv - (Doha, Qatar)
2003-2004: Sr. Structural Manager/ Consultancy Al Zayani Profile Engineering & Architectural Consultants
Resident Engineer – (Manama, Bahrain).
2002- 2003: Construction Manager with Allied Arms Company Ltd. Constructing and structuring projects for the
USA “Air Force / Shaikh Essa Air Base”- (Manama, Bahrain).
1998-2000: Achievement of Amiri Palace Project Manager for design and implementation (Manama, Bahrain)
1992-1998: Project Manager Crown Prince Court (Manama, Bahrain)
1991-1992: Supervisor Senior Engineer for the Ministry of Education & Labour for building School Projects
2001-2001: Executive site Manager for the Fast-Contracting Special Projects Company (Durrat Khaleej)- (Raas
Elbaar, Bahrain).
1998 – 2000: Project Manager in Amiri Court (Manama, Bahrain).
1992-1998: Project Manager in the Crown Prince Court (Manama, Bahrain).
1988 –1990: Civil Engineer at the Royal Corps of Jordanian Army (Amman, Jordan).
1987 – 1988: Site Engineer at AL Tamimi Pvt. Company- (Amman, Jordan).
EDUCATION
Bachelor & Master Degree of Science in Industrial & Civil Engineering at University of Academic Belarusian National
Technical University – Minsk.
Diploma Engineering from Der Hessische Kul Tusminister in Frankfort Germany.
Other Courses:
Diploma Design Professional in USSR for 4-weeks
Work Master Diploma – Reinforced Concrete and Stone Structures in USSR for 15-weeks.
Studies Technical of Language.
Ability to communicate both oral and written in four (4) languages: English, Russian, German, and Arabic.
Conferences and Seminars:
Monthly Technical Day – Project Risk Management 30 Aug. 2014 / Saudi Council Engineers.
Dubai International Project Management Forum (DIPMF) 28 – 30 Sep. 2014 Madinat Jumeirah Dubai – UAE.
TRAININGS ATTENDED
Introductory Geodesy Practice in USSR
Introductory Technological Practice in USSR
Technological No. 1 in USSR
Technological No. 2 in USSR
Sewerage Systems HDPE Pipeline and Gate Valves No. 3 in USSR
Marine & Heavy Equipment at Abu Dhabi Municipality Development & Planning for 4 months with Poskales Company.
Project management Profanation / Project Manager for the PMBOK in Cambridge Institute.
MEMBERSHIPS
Jordan Engineers Association Civil Eng. Structural Engineer from Jordan since 1987
The Bahrain Society of Engineers Civil Engineer, from Bahrain.
Saudi Engineering Association Civil Eng. Project Management.
A Degree Level One of 10th Registered Clause Fifteen Engineer Representative with the Public Works Authority in State of Qatar
Project Management Institute / A Global Membership Association (PMI)
IT SKILLS
Well versed with Excel / Microsoft Windows, AutoCAD 2 & 3
PERSONAL DETAILS
Nationality: Jordanian
Languages: Arabic, English, German & Russian (willing to learn new languages to adapt
Marital Status: Married.
No. of Dependants: 4
LinkedIn Profile : https://sa.linkedin.com/in/Muwaffaq-amireh-830a7630