Post Job Free
Sign in

It Support Data Science

Location:
Dakar, Senegal
Salary:
3500000 XOF net monthly
Posted:
April 12, 2025

Contact this candidate

Resume:

Quality

Charismatic

Organizational

skills Detail-

oriented

Rigorous

Punctual

Contact

Language

Expertise

Experience

******@*****.***

+221-**-***-**-**

Almadies 2 Dakar, Sénégal

Drafting of CDC(Hardware & Software),Analysis and reception of offers Troubleshooting computers,printers,

Scripting with Python, Bash, PowerShell, JavaScript/ECMAScript Administration and troubleshooting on Google Workspace & Microsoft 365 Computer installation, imaging and domain junction Printer and scanner installation, Lan, Wan, Wireless network junction

Hardware and software management / Preparation of support activity KPIs using Easy Vista software, Help-Desk.

Use of tools such as: Active Directory, LAPS, OCSI, Cisco Anyconnect, Mcafee Drive Encryption, WAPT, FOG, CloneZilla, AOEMI,Bitlocker, F-Secure, Blancoo Drive Eraser, Airwatch, Vmware, ITIL, SCCM, Asterisk etc... Daily management of unclassified computer hardware, software, and network resources.

Administration of Microsoft Windows 2012/2016/2019 Servers and Windows 10 Operating Systems.

Support and maintenance of video conferencing applications. Limited web programming for internal systems.

Main backup for the maintenance and troubleshooting of Consular Affairs Systems.

Email

Phone

Address

IT

Telecommunication Server

Configuration(2G,3G,4G,5G,RF)

Electrical Programming

Arabic Instruments

Application development

WEB (Full Stack)

Data science engineering(BI/BIG

DATA)

November 2024 - Mars 2025

US Embassy, Dakar

IT systems administrator

march 2018 - October 2024

BCEAO -IT & Network Help Desk

IT Support Engineer (Software, Hardware)

2014- 2018

GCO SA (ERAMET) Technical Department-Dakar

Electrical and Instrumentation Supervisor

Mbaye Babacar MBODJ

COMPUTER ENGINEERING, TELECOMMUNICATIONS AND ELECTRONICS Install, troubleshoot and perform preventive and corrective maintenance on measuring instruments: flowmeter, densitometer, weight meter level transmitter (weighbridge, conveyor belts), pressure transmitter, analog and digital actuator and positioner (4-20mA / 0-10V control) Programming Siemens and GE-FANUC PLCs with STEP 7 and Proficy Machine Edition 8.5

Use of WonderWare platform, Wincc as SCADA & ladder Programming and installation of Siemens drives, servomotors, Danfoss and use of Siemens HMIs, RF engineering (antennas, equipment & software)... IT and electronics engineer with over 15 years of experience, specializing in IT administration, automation, and infrastructure management. At GCO (ERAMET), I supervised a team of 14 technicians, optimizing maintenance and equipment installation. Detail-oriented and results-driven, I am passionate about innovation and technical efficiency.

French

English

Arab

Swimming Scrabble

Politics,

Art & Culture

Managing a team of 14 electrical

technicians and instrumentation

at GCO for over 2 years with

very positive results

Managed a team of 50+

mechanics, electricians and

IT technicians at SIBA for

over 4 years with positive

results and goal

achievements.

2012 - 2014

SIBA -Technical Department-Dakar

Assistant Production Manager/Maintenance Manager

2008 - 2012

SIBA -Technical Department-Dakar

Maintenance Manager / Maintenance Planning Manager Déc 2022

Ecole Supérieure Multinationale Des Télécommunications -ESMT, Dakar Master in Information Systems Engineering Specialization: Engineering Déc 2021

Ecole Supérieure Polytechnique -ESP, Dakar

DIT in IT and Telecommunications

Specialization: Computer Engineering

Juill. 2008

Ecole Supérieure Multinationale Des Télécommunications -ESMT, Dakar DUT in Electrical Engineering

Specialization: Electronics, Electrical Engineering, Automation and Computer Science

IT/Programming/Web development /IA/Data Science/2xAWS Certified

MANAGERIAL

SKILLS

Centres d’intêret

FORMATION

REALISATIONS

Monitor the installation of a continuous galvanizing line Define the company's budget, and ensure operations Implement CMMS at new site

Manage sheet and bin production

Implement an annual maintenance plan Ensure compliance with the plan by checking the availability of material and human resources for the proper execution of maintenance (preventive and corrective), etc.

2015-2016

GCO, Eramet

Implementation of an automated control process for water tank management with level and flow sensors and actuators for water addition flow and pump control.

Installation and calibration of a moisture sensor on an ore conveyor belt

2012-2014

SIBA

Installation of a continuous galvanizing line, a project with a budget of over 100 million euros, from the purchase of equipment and recruitment of service providers through to delivery of the plant, helping HR to recruit resources

(electricians, mechanics, welders, etc.).

2009-2011

SIBA

Implementation of the Optimaint CMMS solution throughout the site (SIBA), including server installation, deployment on user workstations and user training.



Contact this candidate