Post Job Free
Sign in

Team Lead Traffic Signal

Location:
Abu Dhabi, United Arab Emirates
Salary:
10000
Posted:
April 11, 2025

Contact this candidate

Resume:

* ** *

Sajid Mahmood

B-Tech (Hons) Electrical

Cell No: +971-**-*******

Email: *******@*****.***

Proposed Position: Electrician Traffic signal

OBJECTIVE:

To grow and establish myself in an organization where my skills can be utilized in prescribed manners and organization promotes financial and economic stability to its employees. Currently seeking employment with a highly technical oriented company where I could use my knowledge gained in 19 years extensive experience in the field of Electrical Power and Telecommunication.

EXPERIENCE: (19 + Years)

Working in Roads an Transport Authority ( RTA ) as Traffic signal Electrician

Worked in MOBISERVE PAKISTAN as Senior Team Lead

Worked in PARSONS as MEP Engineer ( Electrical

Worked in MOBILINK as Electrical & Telecom Engineer

Worked in TELENOR, as Team Leader for installation of Telecom Equipment Employment History

Responsibilities:

Period : June 2020 – till date

Company: Roads and Transport Authority ( Dubai )

Location: Dubai

Position: Traffic signal Electrician

Installation and Troubleshooting the Traffic Light Controller ST 800 and ST 950

Installation of new Junctions which includes Traffic Light Controller, Signal Poles and Signal heads as per drawing.

Uploading the Program in new Traffic Light Controller.

Junction testing before making it operational.

Signal and Feeder Cables laying through duct for new Junctions.

Have experience of installation of Signal heads 300 mm, 200 mm & 100 mm. 2 of 4

It also includes the installation of Push Buttons for Pedestrians.

Installation of Stop and Scoot loops.

Megger Testing to trace out the cable faults.

Power cable connections fromFeederpillarofDEWAtoTrafficLightController.

Maintaining the TLC with Generator power while the outage of DEWA.

To make assurance of Communication of DATA signal with Etisalat and Traffic Control Centre.

Period : May 2016 – January-2020

Company: MOBISERVE

Location: Gujranwala, PAKISTAN

Position: Senior Team Lead

Responsibilities:

Managing team to meet the targets and achieving rollout mile stones well in time

Co-ordination with Client and other departments andContractortoresolvethedayto day site Power issues.

Observing the Safety/Security issues at site and report to Security department.

To analyze the daily report in order to check cost/benefit ratio.

To ensure the timely implementation of Preventive Maintenance of Cell sites.

Report on the progress of electrical works as directed by Project manager.

Routine and Schedule inspections.

Budgets and Scheduling.

Method Statement, Technical studies of various available systems.

Preparation of internal audit reports with in the section.

Quality control.

ROW & Co-ordination with Vendors to execute the work within given time frame.

Handled all the aspects of Project management.

Period : Feb 2014 -- May 2015

Company: PARSONS (SAPL, Saudi Arabian Parsons Limited) Location: Al-Qateef

Position: MEP Engineer, Electrical

Responsibilities:

Worked on Housing infrastructure project in Al-Qateef, KSA under Ministry of Housing.

Underground installation & Laying of LV, MV Cables, street lights system networks, Feeder Pillar, substations ( 13.8 KV / 400 V AC) as per approved Materials

Co-ordination with SECO for drawings and Material approval.

Evaluate officially received notice of variation in order to recommend appropriate action and determine changes in fittings and/or specifications affected. 3 of 4

Co-ordination with other departments and Contractor to resolve the day to day site electrical issue.

Review the Electrical and Telecom approved drawings, Shop drawings & Material Submittals.

To make Site Instructions to Contractor and follow up.

Observing the Safety issues at site and report to Safety department.

To analyze the daily report in order to check cost/benefit ratio.

Factory visits for Material inspection including test to verify material standard.

To ensure that Electrical/Telecom installations are according to the prescribed design.

Report on the progress of electrical works as directed by Project manager.

Routine and Schedule inspections.

Budgets and Scheduling.

Inspection of Project Site.

Method Statement, Technical studies of various available systems.

Preparation of internal audit reports with in the section.

Quality control.

ROW & Co-ordination with Vendors to execute the work within given time frame.

Period : June 2006 – Feb 2014

Company: MOBILINK GSM (Pakistan)

Location: Lahore/Multiple Locations

Position: OAN Network Engineer - Transmission & BSS Support (Specialist-II) Responsibilities:

Managed some of major telecom region of Mobilink with the equipment. Managing and organizing activities relating to O&M of BSS & Transmission. Major responsibilities are included but not limited to:

Active participation in HUAWEI swap project in 2008, 2010 & 2014.in MOBILINK.

Assembling and installation of HUAWEI Power cube.

Installation of HUAWEI RTN 905 & 950 and HUAWEI BTS 3900.

Including 2 MSCs, 22 BSCs, 250 Cell sites, different type of Transmission Medium

(OFJAN, ATM, and Microwave) and Power sources.

Commissioning and Integration of BTS (indoor/outdoor/micro/mini) sites.

Managing team to meet roll out targets and achieving rollout mile stones well in time.

Changes in network topology according to BSS Implementation plan.

Commissioning and Integration support of DUAL Band (900-1800) sites.

Changes in BSC parameters as per requirement of NSS and RF department. 4 of 4

Responsible to integrate any new entity in the network, for Proper maintenance of live equipment, connectivity's in various directions, availability of data Services (GPRS) etc.

Hands On experience of Launching 3 New Huawei MSCs.

Responsible to carry out DRIs (TX/RX calibration), perform health Checks, path balances activities, reflection checks, kind of acts.

Removing BSS alarms of DRIs, BSCs, XCDRs come under my responsibility to maintain the quality of network in this region.

Excellent grip of working on Motorola BSS Equipment.

Excellent understanding of GSMArchitecture.

Responsible for providing operational support using OMT-RC.

Responsible for producing weekly reports, formulating the progress sheets, making site preventive visit plans and schedules.

Coordination with RF Optimization team to resolve KPI related issues due to hardware errors.

Coordination with other departments i.e. RF Planning, Transmission, NSS, Acquisition, Energization, Production, Deployment

IMPORTANT ACTIVITIES:

I have planned, executed andmanageddifferentactivitiesdependingupontherequirements.

Commissioning and Integration: I have commissioned and integrated SIEMENS equipment.

Cutover/BSC Rehoming: This included cutover of whole BSS from one MSC to another. I was involved in shifting of whole BSS from ALCATEL MSC to HUAWEI MSC.

SWAP: I have worked on the swapping of Motorola BSS with HUAWEI BSS.

Expansion: This included TRX expansion of sites. I have performed this activity using Radio Commander® (RC).

Reparenting: This included shifting of BTS sites from one BSC to another. TOOLS:

At ease with Local Maintenance Terminal (LMT) used for commissioning Equipment.

Local Craft Terminal (LCT) used for commissioning SIEMENS Radio Links (Microwave)

PNMT used for commissioning of NEC Radio Links (Microwave)

5 of 4

Period : January 2005 – May 2006

Company: TELENOR GSM (IT WORKS)

Location: Lahore/Karachi

Position: Team Leader

Responsibilities:

To manage and resolve Power related issues on core site of Telenor MSCs & MGWs.

Complete InstallationandOperationof (Electrical Power) on Telenor Main Switching Center.

LV/HV Cables for installation of Gensets.

Installation of Cable Tray / Ladder for AC/ DC supply with Proper and Suitable Route.

Electrical Distribution Boards, Lightning Protection & Earthing.

Installation of Fire alarm System (Brand C-Tec and Manvier)

Installation of Fire Suppression System at Telenor sites.

To power up the MW link from ELETEK rectifier.

Complete Installation, Operation & Maintenance of MicroWaveLinks(Siemens) in the field of Transmission TELENOR GSM.

To assemble and install the MW antennas of different diameter. (0.3m, 0.6m, 0.9m, 1.2m)

To install MW antennas of different diameter. (0.3m, 0.6m, 0.9m, 1.2m) using rope and pulley on different type of Towers

Have a rich experience to do work on various types of Towers Mono Pole, Guy Wire, Mast and Self Supported

Patching of Tributary cable (8E1) on DDF as per standard

To make sure that Equipment (indoor, outdoor, IF cable) is grounded as per standard before getting it powered up.

To make sure the weather proofing of outdoors connectors.

Proper cable dressing and Tie up the cables indoor/outdoor.

Metal labeling at outdoor equipment

ACADEMIC QUALIFICATION:

ACADEMIC QUALIFICATION:

Year Qualification Institute

2012

Bachelor of Technology Hons. (Electrical

– 4 Years)

Preston University, Pakistan

2005

Diploma of Associate Engineer (Electrical

- 3 Years)

Punjab Board of Technical Education

Lahore, Pakistan

6 of 4

1997

Matriculation ( Science ) Board of Intermediate & Secondary Education, Gujranwala, Pakistan

COMPUTER COURSES:

Auto CAD

Highly computer proficient Microsoft Office (Word, Excel, PowerPoint, Outlook)

Windows98, Windows 2000,NT, Windows XP, Windows 7

Diploma in Hardware & Computer Application.

Troubleshooting of the Systems.

Complete Assembling and Installation of Computers.

Installation of various type of softwares

Internet usage.

LANGUAGE PROFICIENCY:

English & Urdu can speak, read & write.

OTHER ACHIEVEMENTS:

“Certificate of Achievement” awarded in 2008, (MOBILINK)

Certificate Awarded HUAWEI SWAP PROJECT” 2010

Certificate Awarded HUAWEI SWAP PROJECT” 2014

PERSONAL:

Date of Birth: 3rd September 1981

Passport No: AN0158834

Driving License No (KSA): 236*******

Driving License No (UAE): 4034576

I hereby declare that the details furnished above are true to the best of my knowledge.



Contact this candidate