Vereeniging, South-Africa ****
***************@*****.***
PERSONAL SUMMARY
Committed job seeker for a position
in your organization, where I can
deliver my attentive skills to ensure
the Quality work. I have experience
in a variety of practical roles
internationally in Quality Control
and Quality Assurance which is
supported by a strong work ethic
and willingness to learn new skills.
I'm experienced in supervising with
good attention to detail. I am
therefore open to employment
opportunities where my skills and
experience could be considered
useful and transferable. I feel I'll be
a great asset to your team and
company as I have a history of
meeting company needs with
consistent and organized practices.
Skilled in working under pressure
and adapting to new situations and
challenges to best enhance the
organizational brand.
SKILLS
• Welding
• Self-directed mindset
• Project management
• Training and mentoring
• Legal description interpretation
• Measurement collection
Leon Lambrechts
EXPERIENCE
July 2022 - Current
QA/QC Coatings & Corrosion Inspector (Offshore) CLC Inspections & Surveys (Akzo Nobel)
- Conduct:
September 2020 - July 2022
QA/QC 3rd party inspection & Alternative construction supervisor
(Concrete and Coatings) DPA Engineering (Sasol, Secunda) South- Africa
August 2019 - August 2020
QA/QC 3rd party inspection (Coating) M&S Corrosion Control (Sasol, Natref) South-Africa
• Inspection and surveys for whole SBM FPSO fleet offshore:
• Brazil
• Guyana
• Angola
• Equatorial Guinea
• Fabric Maintenance Planning and Management
• Inspection and Survey
• Coating Specification
Conforming to all acceptance criteria via the specification/ method statements to allow wet abrasive blasting before shotcrete and coating to be applied
•
• Recordings of all environmental conditions
• Recordings of Wet abrasive blasting surface profile (CSP standards)
• Witnessing of shotcrete and coating systems
• Recordings of all DFT's (Coating)
• Witnessing Phenolphthalein & adhesion testing
• Conducting soluble salt tests as required via specification
• Witnessing all core tests conducted
• Signing off on all data packs/ Reports before handing over to client
• Inspection of all scoping (Hammer Test) of cooling tower 245A
• Working at heights
• Material used on project: Concrete & Coatings
• Sika MonoTop 610
• Sika MonoTop 412 NFG
• Sikalastic 152 (Final Top Coat)
Wet Abrasive Blasting grit – Blastrite B90 grit & high pressure water jetting
•
• Method of application: Shotcrete (Guniting)
Reference: Daniel Ryding, Cell: +27-076-***-****, E-mail: ******@**********.**.**
•
Conforming to all acceptance criteria via the specification to allow blasting and then coating or lining of all tanks and pipes
•
• Recordings of all environmental conditions
• Civil engineering background
• Quality control
• Field surveys
• Team leadership
• Verbal/written communication
• Petrochemical
• Quality Assurance
• Engineering
• Piping
• Coatings
• Oil and Gas
• Concrete
November 2019 - February 2020
QA/QC Inspection (Coating) Stefanutti Stocks Durban, South-Africa May 2018 - December 2018
QA/QC Control JVI Services / Mutso Engineering Secunda, South- Africa
• Recordings of blasting surface profile
• Witnessing of coating or lining systems
• Recordings of all DFT's
• Recordings of all dust and debris
• Conducting soluble salt tests as required via the specification
• Signing off on all data packs beforehand overt to client
• Inspection of tank roof tops
• Working at heights
• Material used on project: STONCOR
• Carbozinc 859 (Primer)
• Carboguard 880 (Intermediate)
• Carbothane 134 (Final Top Coat)
• Blasting grit – Ecoblast & Blastrite B60
• Method of application: Conventional spray, Airless Spray Reference: Kobus Oosthuizen, Cell: +27-076-***-****, E-mail: *****@****************.**.**
•
Conforming to all acceptance criteria via the specification to allow blasting and then coating or lining of all tanks and pipes
•
• Recordings of all environmental conditions
• Recordings of blasting surface profile
• Witnessing of coating or lining systems
• Recordings of all DFT's
• Recordings of all dust and debris
• Conducting soluble salt tests as required via the specification
• Signing off on all data packs beforehand overt to client
• Inspection of tank roof tops
• Working at heights
• Material used on project: STONCOR
• Carbozinc 859 (Primer)
• Carboguard 193 (Intermediate)
• Carbothane 134 (Final Top Coat)
• Blasting grit – Ecoblast & Blastrite B60
• Method of application: Conventional spray
• Reference: Johan Kriel (Project Manager), Cell: +27-076-***-**** Conforming to all acceptance criteria via the specification to allow blasting and coating of all pipes
•
• Recordings of all environmental conditions
• Recordings of blasting surface profile
• Witnessing of coating system application on all flanges and spools
• Recordings of all DFT's
• Recordings of all dust and debris
• Conducting soluble salt tests as required via the specification Completion of all coating data packs (ISO's), before hand over and signing off final inspection for release and delivery to site
•
• Application method of paint by conventional spray Coordinating and managing of x1 team of 16 personals for the production line and quality
•
• Welding experience
March 2018 - April 2018
QC Control Redec Vilanculos, Mozambique
August 2016 - February 2018
QA/Quality Control Technician ATB Riva Calzoni Mozambique
• Visual inspection of the welding conducted
To confirm that weld conforms to the welding specification before coating can continue
•
• Material used on project: STONCOR
• Carbozinc 11 (Primer)
• Carbozinc 859 (Primer)
• Carboline 193 (Intermediate)
• Carbothane 134 (Final Top Coat)
• Blasting grit – Ecoblast & Blastrite B60
• Method of application: Conventional spray
Reference: Johann Viljoen, Cell: +27-82-855-****, E-mail: ******@***********.**.**
•
Conforming to all acceptance criteria via the specification to allow all sites to be coated
•
• Recordings of all environmental conditions
Witnessing of x3 coating system application on all welds, flanges and spools
•
• Recordings of all DFT's
• Completion of all painting data packs, before hand over
• Application method of paint by brush & roller
• Welding experience
• No welding responsibilities
• Only coating
All blasting and 1st coat (Primer) applied in workshop, Vanderbiljpark – Gauteng
•
• Material used on project: STONCOR
• Carbozinc 859 (Primer)
• Carboguard 193 (Intermediate)
• Carbothane 134 (Top Coat)
• Carbomastic 186 (Primer/Intermediate) used on site Reference: Louis Storm, Cell: +27-82-317-****, E-mail: *****@*****.**.**
•
Comprehensive Inspector representing ATB Riva Calzoni Contracting on the Massingir Dam water scheme project (Mozambique)
•
Witnessing and acceptance of Non-Destructive Testing and Destructive testing
•
• Inspection of welds and joints and internal linings via the QCP
• Witnessing welding via the WPS
• Assisting with TOFD
• Dye Pen Testing and MPI
• Fit up and alignment before welding commences
• Coordinating of x3 technicians
• Quality control of all documentation and data packs
• Signing off before handing over to client
• Experience: Coating systems and their application methods
• Destructive and Non-Destructive Coating tests and test procedures Good understanding and utilization of Coating thickness equipment and its limitations
•
• Inspection reporting
February 2014 - August 2016
Quality Control Technician Sonartech South-Africa
• Familiar with ISO, SSPC, NACE, ASTM, Codes and Standards
• Basic understanding of cathodic protection
• Co-ordination, supervision and planning
• Supervision of beveling preparation before fitting up
• Supervision of welding joints preparation
Supervision of piping fit up before welding according to the approved drawing
•
• Supervision of the WPS correct parameters during the welding activities
• Visual inspections to mark out defects
• Monitor repair process
• Wall thickness measurements on parent material
• Monitor consumables storage and usage
Skilled and understanding, but no certification in: Dye Pen testing, MPI, TOFD
•
Material used on project: Jotun – Jotamastic 87 & 90, Jotun – Hard Top Flexi
•
• Airless Spray
Reference: Luca Donadei, Cell: +39-338-***-****, E-mail: ****.*******@*****.***
•
Quality control of the whole project for external, internal work regarding coating and lining of all pipes
•
• Flanges, joints, Air valves and crotch plates
• Destructive testing and non-destructive testing
Monthly, weekly and daily planning with production to achieve progress targets
•
Managing of X3 groups with 8 people in a group for different sections with x3 super visors
•
All coating and lining documentation and signing of reports before handing over to the client
•
Material used on project: Sigma 523 & Sigma 588, Poly clad 777, Denso Primer, Bitumen Wrap
•
• Reference: Mervyn Shaw, Cell: 072-***-****
EDUCATION
June 2006
General Management Course Introduction to economics and management environment, Language and learning skills Unisa, South-Africa
January 2001
1st Year in Sport Management
Potchefstroom University, South-Africa
January 2000
Grade 12 / Matric Afrikaans, English, Mathematics, Geography, Economy and Accounting
Pietersburg High School, South-Africa
ACTIVITIES AND HONORS
• I play squash
• I workout
• I swim
CERTIFICATIONS
- NACE CIP Level 1 & 2 – Certified
- ISO 12944 Certificate - Certified
- Corrodere Academy – Coating Survey Level 1 - Certified
- BOSIET & CA-EBS – Certified
- PSSR – Certificate nr 24-07 And PSSR-74070 - Certified
- Personal Survival Techniques – Cert nr 24-07-PST-74176 - Certified
- CSWIP 3.1 Level 2 course attended 19th May 2017
- CBT Legal Liability OHSA - Certified 2021
- Working at Heights - Certified 2022
- Accident & Investigation – Certified 2021
- Effective contractor management – Certified 2021
- Planned task observation – Certified 2022
- OHS Act for management – Certified 2022
- OGUK Medical – Expires 05/06/2025
LANGUAGES
Afrikaans: First Language
English: C2
Proficient (C2)
Portuguese: A1
Beginner (A1)