Post Job Free
Sign in

Power Plant Engineering Department

Location:
Bhopal, Madhya Pradesh, India
Salary:
90k
Posted:
April 02, 2025

Contact this candidate

Resume:

ANIL KUMAR SONI

Name - Anil Kumar Soni

Email ID - *****************@*****.***

Mobile No - 975-***-****/789-***-****

Address - S/o Shri Ganga Prasad Soni Ward No. 14

District - katni kymore (M.P).

Total Experience: 16 Years Above.

Company Name. : Som distilleries Pvt.Ltd, (400 KLPD Distilleries Grain Based & Molasses) & 04 mw CPP, Bhopal (Raisen)

Company profile. : Distilleries & Breweries LTD.

Duration. Currently working Since Dec 2024 To Till Date. Current Role. : E&I (HOD) (Power plant and Process) Department. : Electrical & Instrumentation engineering department Responsibility

Management of breakdown and preventive maintenance of instrumentation and Electrical equipment

Involve in Instrument maintenance of 1X4 MW (MAAN Make) STEAM TURBINE with 1*45/1*25 TPH AFBC Boiler THERMAX MAKE, PLC GE & Process Plant PLC Allen Bradley Compect Logic, Siemens S71200.

Planing and executing Shutdown jobs.

Spare planing and purchasing.

Configuration of DI,DO,AI& AO for All PLC,DCS.

SCADA Modification in DCS,PLC.

Manages problems regarding PLC, SCADA, VFD, and HMI.

Knowledge of preparing breakdown reports, PM schedule,CM schedule and power consumption report.

Manages the daily, monthly basis maintenance of

transformer, motors, ACB and VCB.

Working knowledge of power plant maintenance of Electrical and instrumentation

Working knowledge of 40 TPH AFBC boiler,25TPH boiler and 4MW turbine

Knowledge of operations of boiler and turbine.

ANIL KUMAR SONI

Knowledge of compressor general maintenance

Working knowledge of Ash handling system.

Instrumentation calibration

Working Knowledge of mov's and electrical motors maintenance, MCC, PCC panels,HT and LT panels

Experience:

Company Name : Schneider Electric IND. PVT. LTD. (Dalmia Bharat Cement) Assam

Company profile : Capacity of Unit 9500 TPD Dry Process Cement Duration : Feb 2022 To Nov 2024.

Current Role : Site Incharge E&I (Project)

Department : Electrical & Instrumentation engineering department ERECTION & COMMISSIONING OPERATIONS

Installation, Calibration and loop checking of Field Instruments.

Designing, Implementing and commissioning of new control loops as per site requirements.

Assigning new IO’S, Alarms, and Graphics & Trends whenever required by Operation.

Troubleshooting of DCS HW (Controllers, I/O modules).

Configuration/Troubleshooting of Historian.

Maintain Protocols for Loop check & hook up field instruments till DCS end.

DCS logic check, simulation, drives check, protection check and trial run.

Trial run for MOV, MOD and simulating through logic.

Erection of pressure switch, pressure gauge, RTD, Thermocouple and transmitter with proper tubing as per the Hook up and P&ID.

Installation of all Vibration, Speed & Temp sensors.

Accompanying with contractors supervisor and site visits, review drawings/Specifications, scheduling/assigning work.

Monitoring work progress and ensuring quality work. Reports on proper completion of jobs for the preparation of work completion certificates and verification, Billing and Planning.

Company Name : MAHENDRA SPONGE AND POWER LIMITED

Company profile : SPONGE IRON DIVISION DRI 650 TPD Duration : NOV 2018 – JAN 2022

Current Role : Deputy Manager E&I Project

ERECTION & COMMISSIONING OPERATIONS

ANIL KUMAR SONI

Installation, Calibration and loop checking of Field Instruments.

Designing, Implementing and commissioning of new control loops as per site requirements.

Assigning new IO’S, Alarms, and Graphics & Trends whenever required by Operation.

Troubleshooting of DCS HW (Controllers, I/O modules).

Configuration/Troubleshooting of Historian.

Maintain Protocols for Loop check & hook up field instruments till DCS end.

DCS logic check, simulation, drives check, protection check and trial run.

Trial run for MOV, MOD and simulating through logic.

Erection of pressure switch, pressure gauge, RTD, Thermocouple and transmitter with proper tubing as per the Hook up and P&ID.

Installation of all Vibration, Speed & Temp sensors.

Accompanying with contractors supervisor and site visits, review drawings/Specifications, scheduling/assigning work.

Monitoring work progress and ensuring quality work. Reports on proper completion of jobs for the preparation of work completion certificates and verification, Billing and Planning.

Installation of all field instruments Related to Boiler. Company Name : STAR CEMENT CO.LLC RAS AL KHAIMAH (UAE) Company profile : CEMENT PLANT 8500 TPD

Duration : APRIL 2011 – DEC 2017

Current Role : SR. ENGINEER E&I.

Company Name : JP BAGHA CEMENT (HIMACHAL PRADESH)

Company profile : CEMENT PLANT 10000 TPD

Duration : NOV 2008 – MARCH 2011

Current Role : JR. ENGINEER E&I.

Professional Qualification:

Diploma In Electronics and Communication Engineering from Chhatrapati Sahuji Maharaj University, Kanpur Dehat, U.P. in 2005-2008 with 78.00%

Academic Qualifications

10+2 from M.P. Board in March 2005 securing 77% marks.

10th from M.P. Board in March 2003 securing 80.4% marks. ANIL KUMAR SONI

Personal Information:

Date of Birth - 16 July 1987

Nationality - Indian

Martial status - Married

Language - Hindi, English.

Persional interest:

Listening music, writing and playing cricket

Strength:

Knowledge seeking nature

Sincerity

Good leadership and believes in hard work as well as smart work Declaration:

I hereby declare that the information furnished above is true to the best of my knowledge.



Contact this candidate