Post Job Free
Sign in

Project Management Manager

Location:
Chicago, IL
Posted:
March 29, 2025

Contact this candidate

Resume:

Tamera Guilinger

*** ******** *****, *****, ******** 60120 ● 847-***-**** ● ******.*********@*****.***

https://www.limkedin.com/in/tamera-guilinger-18669959

Education & Professional Development

Colorado Technical University, Colorado Springs, CO, 2012

Bachelor of Science Degree in Intl Business Administration Project Management

31 Year Union Journeyman Carpenter with the Mid-America Carpenters Regional Council

Delegate to LU 58- Mid-America Carpenters Regional Council for four years

New Horizons Computer Learning Centers, Chicago, IL, 2015

Lean Six Sigma Black Belt Education; Lean Six Sigma Green Belt Certificate; PMP Boot Camp Exam Prep

Completed ITCDET 300 Leadership and 212 Leadership Training Programs at UBC Intl training Center

Appointed Sisters In The Brotherhood Chair for LU 58

Mid-America Carpenters Training Center, Elk Grove Village, IL:

Certified Building Analyst Professional Excavation Trained

Commercial, Industrial, and Residential Fall Protection UBC Scaffold Erector Qualification Refresher CRCC

BIM- Building Information Modeling, Suspended Scaffold Qualification & Refresher CRCC

30-Hour OSHA Construction UBC Best Practices in HealthCare Construction

UBC Aerial Lift Certified ANSI A92.6 & A92.5 AGC Superintendent Training Coursework

Professional Experience

Milhouse Construction and Engineering, Night Superintendent responsible for scheduling and running all MEP Subcontractors with the coordination of our Day Superintendent, Project Manager, Walmart Construction Manager, and on-site Walmart Project Planning Team on a $2,220,000.00 out of State Walmart #3851-248 Walmart remodel project in Lafayette, IN. I was Responsible for leading the Daily Morning Communication meetings for Project progress, tracking All sub-contractors on site each shift and accounting for daily tasks completed, workers on site and hours worked. I coordinated Change Orders from our subcontractors through our Project Manager. I developed an onsite SWPPP plan along with responsible for all required HAZ Mat, Safety Meetings, Communication, and required Manuals necessary to meet State Regulations for Jobsite office trailers. January 2024 to May 2024

BWF Construction. (Bills Welding and Fabricating) working as a metal stud framer interior systems Carpenter for 5M Tollway Project in Hoffman Estates and Metal Stair fabricator In BWF Shop as well as Punch list Carpenter on existing projects. September 2022 to October 2022

Barton Malow, Job Steward for B.A John Kypurous, LU 434 for a BEFESA Zinc recycling Plant in Chicago as a concrete Carpenter as part of a composite crew rebuilding a Kiln and running two shifts with a promise to rehire August 2022 to September 2022

W.E. O’Neil, concrete carpenter building a 5-story building in the west loop responsible for building welded frame scaffolding for yellow boys, pole shore deck system installation, stripping crew, and jobsite safety team member. July 2022 to August 2022

Walsh Concrete, working as a Job Steward for B.A. Matt Ocoln, LU 58 and Craft Leadership Safety Team Member representing Walsh Concrete and Concrete Carpenter for CHI05 Microsoft Build in Hoffman Estates, Il. December 2021 to June 2022

F. H. Paschen Concrete Carpenter working on 294 from the I-55 exit south bound to Wolf Road Bridge October 2021 to November 2021 and Carpenter on Deerpath Rd. Bridge over I-88 July 20221 to October 2021

F.H Paschen Concrete Carpenter working on the Mile Long Bridge Responsible for framing and building formwork needed to build overhangs, parapet walls, diaphragms, and bridge deck framing to include layout and installation of whalers, decking plywood, and approaches. From August 2020 to January 6, 2021

Kiewit/ Cherne New Chester Dairy Farm, Grand Marsh, Wisconsin. November 2019 to March 2020

Building four concrete digester tanks for methane gas extraction. Responsibilities include Symon Form panel fabrication, installation of twenty-seven feet by twenty-four feet panels for both sides of the pour, panel breakdown as well. Temporary Tent installation fabricated out of blankets, 20-foot 2x4s and fasteners for temporary tenting and heating. Formwork for concrete pads built as needed. November 2019 to March 2020

K. R. Miller Construction,

Journeyman Carpenter and Job Steward for BA Alex Perez LU 181, at that time, responsible for maintaining Carpenter status quote, overseeing all workers are performing and installing general carpentry, site Safety, Setting Door frames and hardware Installation tasks as necessary to complete a CPS Project with the Public Building Commission in Norridge. July 2018 to Sept 20, 2019

Williams Brothers Construction

Journeyman Carpenter responsible for using the Symon form system to assist in building the wastewater treatment plant in St. Charles Il March 2018 to July 2018

Escarpita

Journeyman Carpenter responsible for Metal stud framing, ceiling grid installation, and Mics. Carpentry work from April 12, 2018, to April 20

Turner Construction Company Chicago, IL

Journeyman Carpenter responsible for General conditions, site safety, Interior systems installation, door frame installation, door and hardware installation, July 28, 2016, to March 2017

Walsh Construction Group, Schaumburg, IL, 2015 to 2016

Journeyman Carpenter on I-90 Heavy Highway expansion project

Constructed gang forms for parapet walls, built wood forms for the installation of bridge abutments, and performed wood framing for decking of bridges and haunch in preparation for cement for road formation.

Accurately interpreted blueprints, work instructions, and project documentation.

ClayCo, Schaumburg, IL, 2015

In-house Carpenter

Completed daily scope of work necessary for setting up Skip, skip fabrication, and safety for entire jobsite

Walsh Construction Group, 2014

Journeyman Carpenter

Participated in installation of five miles of parapet wall within a five-month period for Phase One of the Hoan Bridge project in Milwaukee, Wisconsin.

Community Involvement

Hoffman Estates Annual Fishing Derby, Hosted By the Chamber of Commerce of Hoffman Estates.

Volunteer for Local 58 for Flag installation and wall setup for The Wall that Heals, Vietnam Veterans Memorial Replica & Mobile Education Center. May 24th-27th, 2024 Randall Oaks Park, West Dundee, IL

Habitat for Humanity- Northern Fox Valley Chapter, 2010 to 2012

Forewoman, MEP Coordinator, & Team Member, Elgin Women Build Project

Established complete scope of work for all MEP (Mechanical, Electrical, and Plumbing) and performed carpentry for total gut/restoration rehab project executed exclusively by female volunteers.

Governed vendor selection, material allocation, delivery timelines, cost containment, risk management & mitigation, safety compliance, and schedule modifications due to changing weather conditions.

Successfully completed 33,280 volunteer hours of supervision during highly visible project.

Chicago Women in Trades, 1995 to Present

Volunteer Instructor

Facilitate outreach program at several local community colleges, Elgin Community College, McHenry Community College, Joliet Community College as an Instructor to advocate for to women entering the Building Trades totaling 10,000 training hours

Advocate for women entering the Building Trades in Chicago and Surrounding Suburbs

Software

BIM, Microsoft Project, Microsoft Office Suite (PowerPoint, Excel, Word)

References available upon request



Contact this candidate