March 2020 to Jan 2023 Project Manager
Oran Algeria EMESA CONTRACTING / SARL ELBAYRAK Construction Roles and Responsibilities:
- Contract of realization of 557 units HIGH STANDING HOUSES Oran Algeria for the account of the ENPI (Entreprise National De Promotion Immobilière) AL Akid ORAN. Project Manager
Senior Civil Engineer
LANGUAGES
Focused Project Manager adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing manufacturing employees and keeping efficient production in accordance with quality standards. Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance. French English Arabic
PROFESSIONAL EXPERIENCE
SKILLS
involved.
Ensuring customer satisfaction.
Managing crises and conflicts.
Manage a team of professionals seniors
Organizational skills
Communication skills
Leadership skills
Ability to adapt
Apply quality and HSE guidelines
Availability and rigour
Project Management
Problem-Solving
Team building
Productivity Improvement
Contract Management
Scope Management
Team Bonding
Agile Methodology
Project scope
Staff Management
Coaching and Mentoring
Project scope analysis
Conflict Management
Processes and procedures
Construction management
Influencing skills
OBJECTIVE
CV
Chakib MEKKI
***************@*****.***
Oran ALGERIA
linkedin.com/in/chakib-mekki-65b9a823
- Contract of realization of 593 increased to 671 units HIGH STANDING HOUSES Oran Algeria for the account of the ENPI (National Company of Real estate Promotion) El Barki ORAN. Oct 2019 to March 2020 Site Manager
Béthioua, Oran, Algeria TGCTP (Terrassement Génie Civil Travaux Pétrolier) Roles and Responsibilities:
- Contract for the execution of the general earthworks for the project of an air separation unit for client AIR PRODUCTS / HELIOS
JUL 2016 to Jun 2019 QC Manager
ES-Sénia, Oran, Algeria FCC CONSTRUCCIÓN, S.A
Roles and Responsibilities:
Project : Tour de contrôle du nouvel aérodrome d’Oran The construction of the technical building and control Tower Phase 2 Oran Airport ENNA
- Compliance with quality inspections.
- Supervision of the technical works (air-conditioning, elevators, Low and high voltage work, CCTV, SCADA, fire protection...)
- Acting as the site manager.
Aug 2014 to jul 2016 QC Manager et Laboratory Director Tiaret, Algeria FCC CONSTRUCCIÓN, S.A
Roles and Responsibilities:
Project: New railway single track Relizane-Tiaret-Tissemsilt 183KM. ANESRIF. Algérie
- Management of the geotechnical and construction materials laboratory
- Establish and validate geotechnical tests (soil identification and borrow pit analysis)
- Validate the laboratory tests of construction materials - concrete aggregate, mixing water, cement and sand.
- Confirm soil inspection reports.
- CHECK Hold point inspections was done
- Approve documents construction
- Compile and prepare monthly reports for the client
- Ensure compliance with calibration dates (laboratory measuring instruments and topographic equipment...)
- Check of technical data sheets and certificates of conformity.
- Check if the QCP is in accordance with the contractual requirements and the company's quality procedures and submitting it to the client for approval
- Closing non-conformities
Oct 2010 to March 2014 QA/QC Engineer senior
CV
Chakib MEKKI
***************@*****.***
Oran ALGERIA
linkedin.com/in/chakib-mekki-65b9a823
GNL3/Z Arzew, Oran, /Algeria SNAMPROGETTI CHIYODA JOINT VENTURE. Roles and Responsibilities:
QA/QC Coordinator Mechanical Completion
Checking Mechanical Completion records such as drawings, P&ID, and QC Records Index
Establish punch list reported on inspection reports before sending mechanical completion records to customer SONATRACH
Analyze the completion data base system and assign the necessary corrections according to the applicable items and designate those not applicable.
Internal coordination between QA/QC department, other departments and (customer and subcontractor) periodic meetings, test pack verification, mechanical completion file verification, punch list update
Punch-list Coordinator
Establish punch list and ensure that they are entered into the soft system in accordance with project procedures
Coordinate with the engineering department and the construction department to take corrective actions to close punch lists and field observations
Actively participate in the coordination meetings and transmit the periodic status of the punch list.
Establish the punch list clearance form and ensure their official closure with the client. QA/QC Engineer senior - Marine Works
Supervise and control dredging operations, preparation of caisson foundations and anti- scouring.
Checking the quality of the construction materials: 2 500 000 tonnes for the earthworks of the jetty and platform for the flare, caisson foundations and anti-scouring.
Control quality of the concrete for the 2,900 acropods (4m3 & 6.3 m3) precast on site and ensure their installation in accordance with the drawings.
Supervise and control the installation of the acropods on the jetty and the flare platform.
Make an inspection (Port of Arzew, Algeria) of the caissons precast in Cartagena Spain before placing.
Checking the placing of the caissons and control of their positions according to the plans.
Check the quality of the superstructure work (slab, pipe rack supports, wall, installation of precast slabs and prestressed beams...) of all the caissons of the jetty, the platform and the dolphins: (jetty and platform 11 quadrilobed caissons (28m x 28m) and dolphin of dock 8 mono-lobed caissons (16m diameter))
Checking the quality of the superstructure work (slabs, walls) of all the caissons offshores of the breakwater (BREAKWATER of 756m length made up of 27 quadrilobed caissons)
Checking the installation of the marine equipment’s (catwalk, triple and twin mooring crocks, fenders, marine signaling equipment, bollards and access ladders, filters for the firefighting and tank cells).
Checking the quality of the concrete 20 000 m3 for the superstructure of the 46 caisons and 88 400 m3 for the precast.
Coordinating and carrying out inspections with the various subcontractors.
Establish and follow up non-conformities and field observations CV
Chakib MEKKI
***************@*****.***
Oran ALGERIA
linkedin.com/in/chakib-mekki-65b9a823
Ensure the quality inspection of the works with the client
Close the punch list with the client.
Attend periodic technical and progress meetings with subcontractors and the client. Aug- 2008 to Feb 2010 Regional Manager
Tiaret Algeria THALES France
Roles and Responsibilities:
Regional Manager Laghouat then Tiaret ensuring the execution of the works and the interface with the client's representatives, the joint-venture partner and the project subcontractors in EPC CCTV and guardhouse and HSE building) for the client RTO / SONATRACH
The sites :
Laghouat pumping stations and compressor stations: SC1 Timezert, SP4 Hassi R'Mel, Milok GZ0, SP5 Laghouat SC2 Msekka,
Tiaret pumping stations and compressor stations: Médarreg SP6, Médarreg SC3/GZ1/2/3, Nador SC4 GZ1/2 and GZ3, PRS Souggueur, and Tiaret GZ0. Nov 2007 to Jul 2008 Civil Works Supervisor
(TFT) TIN FOUYÉ TABENKORT, SPIE FORAID / TECNICAS REUNIDAS / INITEC In Amenas, Algeria
Roles and Responsibilities:
Civil works supervisor, boosting project phase II (02 turbines and compressors support 330 m3 each, support pipes rack and building) for the client JOINT VENTURE (SONATRACH TOTAL REPSOL) in (TFT) TIN FOUYÉ TABENKORT In-Amenas Algeria Oct 2006 to Apr 2008 Construction Engineer
Mocta Douz-Beni Saf Algeria TRC-EXL/RTO SONATRACH
Roles and Responsabilities :
EDV/TRC/SONATRACH Client representative for the EPC project for the construction of 122KM gas pipeline 48 ‘’ and incoming terminal (MEDIII-GZ4) phase III Mocta Douz- Beni Saf Algeria.
Review and approval of plans and engineering documents (basic study, detailed study)
Supervision of civil engineering and piping works (Opening of tracks, Excavation of trenches, cladding, welding works, repair works of protective paint, Backfilling...)
Study and validation of the work attachments (progress) and invoicing (contractors)
Presentation of weekly and monthly reports (EPC) and transmission to the projects management.
Assist the Project Manager during coordination meetings CV
Chakib MEKKI
***************@*****.***
Oran ALGERIA
linkedin.com/in/chakib-mekki-65b9a823
Feb 2006 to Aug 2006 CIVIL ENGINEER
Hassi-R’mel, Ouargla et Zina, Algeria SARPI (spa) : Société Algérienne de Réalisation de Projets Industriels client SONATRACH
Roles and Responsibilities:
Civil engineer in charge of the civil construction project for the extensions of the GR1/GR2 compressor stations phase II (03 turbo compressor fundations 220m3 each).
Supervision of the civil constructions (formwork, reinforcement and casting of 03 turbines and compressors fundations and civil infrastructure) at the compressor stations located in Hassi-R'mel, Ouargla and Zina Algeria
Feb 2005 to Sep 2005 Civil Works Supervisor
Sétif, Algeria CEPEL EXPORT ex AMEC-SPIE ENERGIE SERVICES Roles and Responsibilities:
Supervisor of the civil construction “electrical substation 60/10KV “Sétif Nord.
Inspection before casting of the foundations and civil work
Attend the coordination meetings with the project client SONELGAZ
Leading coordination meetings with subcontractors.
Assist in the inspections of external organizations such as CTC Est, LNHC as well as the animation of interface meetings.
Make up the weekly report.
Study and validate the work attachments (progress) and the invoicing of the work carried out by the subcontractors.
Sep 2002 to March 2005 Construction Engineer
Laghouat et Hassi R’Mel, Algeria TRC-EXL/RTO SONATRACH
2004 - 2005 EDV/TRC/ SONATRACH PROJECT REPRESENTATIVE at SP4 (Pumping station N 04 Hassi-R'Mel Algeria) OZ2 oil pipeline 34'' project Pumping station (Lot N 03 phase II) and project for the realisation of the shielded electrical substation 60/5.5KV.
2002 - 2004 EDV/TRC/ SONATRACH PROJECT REPRESENTATIVE at SP5 (pumping station N 05 Laghouat Algeria) OZ2 oil pipeline 34'' project (Lot N 03 phase I). Roles and Responsibilities:
Approval of the works attachments (progress) of the different contractors and interveners on site
Validate the quality inspections of the works on site
Ensure compliance with the terms of the contracts
Ensure that the work is carried out according to the plans and documents approved by the client
Coordinate with the operator to establish the various authorisations and work permits
Lead coordination meetings with contractors
Lead coordination and interface meetings with the various project partners
Establish correspondence with the contractors' representatives on site CV
Chakib MEKKI
***************@*****.***
Oran ALGERIA
linkedin.com/in/chakib-mekki-65b9a823
Make up the weekly report
Ma 2001 to Aug 2002 Project Manager
Béchar, Algeria BATENC.Oran filial de BATIMETAL
Roles and Responsibilities:
In charge of supervising the design and construction of 84 housing units in Béchar / 3rd Military Region
Ensure compliance with the terms of the client contract and subcontractor contracts
Lead the coordination meetings with the subcontractors
Lead coordination meetings with the client
Establishing the work attachments (progress) and invoicing the client
Approving the invoicing of the various subcontractors and site workers
Ensuring that the work is carried out according to the plans and documents approved by the client
Establishing correspondence with the contractors' representatives on site
prepare monthly, half-yearly and annual reports. Oct 2000 to Apr 2001 CIVIL ENGINEER
Oran, Algeria SARL IBIZA/ Brown Root Condor
Roles and Responsibilities:
Engineer and supervisor in charge of the construction works of the protection and support group (GPS) at the regional military university hospital of Oran (Ain-El- Baïda).
Supervision of formwork, reinforcement and concreting works
Attending work coordination meetings with the client
Ensuring the proper execution of the work according to the plans and documents approved by the client
Apr 2000 to Jul 2000 CIVIL ENGINEER
Port Béthioua, Oran, Algeria LEM (Laboratoire d’Etude Maritime) Roles and Responsibilities:
Civil engineer in charge of technical assistance to the client DTP (Directorate of Public Works) for the construction of three dolphins at berth M6 (LPG loading arm) in the port of Arzew-El-Djedid Oran, Algeria.
CV
Chakib MEKKI
***************@*****.***
Oran ALGERIA
linkedin.com/in/chakib-mekki-65b9a823
Oct 1998 to Nov 1999 Project Manager
Ain El Bia, Oran, Algeria EGBO/ECO (Entreprise générale de bâtiment d’Oran) Roles and Responsibilities:
In charge of the realization of 90 L.T.H SONATRACH housing units in Ain El BIA,
Assigned to the project for the construction of the Messereghine hospital for cancer patients, Oran, Algeria.
Jun 1997 to Apr 1998 Civil Works Engineer
Béthioua, Oran, Algeria E.T.P.S DEMNA
Roles and Responsibilities:
Assigned to his client Jurong Engineering Limited LTD (JEL) / Ishikawagima Harima Heavy Industries (IHI) in LPG Project- Phase II
Construction Engineer for structural and finishing works (steel and concrete building). Nov 1996 to Apr 1997 Civil Engineer
Oran, Algeria BEIS (Bureau d’Etude et d’Ingénierie et Services) Roles and Responsibilities:
In charge of the study and monitoring of the restoration of old buildings
2005 - CEPEL EXPORT Induction HSE and Electrical accreditation HOV-B0V according to standard UTE 18510
2007 - SPIE FORAID Induction HSE
2007 - 2008 TECNICAS REUNIDAS / INITEC Induction HSE
2007 – GTFT (TOTAL REPSOL SONATRACH JV) Induction HSE University of Science and Technology of Oran, Algeria, Faculty of Civil Engineer, Civil Engineer Diploma
1995
Oran, Algeria
Hayat School of Oran, Specialization of Mathematics Bachelor in Science in Mathematic
1990
0 Oran, Algeria
EDUCATION
PROFESSIONAL TRAINING
CV
Chakib MEKKI
***************@*****.***
Oran ALGERIA
linkedin.com/in/chakib-mekki-65b9a823
2009 - THALES France Induction HSE
2010-2013 - SNAMPROGETTI CHIYODA JV SAIPEM in according to company HSE policy: Site Induction, Transfer at Sea, Over Board, Defensive Driving, Confined Space, Hydro Test, Fall Protection, Commissioning Induction, Gas-IN Induction and First Aid
2012 - Microsoft Project
References available on request.
References