Post Job Free
Sign in

Audio Visual Engineer

Location:
Garland, TX
Posted:
May 16, 2025

Contact this candidate

Resume:

Jason M Saffer

+1-214-***-****

jysnsaffer@yahoo.com

Garland, TX 75044

CAREER OBJECTIVE:

Detail-oriented professional with experience in records management, Microsoft Office, and customer service. Frequently praised as hard-working by peers, I can be relied upon to help your company achieve its goals. EDUCATION:

August 2000

DeVry University, Irving, Tx

EXPERIENCE:

August 2023 -2025

Associate System Engineer

ELB

● Consult with clients and colleagues as necessary regarding audio visual requirements.

● Assess briefs provided by customers, Account Manager, or Systems Engineers and identify options for potential solutions.

● Assist with project design and/or build costing and project bidding activities.

● Participate in the development of logical and innovative AV solutions to complex problems, ensuring that AV system designs meet customer business requirements.

● Create, edit, and track Bill of Materials for pre, and post-sales support and for product release/ordering.

● Create labor estimates for pre-sales support.

● Assist in the development of detailed design documentation once a contract for a system has been awarded.

● Assist Project Managers, where necessary, with planning the installation of systems

● ESports design, Install and commission

● Verify installation completion and completeness.

● Some equipment installation and rack build as required.

● Commission Audio Visual systems in the shop and in the field as required. System commissioning may include, but is not limited to: DSP configuration and audio system tuning; Video display and processor configuration and calibration; Loading and testing completed control system code; Testing and troubleshooting the system through satisfactory completion June 2022 – July 2023

Operation Manager Project Manager

Superior Communication Services

● Recommended improvements to established business processes, enabling better project turnaround time frames.

● Organized and led kickoff and status meetings to communicate project expectations prior to project execution.

● Led meetings to detail project milestones, brainstorm ideas and determine appropriate

● techniques to manage tasks.

● Managed inter-project dependencies and risks to create successful outcomes.

● Currently Manganin Lifetime Fitness Projects. For GTX Mack over to new construction installs. August 2021 – June 2022

Audio Visual Specialist

Dallas Fort Worth International, Dallas, Fort Worth Metroplex, Fort Worth, TX

● Maintain the Conference room to their full ability.

● Replace and order parts for rooms.

● Design and Engineer new Show for new conference rooms and huddle rooms

● Work with subcontractors and venders for proper install and OSHA and ADA compliance

● Once a month run and maintain Audio Visual for Board Officials.

● Designed layouts of audio and video equipment and performed upgrades and maintenance. November 2020 - August 2021

Sales Engineer

Texas Fire and Sound, Dallas, Fort Worth, TX

● Would do design and bid work for sales teams.

● Call and get pricing for parts and labor.

● Overlook design and help support some of the jobs that have been installed. December 2019 - April 2020

Install Support Specialist

Extron, Irving, TX

● I worked as a ISS for K-12 and Higher educations as we fund solutions using the

● Pole-vault systems and the Wall Vault systems.

● Would help in Design and Engineering of other needs such as Auditoriums and Exhibit Halls and Lecture Halls

● Referred major hardware and software problems and defective products to vendors and technicians for service.

● Developed training materials and procedures, and trained users in proper use of hardware and software. July 2018 - November 2019

Sr Engineer /Audio Visual

American Airlines, US 1 year 6 months Dallas/Fort Worth Area

● Design and tested Conference rooms for new HeadQuarters for American Airlines

● All so troubleshoots and fix Conference rooms in existing Buildings sites all over the U.S

● Create strategy and roadmap for Audio Visual portfolio.

● Prioritize break/fix activates Remove roadblocks.

● Lead, train, and mentor team member

● Maintain system reliability and availability.

● Work closely with other groups within Enterprise Technology Services to adapt best practices. July 2017 - July 2018

Audio Visual Project Manager

Electra Link, Inc, US 1 year 6 months Dallas/Fort Worth Area

● Conferenced with electricians and general contractors as well as vendors to ensure efficient. and expedient schedule was maintained, and project was completed as quickly as possible

● Supervised and maintained selection of equipment and manpower to ensure projects were completed on time. July 2016 - May 2017

Project Specialist

ComNet Communications, LLC, Fort Worth, TX

● Closed out jobs and trained clients on proper use of the system and worked on training marital. November 2015 - November 2016

Lead Installer

Solutionz Conferencing, Inc, Fort Worth, TX

June 2004 - June 20015

Lead Installer Level 4 AVI-SPL, US

Install Tech

● Led the installation of Poloycom video conferencing units in Hospitals.

● Directed a large crew in the building of conference suits.

● Install, 2015 11 years 1 month.

● Compiling prints and cable pull sheets before each job.

● Verifying job scope and proper equipment ordered/received on time.

● Inspecting the job site to verify it ready for installations and that project would meet the client's needs.

● Met with client and General Contractors to assess progress on the project and address any issues that arose.

● Upon completion of the installation, I was responsible for loading code and testing equipment for any final issues

● Trained clients on proper usage of the system upon successful installation

● Experience with terminations, including RJ45, DB9, HD15, RCA, BNC, XLR and other compression, crimp or solder on terminations.

● Fiber termination experience the customer on using the system.

● Strong understanding of Ethernet (LAN) technologies

● Able to read drawings including block diagrams, schematics connection diagrams.

● Rack building and associated wire management

ADDITIONAL SKILLS:

● Able to fully commission a system upon completion and comfortable with training

● Scrum Methodology

● Materials Take-Offs

● Managing Revenue Projections

● Punch Lists

● Timely Project Completion

● Workforce Training

● Technical Presentations

Affiliations

CTS since 2008

OSHA 30 since 2009

Crestron since 2008

AMX since 2008

Extron since 2008

Polycom since 2008

Crestron DM 2018

Crestron Audio 2018

Biamp 2018



Contact this candidate