Post Job Free
Sign in

Electrical Engineer Power Plants

Location:
Lahore, Punjab, Pakistan
Salary:
SR25000/-
Posted:
May 14, 2025

Contact this candidate

Resume:

AKHLAQ AHMED RATHORE

(ELECTRICAL ENGINEER REGISTERED IN SAUDI ENGINEERING COUNCEL)

CELL # +923*********

PERSONAL PROFILE

“A proactive, enthusiastic and hard-working Electrical graduate with the ability to work well both independently and in a team. Has boldness and vision to initiate new ideas and implement innovative approaches. Excellent communication and presentation skills underpinned by an enthusiastic and proactive approach”.

ACADEMICS

Degree

Major Subjects

Passing Year

Division / Grade

B-Tech (Honors.)

Electrical

2003

1st

B-Tech (Pass)

Electrical

2001

1st

Diploma of Associate Engineer

Electrical

1981

1st

Secondary School Certificate

Science

1977

2nd

EXPERIENCE

Company

Position

Experience

PETROFIC SAUDIARABIA LTD

ELECTRICAL COMMISSIONING ENGINEER

UP TILL NOW

HITACHI LTD

ELECTRICAL ENGINEER (SITE SUPERVISION)

2 YEARS

JGC GULF INTERNATIONAL CO. LTD.

PROJECT ENGINEER

1YEAR

SAUDI BINLADIN GROUP

Sr. ELECTRICAL ENGINEER

5.5YEAR

SAUDI CONSULTING SERVECES

ELECTRICAL ENGINEER

02YEARS

ALFANAR CONSTRUCTION CO.

SITE ELECTRICAL ENGINEER

01YEAR

Elpaso Technology (SABA POWER CO.)

ELECTRICAL ENGINEER

09YEARS

SCECO SAUDIA (SAUDI ELECTRIC COMPANY

ELECTRICAL SUPERVISOR

1OYEARS

WAPDA(GTPS SHAHDARA (PAKISTAN)

ELECTRICAL SUPPERVISOR

07 YEARS

KEY SKILLS

Computer literacy

1.Working knowledge of Microsoft Office

2.Working knowledge on PCM (Primavera Contract Management)

3.Working knowledge on Oracle system

4.Confident in the application of the inter

5.Proficient user of e-mail.

Excellent time management skills

1.Getting projects finished on time.

2.Able to meet deadlines.

Ability to use own initiative

1.A strong aptitude for using initiative

2.Can work independently

3.Can use own initiative in different circumstances

TECHNICAL COURSES & TRAINING ATTENDED

1.Successfully completed one-day workshop in passion for excellence from KZR.

2.Successfully completed 3 months Training of GIS Substation installation, testing, Operation, Maintenance from WAPDA Engineering Academy Faisalabad

3.Management Quality Assurance Program form Saudi Binladen Group.

4.Two week training of protection relays calibration, Testing from Siemens, Pakistan.

5.Six months basic operation & maintenance training of A.E.G. KANIS, FIAT, WESTINGHOUSE, for 200MW GAS TURBINE POWER STATION FAISALABAD

6.Six month advance operation training of A.E.G.KANIS, FIAT, and Westinghouse from 200MW GAS TURBINE POWER STATION FAISALABAD.

7.Successfully completed 15 days Training in Grid Station installation, Operation, Maintenance from Wapda Engineering Academy Faisalabad.

8.Safety training about First Aid and Fire Fighting from Haseen Habib trading Company.

9.Training on transformers from SIEMENS Pakistan.

10.Circuit Breaker operation &maintenance ABB, SHGC-3/800ASF6 GCB from ABB.

11.Safety training about first aid and firefighting from Saudi Binladen Group.

12.Safety training about lock out, tag out & FIRE Fighting From by HITACHI Trainer.

SITE TRAININGS

(Majored in: Machinery & equipment Installation, Trouble Shooting, Operation & Maintenance.)

1.Installation,Operation & Maintenance about Boiler, Steam Turbine, Demine Plant,Plant auxiliaries, Cooling Tower, and water chemistry at SABA Power Plant in ELPASO Corporation from Vender of B&W (BEBCOCK&WILCOX).

2.Operation & Maintenance of Diesel Engines (NIGATA, CATTERPILLER, Black STONE DALEVAL, NOHAB) from Venders in Saudi Arabia

3.Installation, Operation and Maintenance of Demon Plant by vendor of EKODINE.

CAREER HISTORY

Employer: PETROFIC SAUDI ARBIA LTD

Joining Date: JAN’ 2019

Leaving Date: UP TILL NOW

Designation: ELECTRICAL COMMISSIONING ENGINEER

ARAMCO PR0JECT: JIZAN REFINARY TERMINAL PROJECT (JRTP)

(Tank farmsFacilities EPC- 4)

This project consists of 8 numbers of Substations, PIB,S 13.8/4.16/.480 KV Substations and and pumping stations, all other equipment’s related with RefineryAND other buildings..

Duties & Responsibilities as ELECTRICAL COMMISSIONING ENGINEER

Supervision of commissioning activities related to following equipment:

Commissioning of 13.8KV/480V, 4.16KV/480V/.220V

- pre-commissioning and commissioning of Switchgears of 13.8/4.16/.480

- pre-commissioning and commissioning of transformers and 13.8KV/480V,13.8kv/4.16kv transformers of different capacities.

-Pre-commissioning & commissioning of MV & LV Switchgears & Control gears (MCCs) & Protection panels.

-pre-commissioning and commissioning of MV & LV Switchgears & Control gears (MCCs) & Protection panels

-Pre-commissioning & Commissioning of motors,Transformers, switch gears MCC,s,ATS, etc. PSA Panels.

-Verify the all cables continuities, loop check and function check.

-Test the motor IR,Winding resistance and PI before solo run test.

-Starting the LV,MV motors for solo run and check the vibration, temperature of bearing and winding,, current and voltage

-Commissioned the LV & MV motors on load.

- Pre-commissioning & Commissioning of Power Transformers dry type transformers, and control panels (testing of auxilieries breakers and control circuits..

-Pre-commissioning and commissioning of Battery Chargers & UPS and Battery banks of substations & control rooms.

-Testing of incomers breakers and feeders breakers of MV & LV Switchgears.

-Testing of MCC,s Circuit Breakers incomers and feeders.

-Testing of relays of MV &LV switchgears

-Testing of main circuit breaker and outgoing circuit breakers of Lighting panels and Power panels(Check the contact resistance, IR, opening closing timing test of breakers)

-Pre-commissioning and commissioning of security lighting system &other equipment.

-Pre-commissioning and commissioning of normal lighting circuits and emergency lighting circuits & other equipment.

CAREER HISTORY

Employer: HITACHI LTD

Joining Date: FEB’ 2017

Leaving Date: UP TILL NOW

Designation: ELECTRICAL ENGINEER (SUPERVISION)

ARAMCO PR0JECT: JIZAN REFINARY UTILITIES PROJECT (JRUP –EPC-13)

This project consists of 01 Nos of GIS 132KV/132KV, Substations, 4Nos 132KV/13.8KV Substations and 8Nos 13.8KV/480V, 4.6KV/480V/.220V, Substations, and pumping stations, boilers and all other equipment’s related with Refinery.

Duties & Responsibilities as ELECTRICAL ENGINEER (SUPERVISION)

Supervision of construction activities related to following equipment:

Installation of 110KV GIS (Gas Insulated Switchgear). 132KV/13.8KV 13.8KV/480V, 4.6KV/480V/.220V

-Installation & pre-commissioning and commissioning of 110KV GIS (Gas Insulated Switchgear

-Installation, pre-commissioning and commissioning of 110/13.8kV, 30/40 MVA transformers and 13.8KV/480V,13.8kv/4.6kv transformers.

-Installation of MV & LV Switchgears & Control gears (MCCs) & Protection panels.

-pre-commissioning and commissioning of MV & LV Switchgears & Control gears (MCCs) & Protection panels

-Pre-commissioning & Commissioning of motors,transformers, switch gears MCC,s,ATS, etc. PSA Pannels.

-Verify the all cables contineuties,

-Starting the motors for solo run

-Installation of DC Chargers & UPS and Battery banks of substations & control rooms.

-Installation of Cable Buses, Cable trays and power & control cables.

-Installation of security lighting system & equipment.

-Installation of Fire Alarm system.

-Installation of Cathodic Protection System.

-Installation of MV & LV motors and packages equipment.

-Installation of MV & LV, instrument cable trays.

-Installation of lighting &power panels.

-Installation of normal lighting and emergency lighting.

-Installation of RSC & EMT Conduits.

-Pulling of power, control, & ground cables of different sizes.

-Installation, testing commissioning of EDG SET.

-Testing of cables, Transformers and all others electrical equipments (Generator,Motors, Switchgears etc..

-Testing of protection relays & panels

CAREER HISTORY

Employer: JGC GULF INTERNATIONAL

Joining Date: MARCH 2016

Leaving Date: JAN 2017

Designation: PROJECT ENGINEER

ARAMCO PR0JECT: Rehabilitation of Yanbu South Terminal (Onshore & Offshore)

This project consists of GIS 110KV/13.8KV, and six Substations 13.8KV/480V, 4.6KV/480V/.220V, and pumping stations

Duties & Responsibilities as “Project Engineer

- Preparing, scheduling, coordinating and monitoring the assigned engineering projects

- Interacting daily with the clients to interpret their needs and requirements and representing them in the field.

-Cooperate and communicate effectively with project manager and other project participants to provide assistance and technical support.

-Monitoring compliance to applicable codes, practices, QA/QC policies, performance standards and specifications

-Perform overall quality control of the work ( schedule, plans, personnel’s performance) and report regularly on project status

-Assign responsibilities and mentor project team

Supervision of construction activities related to following equipment:

-Installation of 110KV Gantry Tower & GIS (Gas Insulated Switchgear) .

-Installation & pre-commissioning and commissioning of 110KV GIS (Gas Insulated Switchgear

-Installation, pre-commissioning and commissioning of 110/13.8kV, 30/40 MVA transformers and 13.8KV/480V transformers.

-Installation of MV & LV Switchgears & Control gears (MCCs) & Protection panels.

-pre-commissioning and commissioning of MV & LV Switchgears & Control gears (MCCs) & Protection panels

-Installation of DC Chargers & UPS and Battery banks of substations & control rooms.

-Installation of Cable Buses, Cable trays and power & control cables.

-Installation of security lighting system & equipment.

-Installation of Fire Alarm system.

-Installation of Cathodic Protection System.

-Installation of MV & LV motors and packages equipment.

-Installation of lighting &power panels.

-Installation of normal lighting and emergency lighting.

-Installation of RSC & EMT Conduits.

-Pulling of power, control, & ground cables of different sizes.

-Installation, testing commissioning of EDG SET.

-Testing of cables, Transformers and all others electrical equipments.

-Testing of protection relays & panels

CAREER HISTORY

Employer: SAUDI BINLADIN GROUP

Joining Date: JAN 2011

Leaving Date: March’2016

Designation: SENIOR ELECTRICAL ENGINEER

PR0JECT: KING ABDULLAH FINANCIAL DISTRICT PROJECT (KAFD)

Duties & Responsibilities as E/M MANAGER at KAFD PROJECT

Daily progress meeting with senior engineers and site engineers

Weekly progress meeting with project Manager and E/M Manager and discussing and solving the site Issues regarding technical issues, materials and manpower.

Daily site round to check the progress and manpower work

Weekly meeting with consultant, and client for progress and site problems solving

Daily meeting with technical manager for drawing preparation as per site requirements

Preparation the daily progress report, weekly progress report and monthly progress report

Coordinate with sub-contractors for material and site progress & Site problems solution

Arrangement of manpower as per site requirements

Meetings with technical manager and consultant for solving the site issues

Coordinate with all suppliers for materials & sub-contractors for progress and problem solving of Different issues.

Duties & Responsibilities in Construction Department as “Senior Electrical Engineer”

To Manage the site activities at KAFD Project.

To prepare the Drawings from technical department as per site requirements.

Collect all drawings from Technical department for study and work

Hand over the drawings to site engineers & supervisors

Installation of cable trays, Electrical conduits and boxes in control buildings

Put the earthling as per drawing and site condition.

To fix the Electrical conduits and boxes for power and low current systems.

To fix cable tray and to lay the cables according to drawing.

To control the man power.

Prepare the material take off of power systems and low current systems.

Prepare the MSR for site materials and tools.

Installation & commissioning of Emergency generators.

Prepare the daily progress report and send to seniors.

Attend the daily meetings with parcel Manager.

Coordinate with technical department to solve the site problems.

Attend the weekly meetings with E/M Manager.

Prepare the daily attendance of subordinates.

Coordinate with store officer and site administrator.

pre-commissioning and commissioning of MV & LV Switchgears & Control gears (MCCs) & Protection panels

Installation of MV Switchgears (13.8 KV) (ATS Panels, Incoming feeders & Outgoing feeders.

pre-commissioning and commissioning MV Switchgears (13.8 KV) (ATS Panels, Incoming feeders & Outgoing feeders

Installation of M.V. routing (from the outgoing feeders of Main switchgears to ATS Panels to all

Buildings of project and Pulling M.V. Cables (8.7/15 KV) in the Utility tunnel.

Installation of Distribution Transformers (13.8 KV / 4.16 KV) and (13.8 KV / 0.4 KV).

Installation of Low voltage routing for all equipment and Pulling L.V. Cables (0.6/1 KV) for low voltage

Systems (Air cooled chillers, cooling towers, water pumps, MCC and services panels).

Installation of electrical low voltage and low current systems (Lighting, Power, fire alarm & earthing

System etc.).

Installation of Service Panels (Lighting, Power etc.

Installation of Motor control centers (MCC) for Water Pumps ad AHUs.

Attendance Testing of MV SWG Panels and transformers.

Preparing Take off lists of Materials of all electrical systems

HI pat test of MV cables(185,300mm2

Duties& Responsibilities in QA/QC DEPARTMENT

PR0JECT: KING ABDULLAH FINANCIAL DISTRICT PROJECT (KAFD)

This project is consist with Power Plant, Sub Stations and more than 40 PARCELS (High rise Buildings).

Prepare the daily IR,S in oracle system and submitted to consultant office for next day inspection.

Prepare the weekly and monthly report of quality assurance and quality control.

Inspection & Testing of MV switchgears, Transformers, MCC PCC.,

Inspection &all tests including load testing of Generators.

Installation of cable trays, Electrical conduits and boxes in Buildings of Tower(PARCELS)

Inspection of fixing the AC &DC distribution panels and lighting panels.

Coordinate with all discipline like site electrical, mechanical and civil engineers and managers.

Coordinate with store officer for inspection the electrical materials.

Inspection of electrical material and factory testing of electrical materials.

Factory testing of all types of electrical Equipments

Managed the site activities at KAFD PROJECT.

Inspection of fix cable tray and to lay the cables according to drawing.

Inspection of installation of low current systems (Fire alarm, Public address, CCTV, Security systems, BMS system, Structural cabling system).

Testing of all panels and SF-6 Circuit Breakers.

Inspection of installation of medium voltage supports and conduits.

Testing the auxiliary relays, aux circuit breakers, and protection with Schneider testing team.

Testing of motors, generators transformers & all electrical equipments.

Testing of GT, S MATERIAL with consulting engineers.

Inspected the all installation activities of building electrification, power systems (power, lighting, &cable routings).

Inspection & Installation of MV Switchgears (13.8 KV) (ATS Panels, Incoming feeders & Outgoing feeders.

Inspection & Installation of M.V. routing (from the outgoing feeders of Main switchgears to ATS Panels to All buildings of project and Pulling M.V. Cables (8.7/15 KV) in the Utility tunnel.

Inspection & Installation of Distribution Transformers (13.8 KV / 4.16 KV) and (13.8 KV / 0.4 KV).

Inspection & Installation of Low voltage routing for all equipment and Pulling L.V. Cables (0.6/1 KV) for low voltage systems (Air cooled chillers, cooling towers, water pumps, MCC and services panels).

Inspection &Installation of electrical low voltage and low current systems (Lighting, Power, fire alarm & Earthing system…etc).

Inspection & Installation of Service Panels (Lighting, Power ... etc.

Inspection & Installation of Motor control centers (MCC ) for Water Pumps ad AHUs.

Inspection & Attendance Testing of MV SWG Panels and transformers.

Preparing Take off lists of Materials of all electrical systems

Inspection of high voltage test of MV cables(185,300mm2)

Inspected the all installation activities of building low current systems.

Inspected the all installation activities of building VAV system.

Prepare the MIR for material.

Coordinate with testing engineers, contractors & manufactures.

Inspection the installation of all type of external work i.e. Duct Bank road lightings &,buried cables for low voltage and high mast.

Closed the SON,s and NCR,s after rectifying the work s per consultant requirements

Review the all shop drawings related to electrical power systems and low current systems.

Employer: SAUDI CONSULTING SERVICES

Joining Date: AUG2009

Leaving Date: JAN2011

Designation: ELECTRICAL ENGINEER

PR0JECT: KING SAUD UNIVERSITY PROJECT (GIRLS CAMPUS)

This project is consisting with Power Plant, Sub Stations and more than 50 No. of buildings.

Inspection & Testing of MV switchgears, Transformers, MCC PCC.,

Inspection &all tests including load testing of Generators.

Inspection of fixing the AC &DC distribution panels and lighting panels.

Installation & Testing of MV switchgears, Transformers, MCC PCC.,

TO manage the site activities at KSU PROJECT.( GIRLS CAMPUS )

Inspection of fix cable tray and to lay the cables according to drawing.

Inspection of installation of fire alarm, Public address, CCTV, Security systems

To fix the emergency switchgear with coordination of Schneider team.

Testing the all panels and SF-6 Circuit Breakers.

Inspection of installation of medium voltage supports and conduits.

Testing the auxiliary relays, aux circuit breakers, and protection with Schneider testing team.

Fitting the generator, transformers, and auxiliaries related to Power plants.

Testing of motors, generators transformers & all electrical equipment’s.

Prepare the daily progress report and send to seniors.

Testing of GT,S MATERIAL with consulting engineers.

Inspected the all installation activities of building electrification, power systems.

Inspected the all installation activities of building low current systems.

Inspected the all installation activities of building VAV system.

Inspected the all types of materials

Coordinate with testing engineers, contractors & manufactures.

Inspection the installation of all type of external work i.e. Duct Bank road lightings, buried cables for low voltage and high mast.

Installation of cable trays, Electrical conduits and boxes in control buildings

Review the all shop drawing related electrical power and lighting system.

Employer: ALFANAR CONSTRUTION CO.

Joining Date: AUG 2008

Leaving Date: AUG2009

Designation: SITE ENGINEER ELECTRICAL

PR0JECTS:

1-SHAROORAH POWER PROJECT (GAS TURBINE POWER PLANT SEC.)

2-ROBIGH PROJECT (380KV G I S SUB STATION PROJECT)

Duties & Responsibilities:

To manage the site activities at SHAROORAH POWER Project

Collect all drawings from site manager and project Eng. for study and work

Installation, Inspection & Testing, commissioning of MV switchgears, Transformers, MCC PCC.,

Installation, Inspection & all tests including load testing of Generators panels and GT,s

Installation, Inspection & all tests including load testing of P F panel

Installation, Inspection of fixing the AC &DC distribution panels and lighting panels.

Installation, & Testing of MV switchgears, Transformers, MCC PCC

Installation of DCS panels its Inspection & testing

Commissioned 132kv switchyard and tested & commissioned protection relay of generator and main transformer&132kv switch yard and auxiliaries transformers

Erected and commissioned G. E.TURBINES at Sharoorah Power Plant

Transformer,13.8kv \ .4kv Auxiliary Transformer

Hand over the drawings to foremen, & supervisors

Installation of cable trays, Electrical conduits and boxes in control buildings

Put the earthling as per drawing and site condition.

To fix the protection panels, SCADA telecommunication panels.

To fix the G E control panels and protection panels and synchronizing panel

To fix the teleportation panels. AT Jeddah North & Rabigh Switching Station

To fix the AC &DC distribution panels and lighting panels.

TO manage the site activities at ROBIGH PROJECT 380KV GIS Substation.

To fix cable tray and to lay the cables according to drawing.

To fix the GIS System with coordination of ABB.

Testing the all panels and SF-6 Circuit Breakers.

Pulling the Vacuum, gas filling in GIS System.

Testing, pre-commissioning & commissioning of GIS System.

Testing the auxiliary relays,aux circuit breakers,and protection

Fitting the generator, transformers, and auxiliaries related to SUB STATION and Power plants.

Testing of motors, generators transformers & all electrical equipment’s.

Prepare the daily progress report and send to seniors.

Testing of GT,S MATERIAL with consulting engineers.

Prepare the daily attendance of subordinates.

Prepare the MIR for material.

Coordinate with store officer and site administrator.

Coordinate with testing engineers, contractors,& consultants.

Coordinate with QA\QC Engineer, Safety Engineer

Employer: ELPASO TECHNOLOGY

Joining Date: Dec 1998

Leaving Date: AUG 2008

Designation: Different Positions

Duties & Responsibilities:

Installation, Inspection & Testing of MV switchgears, Generator, Transformers, MCC PCC, DCS SYSTEM.

Installation of all auxiliaries of, Steam Turbines and generators,main boiler, auxiliary boiler condensate pumps, Feed water pumps fuel forwarding pumps, Lube oil pumps CW pumps, air compressors Burner control panel, BMS Panels etc.

Installation, Inspection & all tests including load testing of Generators panels and GT,s

Installation, Inspection & all tests including load testing of P F panel, AC &DC distribution panels and lighting panels.

Installation & Testing of MV switchgears, Transformers, MCC PCC, DCS panels its Inspection & testing.

Commissioned 132kv switchyard and tested & commissioned protection relay of generator and motors,Transformer &132KV switch yard and auxiliaries transformers.

Erected and commissioned G. E.TURBINES at Saba Power Plant

Transformer,13.8kv \ .4kv Auxiliary Transformer

Installation of cable trays, Electrical conduits and boxes in control buildings

To lead Electrical operation & Maintenance Activities including preventive and corrective Maintenance nd startup & shut down activities of 134MW Steam Turbine, 410T/Hrs Main BOILER, 22 TON/HRS, AUXILIARY BOILER, DEMIN PLANT & AUXILIERIES of POWER PLANT, 132KV Switch Yard (GRID STATION)

To lead construction staff and assist in deputed work.

Planning, Tracking Erection of spares/Company safety standards.

Plant Annual outage Maintenance planning, coordination planning and coordination with vendors

Pre-commissioned & commissioned 132 kV switchyard, tested &commissioned protection relays of 132kv lines (feeders), transformer, 132kv switchyard breakers Current Transformers & Potential Transformers and panels.

Commissioned & tested switchgear of 6.6 kv and MCC,s and 170MVA HYUNDAI transformer.

Coordinated with TOSHIBA in major overhauling of 134 MW steam turbine and generator in annual shutdown.

Coordinated with DOBLE Engineers for Generator, Auxiliary & Power Transformers Testing in annual shut down.

Coordinated with KEMA in doing the unit performance & NEO testing.

Tested the relays of ABB ALSTHOM, GEC ALSTHOM KCGG120/130/140, LGPG-111, GE,S MPR369/469.

Siemens substation relays, IQ data DP 4000,IO data 2000,line metering relays tested & commissioned.

TIMING testing of circuit breaker 132kv SF6, 6.6KV VACUME BREAKER, GCB.

Start up the auxiliary boiler with its auxiliaries for heating, heat tracing of RFO Tanks, lines. Pumps etc.

Planning the shutdown of the plant as per annual schedule

To lead operation staff and assist in startup and shut down of the unit as per WAPDA demand and for

Maintenance. Activities.

Planning, Tracking maintenance of spares/Company safety standards.

Plant Annual outage Maintenance planning, coordination planning and coordination with vendors

Testing& commissioning of all auxiliaries of steam power plant at SABA POWER PLANT.

Employer: SCECO (SAUDI CONSOLIDATED ELETRIC COMPANY

Joining Date: Jan 1990

Leaving Date: Dec 1998

Designation: Electrical supervisor

Duties & Responsibilities:

To train junior staff at Turabah DIESEL POWER PLANT.

To trouble shoot electrical problem of Diesel power plant

To trouble shoot electrical problem of all types of unit

To trouble shoot electrical problem of generator sets

To prepare testing reports to seniors.

To plan the erection work daily

Trouble shooting of circuit breakers, motors& switchgears

Erection, commissioning, testing activities performed at Turabah power plant

To start the diesel generator sets as per load demand

..

Employer: Wapda (Water and Power Development Authority

Joining Date: Sep 1982

Leaving Date: Jun 1990

Designation: ELECTRICAL SUPPERVISOR

Duties & Responsibilities:

To train junior staff at 85 MW GAS TURBINE POWER STATION.

Erection,testing,& commissioning of power plant auxiliaries like circuit breakers motors,transformers, generators, switch gears, MCC,s and control panels.

Performed the corrective maintenance, weekly maintenance.

To trouble shoot electrical problem of Gas Turbine power station

To start and stop the Gas Turbine Units as per NPCC demand

To coordinate with operation & Mechanical staff of electrical problems of generator and turbine

To calculate the fuel oil, fuel gas, total generation, and auxiliary consumption.

To record the hourly parameters of generators & Turbines on log sheet.

To record the faults, indications in any abnormal condition of turbine, generator and any auxiliary

To make progress report.

To make the summery of Fuel consumption, Generated KWH, & Auxiliary consumption kwh.

PERSONAL INFORMATION

Name: Akhlaq Ahmad Rathore

Father’s Name: Nazeer Ahmad

Date of Birth: 02-March-1962

Marital Status: Married

Permanent Address: 10-A, Rathore House, Nazi Street # 37,Jamil town Sabza zar, Lahore.

Nationality: Pakistani

Mobile # KSA: +966*********,+966*********

Mobile Pakistan: +923**-*******

E-mail: ******************@*****.***,******.*******@*****.***

IQAMA: Transferable



Contact this candidate