Post Job Free
Sign in

Mechanical Supervisor Plant Equipment

Location:
Dubai, United Arab Emirates
Posted:
May 12, 2025

Contact this candidate

Resume:

Jawad Ghani

Dubai – UAE

Mobile No: +971-*********

E-mail: ************@*****.***,

Experience

Total Years of Experience: 20 years

Salt Valley Contracting LLC – Dubai UAE

Duration 15 September 2023 – Till Now

Worked as an interior construction inspection

Best way cement limited. (Formerly Lafarge Pakistan Cement) Mechanical Inspector.

Duration: July 23, 2006, to 09 September 2023

Responsibilities:

Carry out the scheduled inspection of all plant equipment and initiate requests based on inspection results. In case of anomaly, perform first analysis and define priorities for each action. Monitor and co-ordinate condition predictors, for all critical equipment through specific inspections.

Inspection (specific & first level) of Packers, Bucket Elevators, screw conveyors. Internal inspection of the Cement Mill( Ball Mill UMS 5.4*14m ( specific & first level) Inspection of Step liners, Intermediate diaphragm, Head liners, Centre screen, out let head liner, spray nozzle etc.

First level inspection of the rotating and stationery equipments. Internal Inspection of the vertical Raw mill ATOX-50, And vertical coal Mill ATOX-25, (specific & first level)

First level inspection of the Rotary kiln5*80m, monitoring its bearing temperatures, tire position, tire migration.

Inspection of grate cooler 1484, its CFG, RFT, CIS (MFR), and flexible connection. Inspection of ESP its rapping mechanism, chain sage etc. Inspection of Aumund conveyor.

Inspection of bag filters.

Specific inspection of Pfister.

Inspection of Sand dryer And Tile Bond

Vibration measurements with Vibro pin

Thermography/stroboscope reporting (IP65)

DPT/NDT/MPT for cracks detection.

Follow-up and update preventive maintenance schedule. Ensure rectification of any fault observed during inspection of the area. Validate and update equipment specification files and history sheets. Share with production/process patrollers the outcome of inspection. Keep in file the information related to the execution of inspection (first level and specific). In order to create new job plans:

Use and update existing job plans library.

Evaluate and improve the preventive maintenance job plans from supplier’s recommendation. Improve/update existing job plans based on experience and equipment history. Contribute to the RCA (Root Cause Analysis), recommending corrective actions. Participate to the Reliability committee.

Propose economic ways to extend the life of plant equipment. NATIONAL CEMENT COMPANY (PSC) Dubai

Technician Mechanical

Duration: January 04, 2000 to June 23, 2006.

Responsibilities:

Shutdown inspection of Cement Mills, Packers, Kiln and Cooler areas. Replacement of Head liner, shell liner, Intermediate diaphragm with centre screen. Maintenance and inspection of Delta screw compressors, atlas Cap co. Inspection of cement silo.

Over haling of Symetro gear box.

Descon Engineering Ltd, for Parco Mid Country Oil Refinery Muzafar-Ghar Designation: Technician

Duration: Sep, 17, 1998 to Feb, 19, 1999

Responsibilities:

Erection of pipe lines and structuring of other equipments. DESCON Engineering Ltd, for F.J.F.C Bin Qasim Karachi. Designation: Technician

Duration: Feb, 15, 1998 to July, 08, 1998

Responsibilities:

Product, Pulley, Chains, belt Idler and all required for fabrications. Erection, Commissioning of packing and other equipments. DESCON Engineering, For Fauji Cement Plant. Jang Bather. Designation: Technician

Duration: Oct, 20, 1996 to Dec, 19, 1997

Responsibilities:

Erection of screw conveyors

Erection of bucket elevators.

Erections of Belt Conveyors, cement mill and packers Plant Commissioning.

SIEMENSE Pakistan, for Cement Plant NWFP. Nizam-pur. Designation: Technician

Duration: Oct, 18, 1995 to Aug, 18, 1996

Responsibilities:

Installed new cable tray.

Installed new panels.

Education

Apprenticeship 3 Years (1994)

ICI Soda Ash ltd. Pakistan

D.com (1991)

Govt. Commerce College

Metric (1989)

Govt. High School

Achievements

Replacement of Slide Shoe bearings of Cement Mills. MAAG gear overhauling and bevel stage replacement. Comprehensive inspection of kiln.

Replacement of new installed packers.

Temperature measurements with different techniques Ultrasound and leak detection techniques

Stroboscope Inspections

Preventive Maintenance Program Implementation ( Creation of Master plans, Job Plans, routes, calendar)

Creation of Work requests, Work orders in ERP (Enterprise Resource Planning) CECIL certification (Plant Process)

Creation & Implementation of Risk Assessment (JHRA, HECP) according to HSE (Pakcem) Committed for safely completion of all inspection job, member of energy isolation (LOTOTO),confine space, work at height standard, conduct VFL, risk assessment. Certifications/ Trainings

Maintenance Inspection Building Foundation training at Plant. Training course Mechanical maintenance in Pakistan cement Ltd from July 19, to 15 August 2006, held by FLSMIDTH.

Feb24, 2009 Technical presentation on rolling bearings in Pakistan Cement Ltd held by FAG. Safety trainings at Lafarge Pakistan Plant via E-learning sessions from LO and plant safety management.(Especially Risk management, Confined Space, WAH, Energy Isolation. etc) First AID Training held by Govt. of Pakistan Disasters relief and RESCUE 1122 from Pakistan.(Feb26,2009)

Heart Saver First Aid CPR AED (American Heart Association) training held by Agha khan University Hospital.

(Award) Star of the month in Recognition of extraordinary efforts and contribution towards the achievement of organization goals.

Skills

MS Word,

MS Excel

ERP & Oracle Discoverer

SAP

UAE Driving License



Contact this candidate