[*]
K. VINOTH KANNAN **************@*****.***
Sr.QUANTITY SURVEYOR Mob: +968-********, +91-892*******
OBJECTIVE:
To obtain a challenging and responsible positioning a progressive organization that provides me an opportunity to utilize my skills and education enthusiastically for achieving the objectives of an organization.
PROFESSIONAL SYNOPSIS:
Qualification : Bachelor Degree in Mechanical Engineering. Total Experience : 16 years (13 years Oil & Gas Experience) Current Position : Senior Quantity Surveyor – Mechanical. Present Company : Special Technical Services LLC, Oman EXPERIENCE SUMMARY
Jan 2017 - Till Date: Special Technical Services LLC, Oman as a Sr. Quantity Surveyor - Mechanical.
Nov 2013 - Jan 2017: Reliance Corporate IT Park Ltd. (A Major Subsidiary of RIL) as a Construction / Billing Engineer - Mechanical.
Jan 2012 - Oct 2013: Kay Bouvet Engineering Ltd., as a – Mechanical Engineer – Billing.
Dec2010 - Jan2012: Logos Engineering Pvt Ltd. as a Junior Engineer – Mechanical.
Feb2008 - Jun2010: Maven Industries Ltd, as a Junior Engineer. ORGANISATIONAL EXPERIENCE:
Designation : Senior Quantity Surveyor Mechanical
Duration : Jan 2017 till date
Company : Special Technical Services LLC, Oman.
Client : Petroleum Development Oman LLC (PDO).
Responsibilities:
Preparation of estimation based on engineering drawing package for budgetary and based on AFC drawing revised estimation take off will take.
Material Take off for piping and mechanical disciplines from Piping Isometric, Support and structural drawings, Bill of Quantities.
Maintain measurement and certification system in accordance with Method of Measurement mentioned in Contract Document.
Prepare various quantity surveying documents including BOQ, scope evaluation, budgetary estimates from Tender documents.
Preparation of sub-contractor documents to float in vendor management Joint supplier registration system.
After floating, prequalification vendor documents to be processed for subcontractors, based on prequalified subcontractor technical qualification to be done based on scope of work and others.
Preparation of cost comparison based on SOR scheduled rate with subcontractor rate and evaluated preparation of L1, L2, L3 & L4 subcontractors.
Based on selection of vendor quotation, negotiation will be done as per company budgeted values arrives. Accepted vendor to be awarded for tender to start the job by giving a subcontractor agreement / PO.
For manpower vendor agreement, based on out of subcontractor registration system send through mail and process will be the same as subcontractor vendors for selection process.
[2]
Other than tendering, subcontractor invoicing IPC to be prepared and processed based on site certification and other backup documents in ERP system.
Hire manpower invoicing to be prepared and processed based on actual time sheet approved from site management.
Hire manpower PO to be initiate on each vendor based on agreement rate accept by vendor.
Preparation of Work order and Purchase order for additional or out of scope of work by Subcontractors.
Identification, quantification and valuation of change including impacts on schedule and the negotiation and agreement of the change with clients and / or subcontracts
Preparation of Monthly Subcontract Interim Payment Certificate, review and verify Invoice submitted by Subcontractor for Temporary facilities, Construction and Catering services prior to approval and transmitting to finance and accounting.
To assist in the review and settlement of any claims as may be raised by subcontractors.
To checking the modification, extra work from subcontractor & controlling the cost. Reliance Corporate IT Park Limited (A Major Subsidiary of RIL) Designation : Construction / Billing Engineer Mechanical. Duration : Nov-2013 to Jan-2017.
Company : Reliance Corporate IT Park Ltd. (A Major Subsidiary of RIL), Jamnagar. Project : Jamnagar Gasoline Up-Gradation Projects – J3. Responsibilities:
Preparation and maintain AFC estimation for piping and mechanical disciplines from Piping Isometric, Support and structural drawings, Bill of Quantities.
Maintain measurement and certification system in accordance with Method of Measurement mentioned in Contract Document.
Take the Additional Quantity of Piping& mechanical items which become under Field changes according to site condition which affects project schedule as well as cost.
Review and verify Subcontractors final bill of quantities (FBOQ) including re-measurement when applicable & Variation request, in accordance with specific requirements and / or company procedures & certifying subcontract payments and evaluating and negotiating variations.
Identification, quantification and valuation of change including impacts on schedule and the negotiation and agreement of the change with clients and / or subcontracts.
To assist in the review and settlement of any claims as may be raised by subcontractors
To checking the modification, extra work from subcontractor & controlling the cost.
Tracking the contractors RA bill status for different work orders.
Maintaining the certified items tracking sheet for each RA bill wise of different work orders.
Attending the site visit for physical verification before proceeding the proposal work
Certification of extra and site modification work based on job card (Man hour basis).
Certification of P&M Log book details (Cranes and Heavy Equipments).
Responsible for Filed verification and certification of sub contractor bills on monthly basis.
Materials requirements preparation for running projects.
Planned, managed and supervised Structural, Piping and equipment erections.
Identification and marking of test loops, preparation of test packs, as-built drawings, method statements, site engineering query.
Interpretation of isometric drawings, P&ID, equipment layouts, general arrangement drawings.
Final document preparation and submission.
Planning and organizing day to day activity including equipments, piping, testing.
Weekly meeting with Contractors.
Co-ordinate with sub-contractors and suppliers.
[3]
M/s Kay Bouvet Engineering Ltd
Designation : Mechanical Engineer – Billing.
Duration : Jan-2012-Oct-2013.
Consultant : Engineers India Ltd.
Client : Mangalore Refinery Petrochemicals Ltd. – Mangalore. Project : Construction of Intermediate Product Storage Tank, ONGC-MRPL Phase III Project. Responsibilities:
Preparing the IFC estimates for Tank, Structural and Piping works as per drawing, to define the scope.
Responsible for to carry out the inspection of job on daily basis to ensure that job is being carried out as per specifications and drawings.
Monitoring & updating the progress quantity for invoicing and progress updating.
Prepare Monthly Invoice with the help of updated Progress and submit to client with supporting documents.
Review and Certify the Sub Contactor bills on monthly basis.
Review the measurements for the job completion.
Review the progress of the job through daily site visits and interaction with Contractors/EIL site engineers.
Attend weekly/monthly review meetings with the clients for project review.
Review project plan and determine the time, cost and labor requirement.
Raising MTO for additional materials required.
Review and submit final documents to clients.
M/s Logos Engineering Pvt Ltd, Chennai
Designation : Junior Engineer
Duration : Dec2010 – Jan2012.
Client : Chennai Petroleum Corporation Ltd, L&T Valves, BSNL, Toshiba Generators. Project : Construction of Decarbonation Tank, Tire curing press piping, Galleries for generator manufacturing.
Responsibilities:
Detail study of drawing and preparation of BOQ.
Prepare IFC Estimates as per the SOR rates.
Certification of Sub Contactor bills on monthly basis.
Preparation of RA bills and getting certification from client.
To review the measurements for the job completed.
To monitor the compliance of HSE polices by contractor.
To attend weekly/monthly review meetings with the clients for Invoicing review. M/s Maven Industries Ltd, Nagpur.
Designation : Junior Engineer
Duration : Feb2008-Jun2010.
Project : Pioneer in Manufacture, Export and Supply of optimally pure soya products. Responsibilities:
Inventory control of Raw materials and finished products through ERP.
Preparing Weekly, Monthly Productivity analysis reports.
[4]
Coordinating with inter departments like Procurement, Production &Quality.
Dispatch for the Monthly target achievement
Work with team to maintain smooth running of the plant
Assisted in the preparation of documents and systems for the ISO audit certification. SKILLS:
Ability to work under a team efficiently and also to work individually as per the requirement of the project under consideration
Capable of solving complex problems.
Good knowledge of MS Windows, MS Office, SAP (Creation of network and service entries), JD (Sub contractor invoicing), ERP software.
Trained on DuPont HIRA/JSA/STA at Reliance Industries Ltd. EDUCATIONAL QUALIFICATION:
B.E (Mechanical Engineering) with an aggregate of 80.2%
Higher Secondary School with an aggregate of 70.75% PERSONAL PROFILE:
Fathers Name : R.Kalirajan
Date of Birth : 05/04/1986
Nationality : Indian
Marital status : Married
Languages known : Tamil, Hindi, English
Passport Details:
Passport no – R2394902, Date of issue-05/06/2017, Date of Expiry -04/06/2027, Place of issue – Muscat. I hereby declare that the above statements are true and best of my knowledge. Regards,
K. Vinoth Kannan