Post Job Free
Sign in

Construction Superintendent Project Management

Location:
Pharr, TX
Salary:
125000
Posted:
February 20, 2025

Contact this candidate

Resume:

Miguel Angel Flores Madrigal Arch.

C: 956-***-****

email: ****.****@*****.***

Profile

Development of Construction projects coordinating effectively different disciplines focused on Project Management and Lean Construction

Abilities

-Communication Skills -Teamwork -Leadership

-Conflict Resolution -Time Management -Adaptability

-Resources Coordination

-Experience in Commercial, Residential and Vertical apartments Projects Professional Experience

PaintJet Traveling Superintendent Apr – Oct 2024

Tracking close out of several projects around US, Improve the client-subcontractor relationship by presenting reliable daily reports and constant monitoring of production and customer requirements, safety meetings. Start Change Orders and Contract addendums negotiations. Evaluation and testing of painting jobs carried out using robotic technology. Clients. - Layton, Vardaman

Alpha Building Corporation Construction Superintendent Aug 2023-Feb 2024 Supervising and Construction of 12/18 single Houses, evaluating subcontractors and suppliers, tracking daily production, quality control, walkthrough city and client inspections. Remodeling single Home Demolition, New sewer, water lines and electrical circuits, new windows, closets, doors, kitchen, walkthrough city and client inspection, CO and closeout. Supervising and Construction Utility IT and Electrical Rooms; Conference and Utility Rooms Clients. - Space Exploration Technologies Corp.

CDI Contractors - Superintendent Assistant Jul 2022-Jun 2023 Site Supervising, Daily Reports, Safety meetings, three weeks look ahead, Schedule updates, Drawings evaluation, tracking production of all trades, change orders, RFI, Drawing review. 3 Warehouses 240,000 Sf, 116,000 Sf and 174,200 Sf, Mesquite, Tx. Earthworks and Utility s works on 2 Warehouses 203,000 Sf and 189,000 Sf. Arlington, Tx. Clients. - Huntington Developer, North Point.

Cash Concrete – Labor/Foreman Apprentice May-Jun 2022 COFMA Contractor Nov 2010-Oct 2012 / Nov 2018-Jan 2021 Contractor. - Supervisor, Estimator, Materials Buyer, Designer, Consultant, HR, Concrete Slabs Foam Equipment 4,305.5 ft2, Remodeling 28 new Dock leveler pits in 2 Warehouses, 30 m3 Welded Steel Water Tank, Civil Works, Masonry and Landscape Office Building 73,819.5 ft2 (12 Stories), MTY Airport 267 ft Storm pipeline and 3 19.4yd3 Prefabricated Inlets. Home Remodeling 1291.66 ft2, Civil Works and Masonry AAA Residence 6081.60 ft2, Civil Works and Finishes Apartments Building 57,048.67 ft2 (8 Stories), Three Single Family Residences AAA 5,130.79 ft2 each, Pool and amenities Country House “Los Angeles” 4300 ft2. Apodaca, NL. Miguel Angel Flores Madrigal Arch.

C: 956-***-****

email: ****.****@*****.***

Constructora Garza Ponce Construction Superintendent 2014 May/2018 Oct Project Development follows PMI Standards (APP, ESCALA), Mentoring and crew Management, Budget and cost control, Build and Schedule Development, Support Estimating and Procure process, tracking Quality reports and Safety Development (OSHA Standards), projects closeout. Michelin Mezquite Tires Factory 1,430,209.5 ft2, 5 Tilt Walls Warehouse 645,834 ft2, Compressor Plant Expansion & Clean Room Iso 5, 53,819.5 ft2. Internal Customs Office (Aduana Interpuerto) 376.736.5 ft2.

Bilden Project Coordinator/PM Jr. 2012 Dec/2014 May Project Coordination, Schedule management, Cost Control, Subcontractors meetings, Safety management, Architect drawings revisions, accurate project documentation. TECMAQ Machining Plant Expansion 107,639 ft2, Precast Warehouse 217,321 ft2. Hermosillo y Asociados Project Engineer/Superintendent 2008 Apr/2010 Nov Project Coordination follows Company standards, crew management, tracking construction production, coordinating schedule and subcontractors. The Home Depot Tlaquepaque 126,875.1 ft2, 10,464 yd3, Concrete Cistern, Tissue Paper Manufacturing Plant Expansion 161,458.5 ft2, Whirlpool Storage and Distribution (Tilt Wall), railway & offices 1,022,570.5 ft2. CONTUS (STIVA) Project Engineer / PM Jr. 2005/2008 Mar Project Coordination follows Company Standards, controlling construction, tracking production, scheduling, budget control, estimating, and safety meetings. Remodeling of Corporate Offices 18,916.68 ft2, Didactic Museum “Museo del Acero Horno 3” 183,958.42 ft2, SEARS Plaza Citadel 126,480 ft2, Plaza Las Puentes first Phase 96,506.4 ft2, Arenko Project Engineer 2003/2005

Field Supervision, Quality Control and Track Daily Production in different trades, Construction Control, Budgeting, construction planning, Drawing revisions and Change orders. Automotive Headlights Warehouse Expansion 161,458.5 ft2 (Tilt Walls), 7 Precast walls Warehouses 547,569.7 ft2 Junkyard Company Paving 269,097.5 ft2, Asphalt Road and City Utility s 1.2 miles, 1250 Tn cold extrusion press foundation.

Maíz Transforma Project Engineer 2000/2003

Field Supervision, Quality Control and Track Daily Production in different trades, Construction Control, Budgeting, construction planning. 5 Industrial Warehouses 439,062.8 ft2, HEB Precast Concrete Wall Construction 91,493.15 ft2, Civil Works and Finishes in Office Tower 53,819.5 ft2 (7 Levels). San Pedro, NL

College

Degree: Bachelor’s in Architecture.

Universidad Autónoma de Nuevo León, San Nicolás de los Garza, N.L. Miguel Angel Flores Madrigal Arch.

C: 956-***-****

email: ****.****@*****.***

Courses

MSC Project 2013, CMIC N.L. NEODATA 2014. CMIC N.L. ERP MSC Dynamics, TI Garza Ponce CEAH S.C. Neurolinguistic Programming. APP, ESCALA, Construction Management Quick Learning, A.C. (Basic Language English) Tilt Up Supervisor, ACI Osha 30

Personal Information

Permanent Resident

SSN 3314

Texas DL



Contact this candidate