Post Job Free
Sign in

Project Manager Construction

Location:
Lafayette, LA
Posted:
February 14, 2025

Contact this candidate

Resume:

Nelson H. Francis

*** ******** *****

Lafayette, LA 70508

Phone: 337-***-**** or 354-9368

Email: *************@*****.***

Summary of Qualifications

** ***** ** ********** ** oilfield construction, installation and maintenance. Over 24 years’ experience as an onshore and offshore Superintendent/Project Manager/Company Representative, Project Management, writing procedures, specializing in all welding applications, rigging, and crane operations. Sub-Sea Operations, PNA, Downhole Operations, Hydro testing, Commissioning and Decommissioning of Onshore/offshore facilities, Excavation and land modifications. Auto cad, Nav Works, Microsoft office. Trained as a First Responder, T2, Crane Operator, Safe Gulf, Confined Space, Water Survival, Fall Protection, Scaffolding, Haz-Mat, Fire Rescue, and CPR. Fluent in Spanish.

Professional Experience

Offshore and Onshore Operation / Construction Manager

2017-2022 Siren Oil Services (ENI Rep.) Robert, LA

Offshore Project Manager / Construction Manager (Fieldwood Energy)

2012-2016 S&S Consulting Group Baldwin, LA

Offshore and Onshore Project Manager / Business Development

2010-2012 Blanchard Contractors Broussard, LA

Offshore and Onshore Construction Superintendent / Project Manager

2000-2007 Quality Construction & Production Lafayette, LA

Education

1994 - 1998 University of Louisiana Lafayette, LA

Undergraduate Studies in Petroleum Engineering

Completed Projects

Tanner Offshore – Single Leg Platform Installation Job duties: Supervised and managed project to completion, Supervised setting, driving, and welding of 36” Pilons on single leg structure, Set deck on correct coordinates, Installed access cage ladders and safety equipment, Set installed and hooked up navaids and SCADA equipment.

Gulf Island Fabrication (ATP Project) – Complete Facility Build Job Duties: Coordinated with Gulf Island personnel to get decks set, Coordinated material movement, Supervised all personnel on project for the assembly of the process platform. 68- Construction personnel 7-month completion date

Plaines Pipeline (PXP) West Texas- Various Pipeline installations and hook-ups Job duties: Managed several locations, created schedules for each facility build, ensured all permits were in place as needed, coordinated where to place contractors as needed between facility locations, Made rounds throughout day between facilities to ensure work production was ongoing. Managed excavating, pipeline laying, and fabrication of pipelines. Managed pumping station facility builds.

Tetra DB-Hedron – Removed Maritech Resources (GOM) PNA Platforms in the Vermillion and South Marsh Island fields Job Duties: Coordinated with barge master after set up on locations, Managed topside and sub-sea operations for the prep and removal of each location, Watched over material barge loadout operations, Visually inspected welds of Tie-Down Gussets on material loaded out on barges for inbound transit, Created reports and submitted documents as needed to Houston for BESSE approvals

Hilcorp Energy – SS 209-B Duel Compressor, Pipeline Installation and Facility Upgrade Job Duties: Managed 3-separate facilities simultaneously for field upgrade, Managed and Coordinated all logistics, companies, equipment, personnel, and materials needed for separate locations, Inspected ongoing work to ensure engineering revisions were corrected, Managed all hydro operations Coordinated with engineers as needed (11-Month Project)

Apache//Fieldwood Energy - EI 337-A Well Recovery Project Top Side/Sub-Sea Job duties: Assessed top side collapsed well heads, lined up companies and personnel as needed, coordinated logistics, Watched over, Managed wireline to set plugs, Managed pulling stringers, Managed cement and PNA of collapsed wells Managed Cason repairs both topside and sub-sea

Apache/Fieldwood Energy - EI 212-A Well Hook-Up and Flow Back Job duties: Lined up companies, equipment, and loadout, Managed Hydrotest and flowback operations for flowing back the new well. Managed bringing the well in service, Coordinated with company engineers

Eni Petroleum – GC-254 Offshore Construction Manager Facility Upgrade Job Duties: Managed entire project and all personnel involved for both land and offshore, Coordinated between Company and 3rd party engineers, Coordinated logistics, Lined up companies, personnel and equipment as needed, Watched over fabrication of piping and packages, Coordinated loadout of heavy lift packages, Managed offshore offloading and installation of heavy lift packages, Managed Construction, Pneumatic, Mechanical, technology, and engineering companies during offshore platform upgrade operations, Coordinated operations during 28day shut-in

Eni Petroleum – EW-921 Offshore Construction Manager Decommission of TLP and Pipelines Start to Finish Job Duties: Prior to work scope starting: Coordinated between, Houston office, production, and construction personnel to get 4” oil pipeline sand plug cleared without having coil tubing involved, (Sand plug freed up in less than 48 hours) Walked down and marked up isolation points on Platform PNID’s, Created material list to start flushing process, Assisted with writing procedures, Managed entire project and all personnel involved for both land and offshore, Created 10-day forecast schedules throughout project, Reported to engineers in Houston Daily, Coordinated logistics, Lined up companies, personnel and equipment as needed, Managed all pipeline flushing operations, Coordinated with dive vessel and dive personnel during dive operations.

Customer References

Eni Petroleum 713-***-****

Manuel Lopez 832-***-****

Michael Buddy

(Apache) Fieldwood Energy 337-***-****

Tracey Bhim 337-***-****

Steve Griesbach 713-***-****

Talos Energy

Larry Robinson 337-***-****

Arena Offshore

Paul Eubanks 979-***-****

Siren Oil Services

Merlin Perrin 504-***-****

S&S Consultants

Bruce Soucier 985-***-****



Contact this candidate