Curriculum Vitae

(Resume)

Eng. / Mouhab Al Bayar

Construction & Building Engineer (Civil)

Mobile:009********** (KWT)

002*********** (EGY)

Personal information:

m

Mouhab Mohammed Maher Al Bayar

2-MAY-1980

Kuwait

Egyptian

Male

Married

Article 18 Transferable

009********** (KWT)

002*********** (EGY)

*************@*******.***

Career Objective:

Seeking an executive level opportunity in the Construction Management Field where I can utilize my academic background and internship trainings, experience and develop them further through my career progress. A well experienced Project & Construction Management Professional; With a well founded understanding of the correlation of the different scopes in any project: Construction, MEP & Infrastructure services, ID, Finishing and FF&E; Along with a diversified experience in all types of Construction Projects: Educational Facilities; High raise Towers; Hotels; Medical Facilities; Recreational, Health & Wellness ; Roads & Bridges ; Shopping Malls ; Oil & Gas Education:

Bachelor Degree in Construction and Building Engineering Arab Academy for Science and Technology.

IGCSE

British School Of Kuwait

Academic Activities:

x Graduation project (Project management) - Grade “A” Did quantity surveying, prepared method statements, planning & scheduling and cost estimation for the project “Academic institute for heart surgery” with a budget of 532 million EGP.

x PMP (Project Management Professional)

x Contracts & Law Diploma

x Primavera

Skills/Knowledge:

x Computer maintenance and installation (Hardware & Software) x Administrating windows based network environment x Primavera 3,5 & 6

x Microsoft Office (Excel, PowerPoint, Project & Word) x AutoCAD

x Excellent Research Skills

x Excellent negotiation skills.

x Time management skills.

x Excellent presentation skills.

x Good communication skills.

x Innovative, detail-oriented, experienced in highly visible/controversial projects. x Capable of managing multiple, high-priority assignments. x Strong interpersonal skills to develop good working relationships at various levels and to resolve complaints.

x Strong analytical skills to interpret research data for reports and apply mathematic techniques in practical situations.

x Reading comprehension to understand technical and legal materials. x Ability to work on several projects or issues simultaneously. x Ability to provide effective supervision and staff management. x Ability to manage projects effectively and meet firm deadlines. x Methods and techniques of effective technical report preparation and presentation. x Principles and practices of supervision, training and personnel management. x Budgeting procedures and techniques.

x Knowledge of local government procedures and practices. Languages:

x Arabic- Excellent.

x English - Excellent.

Work Experience:

Pace (Kuwait) (Nov 2011 – Present)

SABAH AL-SALEM UNIVERSITY CITY - KUWAIT UNIVERSITY - KU/ADFA Project

(174,117,000.000 KD = 0.60 Billion Dollars)

Construction, Completion & Operation & Maintenance for Administration Facilities Buildings

– 7 Buildings (ADFA).

JW MARRIOTT REFURBISHMENT, SALHIA MALL & OFFICE EXTENSION Project Facade Refurbishment, Retail Extension, Hotel Refurbishment, Landscape, Furniture. Demolition & Construction Works – 3 Buildings.

RA/167 - Jamal Abdul Nasser Street Project

(242,420,240.940 KD = 0.85 Billion Dollars)

Upgrading of the existing Jamal Abdul Nasser Street with the upgrading of the associated Storm-Water Drainage, Sewer, and other services in the contract area. From Sheraton roundabout up to Ghurnata area.

Business District at Hessah Al-Mubarak District Project Construction, Completion & Maintenance – 6 Buildings. Preparatory Works (Excavation, Shoring and Dewatering) o Consultant Senior Project Controls / Planning Engineer

Reviewing all project disciplines to ensure understanding of total project schedule needs and integration of schedule activities.

Review project schedule, manpower and quantity reporting to ensure the preparation and presentation of the Critical Items Action Report.

Review project schedule analysis and studies of problem areas to determine criticality of schedule activities and recommend alternatives for schedule improvement to project team for discussion and/or decision.

Interface with project site management and client counterparts for specific planning and scheduling tasks.

Provide comments and recommendations for planning and scheduling requirements relative to scheduling, staffing and project control.

Assist in performing some cost engineer functions.

Providing advice and support to the construction team on how to recover any delays.

Reviewing & Studying Claims & Variation Orders.

Provides overall management of division-related planning issues. o Top Management / Executive Tasks

Prepare Construction Supervision Agreement Extension of Time and Variation Orders.

Provide recommendations for staffing relocation and talents to be retained, via demobilization to other projects across Supervision Department.

Decima International (USA) {Part Time} (Nov 2022 - Present)

Microsoft Data Centers Construction (Worldwide/Global) Construction, Completion & Operation & Maintenance. Renovation, Completion & Operation & Maintenance.

The Planning Consultant for Microsoft in the Data Centers Construction

(Worldwide/Global), where Microsoft has implemented several new technologies in Data Centers Operation that are more Eco-Friendly and energy saving. o Principal Consultant

Head of “Planning Department”, along with several business development tasks. Manage and supervise the planning department and the team of Senior Planners across all our projects/locations, mentoring the Team to ensure the integration/colleration of Decima’s purpose, mission, standards and strategy with its daily operations. Making sure that clients get the necessary resources and receive excellent service, overseeing the work of client teams within the firm in developing strategic plans and carrying them out to completion.

Offer recommendations for entering new markets, making existing products more competitive or implementing operational improvements. Some of the most common roles and responsibilities include:

• Serving as a primary point of contact between the client and the firm

• Facilitating discussions and organizing research activities

• Understanding the competitive marketplace and industry dynamics

• Creating strategic plans for addressing client needs

• Obtaining management support and advising on organizational change messages

• Organizing internal teams and overseeing deliverables

• Managing internal quality assurance

• Participating in business development activities to achieve new client growth Business development

Working to help bring in new business regularly. With the insight to find new clients and establish relationships with them.

Objective

To guide the Contractor into preparing & following a realistic fully/properly detailed; cost

& resource loaded Project schedule.

Thus, enabling proper/accurate progress monitoring by all parties at any time along the project duration. And will give us an overall vision of the performance of the project and avoid making inappropriate decisions.

• Resulting in:

Accurate time-phased budgets.

Accurate cost forecasting during project execution.

Accurate cashflows.

Ability to be proactive in managing costs.

Achieving better management visibility.

Developing disciplined planning.

Planning and meeting the expectations of realistic schedules.

Developing achievable objectives.

And, finally, the project ending on schedule and within budget.

Combined Group Contracting Co. (Kuwait) (2011)

RA/140 Sheikh Jaber Al Ahmad Al Sabah CauseWay Project (780,000,000 KD) It will be the fifth longest bridge in the world. The bridge will be 22 km long and will connect Kuwait City with the development region Subiyah, which lies across the bay. The bridge will be a low-level bridge with a number of embankments near the coast. To allow ships passage to the Kuwait harbour the bridge will be suspended over the channel.

RA/184 (IC.s : I,3,4,5 & 7) Interchanges on 6th Ring Road at Jahra Area

(39,000,000 KD)

The Completion & Maintenance of the Interchanges [Nos. ( IC. 3, IC. I, IC. 4, IC. 5, IC. 7) MPW ( 60, 61 )] on the main 6th Ring Road Highway, Connecting to the New Housing Area at South Jahra.

RA/188 (IC. : 6) Interchange on Fahaheel Expressway at Sabahiya & Mangaf

(27,650,000 KD)

The Completion & Maintenance of the Interchange [Nos. ( IC. 6)] on Fahaheel Expressway at Sabahiya & Mangaf.

o Senior Planning Engineer (Team Head 2 Planners)

Working with all project disciplines to supervise and ensure understanding of total project schedule needs and integration of schedule activities.

Supervise project schedule, manpower and quantity reporting and to ensure the preparation and presentation of the Critical Items Action Report.

Supervise project schedule analysis and studies of problem areas to determine criticality of schedule activities and recommend alternatives for schedule improvement to project team for discussion and/or decision.

Interface with project site management and client counterparts for specific planning and scheduling tasks.

Provide comments and recommendations for planning and scheduling requirements relative to staffing and project control.

Assist in performing some cost engineer functions.

Providing advice and support to the construction team on how to recover any delays.

Preparing & Studying Claims & Variation Orders.

Serve as acting Planning Director in his or her absence.

Provides overall management of division related planning issues.

Advises the Planning Director on all planning related matters.

Participates in budget preparation and administration, monitors and controls expenditures.

x Ahmadiah Trading &Contracting Co. (Kuwait) (2007 – 2010)

United Tower (Sharq) (70,000,000 KD)

Covering a land area of 4,852 sqm and with a total built up area of about 98,000 sqm, consisted of 60 floors and a height of 240 m.

Injazzat Tower (Sharq) (26,000,000 KD)

Covering a land area of 1,000 sqm and with a total built up area of about 15,000 sqm, consisted of 28 floors and a vehicle elevator.

KNPC Revamp EFFLUENT TREATMENT FACILITY – [MAA, MAB & SHU -Oil & Gas]

(78,000,000 KD)

Revamping the Effluent Treatment Plant at three refineries to further enhance the quality of treated effluent before discharging to sea. (Clarifiers, Aerators & Pre- Aerators). The "Original Contract Value" was 52,000,000 KD - the rest was claimed.

Jaber Al Ahmad City, Doha, Kuwait (C.N. 1152) - [N1,N2 & N3] (167,000,000 KD) Soil improvement has a total area of 4,865,228 m2, Sanitary sewer line has a total length of 12,060 m by non-disruptive method is 9,677 m long, Storm drainage line has a total length of 22,806 m (vitrified clay or HDPE pipe or polymer concrete pipelines), Potable water pipeline, the Total length is 33480 m ductile iron pipeline with total quantity of manholes for valves is 442 nos., consist of sluice valves, Air valves, washout valves, Fire hydrants, Pressure Reducing valves and Flow meter. Road works, Telephone, Electrical and Street Lighting, Earth station for Satellite building, coastal station building, frequency station building, safety building, garage building and service building.

o Planning Engineer

9 Projects Planning and Scheduling of Civil works by selecting the appropriate techniques and sequence of events.

9 Preparation and Updating Projects status, labor histogram and Financial forecast. 9 Preparing cash flow by cost loading the activities on Primavera. 9 Projects monitoring and update.

9 Prepare Progress Reports.

9 Providing advice and support to the construction team on how to recover any delays. 9 Preparing & Studying Claims & Variation Orders.

GDC (Kuwait) {Part Time} (2010)

Sabah Al Salem University City Project (BP 01) (6,000,000 KD) Constructing a complete New University City at the Shadadiyah Campus. The project site is located on the south west side of Kuwait City and the site encompasses some 4.9 million square meters. Infrastructure works & earth works. o Planning Engineer

Projects Planning and Scheduling of Civil works by selecting the appropriate techniques and sequence of events.

Preparation and Updating Projects status, labor histogram and Financial forecast.

Preparing cash flow by cost loading the activities on Primavera.

Projects monitoring and update.

Prepare Progress Reports.

Preparing & Studying Variation Orders.

FDC (Kuwait) {Part Time} (2010)

Six Senses Spa – Symphony Mall (1,600,000 KD)

Construction, electromechanical works, finishing & furnishing of the The Six Senses Spa (Multinational Franchise), on the second floor of the new five star Missoni Hotel at Salmiya, it has 13 treatment rooms including two Hammams. The 1,500 square metre spa also houses a fitness centre with a gym, yoga studio, experience shower, sauna, steam rooms and luxurious relaxation areas.

Warba Bank – Al Sanabel Tower (2,650,000 KD)

Construction, electromechanical works, finishing & furnishing of Warba Bank located at Al Sanabel Tower (3 Storey).

o Planning Engineer

Projects Planning and Scheduling of Civil works by selecting the appropriate techniques and sequence of events.

Preparation and Updating Projects status, labor histogram and Financial forecast.

Preparing cash flow by cost loading the activities on Primavera.

Projects monitoring and update.

Prepare Progress Reports.

Preparing & Studying Claims & Variation Orders.

x Total Management Consultancy (Kuwait) {Part Time} (2007)

Holiday Inn (Salmiya) (78,000,000 KD)

Rennovation of Al-Huda Complex and the construction of a new extension building, finishing and furnishing of the overall new hotel.

Crown Plaza (Farwaniya) (146,000,000 KD)

Rennovation of existing hotel and the construction of a new extension building, finishing and furnishing of the overall new hotel. o Planning Engineer

9 Preparation and Updating Projects status, labor histogram and Financial forecast. 9 Projects monitoring and update.

9 Prepare Progress Reports.

x Shaheen Al Ghanim Co. [Roads & Bridges] (Kuwait) (2006 – 2007)

Subiya Road Project (RA125) (24,678,000 KD)

Construction of a 23 km road and 2 bridges from Jahra to Subiya o Planning Engineer

9 Projects Planning and Scheduling of Civil works by selecting the appropriate techniques and sequence of events.

9 Preparation and Updating Projects status, labor histogram and Financial forecast. 9 Preparing cash flow by cost loading the activities on Primavera. 9 Projects monitoring and update.

x Arab Contractors (Egypt) (2004 – 2006)

Academic institute for heart surgery (578,000,000 LE/EGP) Maintenance of existing structure and the construction of 2 new floors, finishing, medical equipping and furnishing of the hospital. (Construction, Electromechanical, Bio-Medical, Finishing & Furnishing Works) o Site Engineer.

9 Performing the reinforced concrete work (Form work - Steel work - Concrete pouring). 9 To level, survey and set out the site.

9 To manage, monitor and interpret the design of the contract documents that has been supplied to them.

9 To manage the site on a day to day basis that includes supervising and monitoring the labor force and that of the sub contractors.

9 To oversee upon the quality control methods in place. 9 To resolve unexpected technical problems that may arise. 9 Ensure that the work is done in accordance with safety and environmental requirements.

x Management & Claims Bureau (Kuwait) {TRAINEE}

o Method statements, planning & scheduling and cost estimation. o Claims.