Post Job Free
Sign in

Project Engineer Manager

Location:
Centro, Tabasco, Mexico
Posted:
February 06, 2025

Contact this candidate

Resume:

Software / Hardware Interpretation / modeling

PETREL – All Modules (4)

LANDMARK – All Modukes (4)

GEO 5 (2)

GCDKit Software (3)

DataMine (mine software) (4)

Geospect(mudlogger software)

Log Viewer 8.6.0 - WellSight

Systems Inc

Windows Office (4)

PETREL (4)

LANDMARK (3)

AutoCAD (3)

DETAILS

+52-993*******

*******@*****.***.**

CAREER

WELL SITE GEOLOGIST /

OPERATIONS GEOLOGIST /

MUDLOGGER OPERATIONS GOM

Core Logging Geologist Operations

Geologist. Conventional and Un

Conventional Reservoir Regional

Geology Reservoir Geologist Core Salt

Preservation Drilling deep wells. NO

Conventional Reservoirs. Re-entry,

fishing. LWD – MWD Drilling

Operations Geologist Environmental

Projects Busines Development

Industrial Engineer Project Engineer

(Cost Controller

Profile

29 years dedicated to Geology Operations:

Reservoir Geologist – Integrated Studies – Drilling Operations – Exploration Geologist Manager - Supervisor in logistics operations and geoscience projects Manager Supervisor in logistics operations and geoscience projects Omar A Peley Sandrea

Senior Geologist – Operations Engineer

Education

PIA Program (CIED – PDVSA) 1999

Industrial Enginer 1998

Bachelor in Geology 1990

Certifications / Training

RigPass IADC. certificate number: SXX000171551 /ID 010*****-**** Trapped pipe prevention 2011

Drilling Technology SMITH 2009

Software proficiency (1= General Knowledge, 5=Proficient) Achievements

- Olmeca University. Villahermosa, Tabasco Associate Professor. Academic Department of Earth Sciences. 2015

- First place in class 1999. PIA Integral Program in Reservoir, Production and Drilling. CIED PDVSA, Venezuela

- Honorable Mention and Publication Mention. Industrial Engineering Degree Thesis. 1998

- Citizen achievement:

First place of the 1989 generation and Later Coordinator of Instruction in the Maracaibo Rescue Group.

LANGUAGES

Spanish

English

DOCUMENTATION

USA: B1/B2 VISA: 305823

Covid19 Fully Vaccinated

Omar Antonio Peley Sandrea

LinkedIn

Recent project experience

MUDLOGGER OPERATIONS– Master Drilling México May 2022 – Dec 2024: Drilling pilot holes, service holes, ventilation holes (chimneys) Customers: Mineral Mines

(Surface - underground mines). Technology: Rise Boring – Rock Boring -Mobile Tunnel Borer CONSULTANT: Operational Geological Support: Drilling Fluid Supervisor. Conditioning – control – improvements / Lithological Descriptions / Drilling Geology / Long – Short Drilling Mexican Mines: Capstone Copper, Cuzcatlan, Cerro Los Gatos, Koura, Charcas, Velardeña, Tizapa Resident Engineer - Progress control - Estimate - Customer Support - Supervision: work / personnel

WELL SITE GEOLOGIST– Consultec International Inc. / Jaguar Exploración y Producción April 2020 – May 2022:

Drilling Onshore and GAS Wells. Geological activities ON-SITE Supervisor: mudlogging, cuttings, cores, geological drilling. Rotation: 28x28 days GAS Wells: Cunca de Burgos, México North. Rusco-042DES / Tenoch-001EXP / Jununu-EXP / Spinini-1EXP GEOLOGICALS RESPONSIBILITIES:

Consultant for Exploration and development Wells - estimation of pore pressure for the Lithology / Strip log Preparation. Drilling Engineering (Observation & Interpretation- Drilling Parameters: Rotary Speed- Weight-On-Bit- Hook loadStandpipe Pressure- Rotary Torque- Drilling Exponents). Study of Rocks (sand / Carbonate). Describing cuttings and core samples and maintaining a current lithology log. Supervising core handling and description. Providing continuous qualitative evaluation of relative overbalance and estimation of pore pressure from drilling parameters. Interpreting and reporting hydrocarbon logs. Supervising production of accurate mud log and dispatching of geological samples. Participating in casing and coring point selection and TD determination with Drilling Supervisor and Operations Geologist. Recommending the most appropriate technology to meet the business objectives. Maintaining current QC reports on Service Companies. Maintaining relevant reports and files to allow a Final Well Report to be produced at the end of the well. Elaborating daily wellsite Geological Reports and ensuring all other logs, reports and data from the wellsite are given a preliminary QC. Witnessing Wireline Logging Runs. Quick Look Log Analysis. MWD Logging Runs (Formation Evaluation- Drilling Safety and Optimization Facilities engineer on field -Representative Engineer (Weatherford) June 2019 – September 2019:

VCD - SE. Weatherford - INNOVA (consultant) – PEMEX: Supervisor, review the VCD-SE works carried out by INNOVA (consultant) for the drilling of the SAMARIA wells. Late Miocene Integral Contract. Well Rabasa-207 (Agua Dulce, Veracruz) PEMEX: Presence at PEMEX client: operational meetings, investigations Cause - Root, other requests Programming and request services required in the drilling well. With Well Site elaboration of the program "Two weeks ahead" in the well.

Weatherford Laboratories Operations Engineer – Engineer-2 March 2018 –May-2019: Geological Business Development – Operations Logistic Supervisor in logistics operations and geoscience projects. Supervisor operational logistics the laboratory. Effective closing of two (2) integral contracts with PEMEX Field and laboratory services, geological services, basic conventional petrophysical services and special tests, reservoir engineering tests, geometry, production fluid analysis, unconventional deposits: Shale GAS – OIL Weatherford Laboratories Business Operations Specialist November 2017 – February-2018: Business representative and zone management for Weatherford Laboratories Mexico Ciudad Del Carmen – Campeche

Hidro Industrial O & G Technical manager May 2017 – October 2017: Development of projects, construction, consultancy, development of technologies, sale of products and equipment in the field environmental engineering • Contamination of soil, subsoil, and groundwater • Characterization studies in soils contaminated with hydrocarbons. • Remediation of sites contaminated by hydrocarbons. • ISO 14001: 2015. Environmental management systems. Requirements. • Internal Regulations of the National Agency for Industrial Safety and Protection •Environment of the Hydrocarbons Sector

(ASEA). SOILS NOM-138-SEMARNAT_SS_2003_Limites Max permissible hydrocarbons soils. carrying out the

CONTRIBUTIONS

- Creation and conductor (currently)

Mudlogging and Geological aspects

department at Master Drilling

Mexico

- Main Well Site Geologist in

Drilling of 8 GAS Exploratory

Wells for Jaguar Exploration &

Production

2020 - 2022 Principal

- Principal Operational Geologist:

Mexico South, Villa Hermosa IPM

Schlumberger Deep well (6500

meters) Drilling wells in Carbonates

Reservoirs. (Mesozoic)

It project won the 2010 Chairman’s

Award

General criteria for the operation of various types of units (agencies) carrying out the verification (inspection). NMX-EC17020-I MNC-2014 (EMA). GOINSA Senior Geologist October 2016 - April 2017: Static Model and Static Geological Modeling, PETREL2014. PEMEX. Campos Xanab-52, Manik Paraíso, Tabasco. Documents Control, white books, Schedule, deliverables- Customer

(PEMEX)

GOALS Geologist 2016 – May 2016:

Static Model and Static Geological Modeling, population rock properties. PETREL2013. PEMEX. Campos Poza Rica and Tres Hermanos. Poza Rica, Veracruz. 2016 – May 2016 Olmeca University. Villahermosa, Tabasco October 2015 – January 2016: Olmeca University. Villahermosa, Tabasco Associate Professor. Academic Department of Earth Sciences. Subjects: Formations Evaluations (logs), Petrophysics, Reservoir Static Characterization

Company: CORGLEZ. Project – Sales Engineer April 2015 – July 2015: Extensive knowledge in HSE programs, management systems (ISO 14000, OHSAS 18000, SEMS)

Activo Samaria Luna (PEMEX). Villahermosa, Tabasco. Geomodeler. January 2014 – November 2014. Schlumberger Mexico:

Static Geological Model. PETREL 2013. (Grids, cells, surfaces) Activo Samaria Luna (PEMEX). Villahermosa, Tabasco.

Geology (VCD Team integrated. Schlumberger) Paraíso, Tabasco. April 2013 – December 2013. Schlumberger Mexico:

Roles in Geology activities. Integrate Team. VCD Fields MAY and KUIL Structural Field Reservoir Modeling PETREL

Supervisor Geologist. April 2007 – September 2011 Schlumberger Mexico: Supervisor and director of activities for work team: - 2 Geologists - 2 Geo mechanics DRILLING OPERATIONS. NO CONVENTIONAL RESERVOIRS. USE LWD – MWD TECNOLOGY Supervisor Geologist. April 2007 – September 2011 Schlumberger Mexico: Creator of studies for new oil locations, field locations support geology controller Controller of vertical and directional wells save core, testing, mud logging Operational and office Geology Senior. - Creator of studies for new oil locations, field locations support geology controller - Controller vertical and directional wells, save core, testing, mud logging - Recommends purchase or disposition leases based on integrated geological and geophysical information; major contributor to lease sale evaluation efforts. -Supervise geological aspects about drilling wells - Generate detailed reservoir characterizations by incorporating structured interpretations, cross-sections, well log correlations and structural/stratigraphic framework analysis - Recommend major areas for future exploration efforts; - Generate/recommend to management about drilling opportunities - Familiarity with current salt tectonics research, and applied those concepts to geologic and seismic interpretation within complex and challenging environments. - Participate in multitasking team following well drilling operations to evaluate results

(Ehcopek-SA) Ciudad Ojeda, Zulia. Main Planning Engineer. Oil Project January 2006 – April 2007: Main Planning Engineer. O:

Analyst Project Planner. Microsoft Project. Construction Sequence of activities. Two weeks forecast. Personnel histograms, equipment, materials. Costs Control. Metric calculations. Progress reports, others. (Supervisor role)

(Petrolago) Boscan Field Perija, Zulia CHEVRONTEXACO. Project Planner Engineer. October 2004 – July 2005:

Project Planner Analyst. Microsoft Project. Construction Sequence of activities. Two weeks forecast. Personnel histograms, equipment, materials. Costs Control. Metric calculations. Progress reports, others.

Updated Dec 2024

Exploitation Unit Reservoirs Geologist Bachaquero, Lago. Geologist. March 2002 – March 2004 PDVSA Venezuela:

Reservoirs Geologist in “Bachaquero Lago”. Knowledge media in operations, practices and stops wells taking of samples in settlings of pipelines. (Maracaibo Lake, Venezuela). Horizontals, multilateral wells.

Infrastructure Studies Geologist in the Bachaquero Lake Operation. (temporary allocation) PDVSA Venezuela. November 2001 – February 2002:

Supervision and control in handling of the unit's facilities. Complemented with regular visits to facilities in Maracaibo Lake. Plants, multiple, wells, pipes, valves, etc Management Analyst Engineer in the Exploitation of the Bachaquero Lake Unit. May 2000 – October 2001 PDVSA Venezuela:

Management Analyst Engineer in the Exploitation of the Bachaquero Lake unit. Activities Management Analysis and Investment Budget Analyst of Bachaquero Lake Unit. Integrated Exploitation Studies Geologist of the Bachaquero Lake Unit. November 1998 – April 2000 PDVSA Venezuela:

Integrated Exploitation Studies Geologist of the Bachaquero Lake unit. Geologist of the Intercampos SMS area in the development of the static model carried out as a group among personal PDVSA and BEICIP FRANLAB. - Study and characterization of the “The Shadow” area in the Intercampos wells BA2405, BA-2406, BA-2407, BA-2409. Applications Management at LANDMARK. Active Participation (next to Asdrúbal Sandia) in the elaboration process of the series of maps of the Intercampos area of the Integrated Studies (K, Sw, I Am Vsh, ANP, Structural, other) ZIMAP - STRATWORKS - Member (5 months working with the team for the endorsement of practices in the Integrated Studies [Maracaibo T. S. OR in Geology/Engineer. Industrial Transfers Engineer to Reservoirs. February 1998 – October 1998 PDVSA Venezuela:

Regular Reservoirs Student of the Integral Training Project of III Reservoirs. CIED Maracaibo - Specialization in the Deposits area as one of the geologists on the final team. Project carried out in the Deposits of MARAVEN, LTD (LAGOMAR) Levels I-V English CIED PDVSA. Positioned as 1 of 20 inside the final qualified of the PIA III group. Known team Companions: Urbina J. / Vine E. / Cinfuentes J. U. E. Bachaquero Lago PDVSA T. S. OR in Main Assistant Geology of Geologist in the Organization of Geology (LAGOVEN, LTD). March 1991 – January 1998 PDVSA Venezuela:

T. S. OR in Main Assistant Geology of Geologist in the Organization of Geology (LAGOVEN, LTD) - Management of reports in the Technical Applications of Geology (MARK IV) as structural sections, Boards, maps, reports of Production other. - Elaboration, structural correlation of sections. Support to the geologists in the elaboration of the Prior Studies of Locating - Support in the annual revisions of the geological maps carried out by the section of maps of the Organization of Geology Lagoven, LTD. (symbol, I color, failures) - Technical geologist of the team of study that originated the discovery of the deposit C-7-X.14 Eoceno, Bachaquero South Exploratory well: BA-2015



Contact this candidate