Monterey Tn *****
************@*****.***
BILLY R RANDOLPH JR
OBJECTIVE
TO CONTINUE TO GROW AND EXPAND MY PERSONAL KNOWLEDGE AND EXPERIENCE WITH A GROWING DYNAMIC COMPANY
SKILLS & ABILITIES
PROJECT MANAGEMENT, LEADERSHIP, SELF – RELIABILITY, TRAINER, ISO 9000 DOCUMENTATION FACILITATOR, SOCIAL AWARENESS, EXTENSIVE TELECOM EXPERIENCE, MANAGEMENT SOUTHEAST INSTALLATION MANAGER WITH AS MANY AS 66 MEN, RESPONSIBLE, SELF STARTING, PROBLEM SOLVER BOTH IN AND OUTSIDE THE BOX, WHATEVER IT TAKES
EXPERIENCE
J4L SERVICES LLC – 5G TRAN SMP PROJECT OWNER OPERATOR
8/2021 – 12/2023
DOCUMENTED AN INVENTORY OF THE BILL OF MATERIALS VERSUS WHAT WAS DELIVERED. OPENED ALL BOXES AND PHOTOGRAPHED ALL MATERIAL LOCATED LOCATION FOR AIRSCALE INSTALL AND GPS OUTSIDE. INSTALLED THE FYMA, RAN CABLE FROM GPS TO THE FYEA, INSTALLED PER THE WIRING CODE IN MOP, INSTALLED THE AIRSCALE SHELF WITH AN ABIL AND ASIA CARDS. INSTALLED GROUND AND DC POWER, CRIMPED CONNECTORS, COMPLETED ICI AND TROUBLESHOOTING ON LTE AND 5G. DOCUMENTED INSTALL AND ICI PER MOP USING TALONVIEW. RELATIONSHIP WITH PLDT ADHOC CONSULTATION AND TEACHING
KMM CORP, LEWISVILLE, TX – 5G INSTALLATION AND INTEGRATION LEVEL 4
7/2020 – 8/2022
COMCAST 5G PROJECT TO REPLACE EXSISTING CISCO BACKBONE WITH TURNKEY 5G NOKIA BACKBONE. INSTALLATION, INTERGRATION & MIGRATION HOT CUTS.
SITE SURVEYS PERFORMED TO IDENTIFY OPEN FOOTPRINTS FOR INSTALLATION OF EQUIPMENT, LOCATION OF ALL POTENTIAL CIRCUIT DESTINATIONS, DC POWER, AND FIBER TYPES NEEDED AND LENTHS. RESPONSIBLE FOR RECEIVING MATERIAL FOR NOKIA 5G 1830 16II PROJECTS. DOCUMENTED INVENTORY OF MATERIAL RECEIVED FOR PSS-8, -16, OR -32. ALL PROJECTS USED THE EDP AS A MOP FOR ALL
CONTINUED
INSTALLATIONS. MOUNTED ALL SHELVES, RAN CRIMPED, LABELED, AND DRESSED DC POWR, INSTALLED ALL FIBERS, CLEANED, SCOPED, LABELED, AND DRESSED IN A TELCORDIA MANNER. UPON COMPLETION DOCUMENTED WITH PICTURES AND EOS REPORTS. MIGRATION OF NOKIA 1830 TO INTEGRATE INTO NETWORK BACKBONE.
BATTERY CORP, BOSTON, MASS – SOUTHEAST CONSTRUCTION SUPERVISOR 11/05 – 6/13
RESPONSIBLE FOR ALL 9 SOUTHEAST STATES IN THE AT&T AND THE T-MOBILE MARKETS. PERFORMED SITE SURVEY TO EVALUATE ALL DC UPGRADES FOR GROWTH IN THEIR PERSPECTIVE MARKETS. SITE SURVEY REQUIRED COMPLETING AUDIT FORMS, PICTURES, TESTING BATTERIES WITH A MID-TRONICS DC TESTER, DOCUMENTING POWER DRAWS OF EQUIPMENT. VERIFYING DC POWER SYSTEMS, AND BATTERY TYPE. UPLOADED ALL INFORMATION USING 0MS SOFTWARE. UPON EVALUATION OF CUSTOMER NEEDS, SUPERVISED VARIOUS TEAMS TO PERFORM REMOVALS AND/OR INSTALLATIONS TO ADDRESS THE VENDORS NEEDS.
GENERAL INSTALLATION, ENGINEERING, AND PROJECT MANAGEMENT
5/79 – 9/05
EXPERIENCE PROVIDED UPON REQUEST
EDUCATION
MONTEREY HIGH SCHOOL, MONTEREY, TN 1976 GED
PROJECT MANAGEMENT INSTITUTE
PROJECT MANAGEMENT CERTIFICATION (PENDING)
TELECOMUNICATIONS CERTIFICATIONS TO MANY TO LIST
NEC AMERICA SONET TRAINING – 02/01/1998
NOKIA AIRSCALE TRAINING – 5/2018
LEADERSHIP
THE ABILITY TO READ PEOPLE AND TO DETERMINE TRAINABILITY, AND MOTIVATE TOP PERFORMANCE TO TRAIN THE VALUE OF TEAMWORKALL
REFERENCES MIKE HARFERT, KMM CORP 972-***-****
JERRY ROBINETTE, 865-***-****
MIKE WILBANKS, BATTERYCORP INC FACEBOOK MESSENGER