Dear sir or ma’am

The accompanying resume accurately reflects my employment history; however, it only begins to suggest the high levels of energy and strong degree of dedication I bring to all assignments and projects in which I am involved.

Throughout my career, I have worked effectively with management and staff at all levels of experience.

Most importantly, I have demonstrated my ability to meet the needs of others with professionalism and respect. These qualities coupled with my commitment to perform to the best of my ability are my major assets, and I am confident I will qualify as an excellent candidate for your review.

I would welcome the opportunity to meet with you and discuss any current or future positions your company may have available. If you would like to schedule an appointment to interview or do a phone interview, please feel free to contact me with either of the numbers I have listed with my resume or through email as listed as well. I appreciate your consideration and time in reviewing my resume; I look forward to hearing from you soon.

Sincerely,

Johnathan Zeekaf

Internal

Johnathan Zeekaf

9608 Meadowick Dr

Beaumont, TX 77706

409-***-****

**********@*****.***

Objectives

To obtain a position within a company to utilize my organizational, planning, management, and craft experience to its fullest capacity.

Experiences

NCCER plus Pipe / Excel / IPS / P6 / mobideo

02/2024 Present –T/A Planner Toadfly Professionals – Port Arthur, TX Job walks in the field to take pictures to plan scope of work and build job packages for clients and contractors performing the work duties, that include PID’s, Plot Plans, spec sheets, Isometric drawings, equipment data sheets and creating BOM’s. Ordering material for Heaters, drums, exchangers, Pressure release Valves, mechanical valves, Fin Fans, as well as piping details jobs. Attend weekly meetings with the clients to go over progress and Plan of the week. 01/2023 01/2024 – Piping Coord. / Planner AP-Vantage -- Denver, CO Plan out scope of work additions and work orders using SAP. Build work packages for the clients and the contractors that are performing the work, verify material, and perform a job walk down with contractors performing the job. I sit with the scheduler and tie in logic for the work activities and review the schedule. Execution Coordinator for the T/A 07/2022 11/2022 – Piping/Mech. Construction Manager Tepco--Baytown, Tx Oversee the activities for multiple companies, coordinate the execution for the piping, valves, PRV’s, and control valves scope of work. As well as the exchangers, towers, vessels & drums. Resolve any hold points that the subcontractors encounter, update the schedule of the daily progress and make sure everyone is working productively as well as safely. 03/2022 06/ 2022 T/A Zone Planner NES Fircroft – Port Arthur, Tx Using the IPS system to tie in the work orders and closure forms to the P6 schedule, creating CHITS for the coordinators, updating the schedule in the IPS, and tracking all the progress at the end of the shift.

11/2021 3/2022 – Piping Coordinator PTS Advance – Port Arthur, TX Managed and oversee the activities for the Gas Hydro treater, coordinated the execution of the piping work scope, updated daily schedule progress, served as a point of contact for resolution for RFI, and took ownership of all processes associate with the execution of field work. (Permitting, roadblocks, material issues, prioritization of shared resources, etc.). Make sure that everyone is working safely. Internal

08/2018 10/2021 – Superintendent Performance Contractors – La Porte, TX Building a High-Density Polyethylene Plant by installing various piping systems that range from sizes

” to 36” pipe as well as installing supports and specialty valves. Get the scope of work from the clients, organize a work path forward for craftsman to complete scope of work in a timely and quality standpoint but also never deviating from safety.

06/2018 08/2018 – Pipe General Foreman Amec Foster Wheeler – Carrolton, GA We analyze engineering drawings and diagrams to construct and install piping systems, supports, and other industrial components. I managed crews of skilled labor and organized their work to efficiently complete the goals of our upper management and clients to ensure a timely and adequate completion of project scope within quality and code requirements. All while maintaining a safe environment for our crews. Internal.

06/2018 – Superintendent Strike-Charleston,WV

Building a Natural Gas Compressor Station for Kinder Morgan. Oversaw the night shift where we worked on pipe ranging from 2” to 36” welding and bolting up lines to the turbine as well as to the live gas line. My responsibilities were to rollover with day shift and plan the activities for the night and assure that we completed the work scope that was left for us while keeping my employees safe. 07/2017 01/2018- Planner Zachry - Corpus Christi, TX Walk out work orders, step out job plan in SAP, identify blind points and isolation points, crane needed, insulation removal, heat trace, scaffolding if needed, Build work package for the contractors, Order material.

08/2016 07/2017 – TA Planner Repcon - Corpus Christi, TX Receive work orders that are generated and walk down the unit to locate exchangers, towers, vessels, valves, PSV’s, piping, and Fin Fans. Gather all drawings and details on equipment to make a folder for every work order, take pictures of equipment, generate BOM /Bill Of Material to order and send out, create a template on IPS software and process for all the job steps associated with the job for the schedulers to input into P6, Get quotes on items that have a long lead time to arrive, attend meetings for the T/A groups, make blind list on P&ID’S for the packages, Perform walk downs with all contractors of locations of work to be performed.

02/2016 8 /2016- TA Planner TGE- La Porte, TX

Track progress of all contractors during the T/A, update spread sheets, gather manpower, hours it took to do the job and start time of the task as well as the end time of the task, walk job scope and drawings in the field and plan out the work, figure out man power hours, scaffolding needed, insulation removal and re- install, electric and steam tracing to disconnect and install, cranes needed for the job, materials needed for the job according to the specs. Make field packages for walk down, make templates for the job steps in a workorder.

06/2015 2 /2016- General Foreman Turner / Corpus Christi, TX - Port Arthur, TX To get the job scope for the day, make sure the crews have the material they need to complete the job scope in a safely yet productive manner, attend daily meetings for coordinating jobs for the following days, and was over all the external piping for 17 heater jobs as well as the wall burners, floor burners and the coalescer piping.

Internal

04/2015 6/ 2015 -Foreman J V Driver - Freeport, TX To build piping systems per scope on a new construction project, to walk and punch out systems for the client, and to attend daily meetings for coordination of the safety and production of the crew. 02/2015 4 /2015 – G.F. / Supt E.T.S. - Corpus Christi, TX Attend meetings with the clients to ensure the scope of work is and has been being met. Implement best- practice methodology for safe execution of work scope per client’s schedule. Proactively ensure workforce needs are fulfilled as needed.

12/2014 2 /2015 – Foreman KBR - Beaumont, TX

Scope of work consist of repairing old process lines with new piping, managing and supervising multiple crafts and assure the work was completed per scope safely. 11/2014 12/2014 - General Foreman E.T.S. - Wynnewood, OK Plan and supervise craft foreman and activities, actively support the company’s commitment to core values and ensure the adherence to its code of business conduct and ethics. Internal. 06/2014 11/2014 – Foreman Bechtel - Cameron, LA

Oversaw the nitrogen and hydro testing of LNG project piping systems. Directed the fabrication and installation of small (<10") bore piping.

04/ 2014 06/ 2014 – Coordinator TGE Industrial Services. - La Porte, TX Walking lines and systems to assure timely and accurate completion per client requirement, tracking progress across multiple contractors to assure goals are met as the schedule dictates. 06/2013 04/2014 – Foreman / G.F. Shelby Gaudet, Wanzek, Matrix Keystone XL Pipeline – management across multiple contractors to plan, construct and execute multiple scopes of work and craft. Organization and communication between client compliance management and contractor side operations.

2006 2014 – Craftsman / Foreman / General Foreman Bechtel, Performance, Triple S, Turner Industrial, JV, PCL, Signature, Ohmstede Industrial, Con am Construction, Ladner Mechanical, Ram-Tech Industrial, DZ Atlantic, Conex Scopes of work include but are not limited to management and supervision across craft specialties, organization and materials delivery for construction, layout, and planning for construction of industry and hands on craftsmanship in the construction process