Post Job Free
Sign in

Hse Manager Site

Location:
Dammam, Eastern, Saudi Arabia
Posted:
February 01, 2025

Contact this candidate

Resume:

CURRICULUM VITAE

(With** +** Years of working experience in on shore environment as Safety superintendent.)

1.Candidate’s Name : ABDUL SATTAR PK

2.Proposed Project Position : Site HSE Manager / shutdown/ construction

3.Candidate’s Employer: Petroleum, Chemicals & Mining Company

4.Date candidate will be assigned to this Project: 21st Oct,2017 Till May 2020

5.June 2020 assigned to Royal commission project Jubail

6.July1 2021 assigned to sasref oil refinery company Jubail

7.Confirmation of Candidate’s capability in written and spoken English: Good

8. Current work location: JUBAIL

9. Total Work Experience: +25 Years

10.Educational qualifications: Bachelor Of Commerce & Diploma of Associate Engineering (Mechanical)

Sr. No

University

College Degrees

Discipline emphasis

Professional Certifications

Year

1

Karachi University

Karachi University

Finance & Administration

B.Com

1992

2

Karachi University

Karachi Ship Yard College

Mechanical engineering

Diploma

1996

3

NEBOSH

Saudi Arabia

NEBOSH IGC

Nebosh International General Certificate

2013

S.N

Job Title

Project name

Client

Brief Description

Start of Project

Finish of Project

No. of Years in each job title

Month/ Year

1

2

3

3

Site HSE Manager

Site HSE Manager

Site HSE Manager

Site HSE Manager

SASREF

Royal commission Jubail Rasalkhair

Farabi yanbu

UMM WU’AL PROJECT RAS AL KHAIR MA’ADEN DAP/NPK PLANT

Sasref

Royal commission

L&T Lerson &Tubro Saudi

Ma’aden Phosphate Company Ras alkhair

Shutdown project work

Long term permanent maintenance contract with sasref Aramco oil refinery.

Site hse manager roll played as mention below

Site hse manager roll played same as below yanbu,

Civil,Electrical,mechanical,piping fabrucatin,erection works

Monitors the implementation of the requirements of Safety Management Plan and arrange continuous and formal daily safety monitoring to ensure compliance and effectiveness.

To liaise with and support Area Engineers/Superintendents/Supervisors to promote safety awareness in their area of responsibility.

To detect, identify, analyze, control, eliminate and recognized hazardous acts, condition, behavior and violation.

To investigate and report immediately in writing all accidents, unsafe acts, near misses occurred at work site and the report shall be submitted immediately to the concerned personnel.

Monitoring the implementation of completed Risk Assessments.

Monitoring the correct usage of safety barriers, including timely removal.

Assists in preparing toolbox talk subjects for the supervisors and monitor its compliance.

Responsible in issuing detailed weekly/monthly safety reports including all accident/incident, hazards and near-misses observed, manpower, man-hours worked and submit to concerned personnel.

Involved in ensuring safety discrepancy logbook is posted in each work areas, its location can be easily noticed/accessed and the supervisors review the logbooks on regular basis to take the necessary corrective action.

To participate in the weekly safety audit inspections and to ensure that all the unsafe acts/conditions reported are corrected.

Coordinates with Client Safety management team.

Involved in preparing and issuing Final Safety Report for the Project.

May 2021

Jun 2020

Oct 2017

Jan,2016

Dec 2022

Feb 2021

May 2020

Sep,2017

7 Month

18 Month

29 Month

21 Months.

2

construction Manager HSE

LUBEREF YANBU REFINERY EXPANSION PROJECT

LUBEREF

As Above

Mar,2013

Jan,2016

21 Months for three projects.

3

Site HSE,C Manager

YNGL ARAMCO PROJECT YANBU

Saudi Aramco (Under SABIC)

As above

Mar,2015

Jan,2016

09 Month

4

Site HSE,C,Manager

IBN RUSHD II U&O PROJECT (Under CTCI)

IBN RUSHD

As above

Mar,2013

Jan,2015

15 Month

5

Superintend /Manager

CIVIL WORKS – POLYETHYLENE PLANT - SHARQ 3RD EXPANSION PROJECT

(SHARQ)

As Above

May,2011

Feb,2013

20 Months

6

Superintendent

GULF FARABI PARAFFIN AND LAB PLANT PROJECT

GULF FARABI PETROCHEMICAL COMPANY (UNDER SNC LAVALIN)

Responsible for Coordinating Activities for the Loss Prevention of Human being and Material Resources at Site. The Development of Safety Plan. Ø Audits / Inspection with report preparation. Ø Various Training with Record Keeping and schedule preparation. Ø Publicity of Safety Program Ø Incident Investigation and Report Preparation Ø Arranging and addressing the tool box talk and supervisor’s meeting. Ø Record keeping of Inspection for Power Tools, Heavy Equipment, Vehicles and Lifting Gears. Ø Ensure that Safety Posters and Sign Board are posted in Prominent and Appropriate location. Ø Monitoring the different site Check Lists to evaluate and measures HSE Performance against identified standards and to ensure compliance with the site safety policy. Ø Prepare Job Safety Analysis and risk Assessment for Critical Activities. Ø Ensure that waste management being adhered to. Ø Ensure that necessary safety and survival Equipment is available and vehicles are in operational condition Ø Ensure that environmental requirements in the construction Sites are adhered. Ø Prepare Handouts and Booklets, News, Letters and other information for Distribution to Project Personnel. Ø Supervise the Implementation of the Plans and program assigned to the Safety Officers and supervisors in the field. Ø Monitor all medical and accidents cases for the purpose of analyzing Trends and patterns. Ø Ensure that fire and safety equipment are available / serviceable and that stock for vital parts are at hand. Ø Attended Co-ordination meetings involving company, client, and sub-contractors management. Ø Arranging, Conducting and reporting the emergency mock drills at site and camp.

Jan,2010

April,2011

16 Months

7

Construction Superintendent

UNITED OLEFINS COMPLEX PROJECT – GENERAL CONSTRUCTION & OSBL

JUBAIL UNITED PETROCHEMICAL COMPANY

As above

Aug,2007

Dec,2009

28 Months

8

Superintendent

DE-BOTTLE NECKING PROJECT

YANPET

As above

Dec,2005

July,2007

20 Months

9

Construction superintendent

ROYAL COMMISSION SWC SIPHON REPAIR AND OFF TAKE STRUCTURE

Marafiq KRT 1

Dec,2003

Oct,2005

22 Months

10

Supervisor

Fabrication

IBN-ZAHR COMMON FACILITY UPGRADE PROJECT

IBN-ZAHR

Site Monitoring & Implementation of HSE Protocols.

July,2001

Nov,2003

28month’s.

MAINTENANCE / SHUTDOWN PROJECTS:

11.PROFESSIONAL WORK EXPERIENCE IN DESCENDING ORDER:

a.SINCE EMPLOYMENT WITH CONTRACTOR PETROLEUM, CHEMICALS & MINING COMPANY (PCMC)

10.1IBN ZAHR PP-1 AND PP-II SHUTDOWN TCTA

Overhauling of Heat Exchangers (42 No’s), Vessels (44 No’s), Columns (5 Nos.), Reactors (02 No’s), Filters (20 Nos.) at PP1 & 2 Plants during TCTA. Shutdown duration 13 days.

10.2SADAF EDC SHUTDOWN

Shutdown duration 28 days. Worked as a safety supervisor with Sadaf for their EDC shutdown June 2004.

10.3PETROKEMYA VCM T/A

Turnaround and inspection of 10 – Columns and replacement of 02 – Bundles, 02 – Heat Exchangers, 02 – Fin Fan Coolers. Shutdown duration 10 days

10.4PETROKEMYA OLEFINS – 1 SHUTDOWN

Turnaround and inspection of 17 - heat exchangers and 05 – Columns. Shutdown duration 10 days

10.5SASREF OPR SHUTDOWN

OPR Major Shutdown: Turnaround and inspection of 91 - heat exchangers, 47 - Fin fan coolers, 16 – Columns, 11 – Furnaces, 5 – Reactors 14 - Tanks, 72 – Vessels, 24 – Valves, among other stationary equipment and huge quantity of defects job in Aromatic Unit. Shutdown duration was 17 days. Peak Manpower 1300.

10.6SHARQ 1-EG/1 & 2-UTILITY SHUTDOWN

Turnaround and inspection of 68 - heat exchangers, 15 columns, 36 Vessels, 178 Valves, and Various miscellaneous equipment in 1 EG & 1 Utility Plant (10 days S/D). Total Workforce – 374

10.7ARAMCO OIL REFINERY (YANBU) TURNAROUND SHUTDOWN

10.8PETRO RABIGH T/A – EXCHANGERS & COLUMNS

Exchangers and Columns

10.9SAMREF OIL REFINERY T/A

Inner screen replacement, piping renewal

COURSES ATTENDED

Safety Supervisors Course - Fluor Arabia Ltd. / JUPC Project

First Aid Training Course - Al-Mana Hospital/ ROYAL commission hospital yanbu

Basic Firefighting Course - Fluor Arabia Ltd. / JUPC Project

Hot Work Safety - Fluor Arabia Ltd. / JUPC Project

Confined Space Entry - Fluor Arabia Ltd. / JUPC Project

Elevated Work Safety - Fluor Arabia Ltd. / JUPC Project

BLS & FIRST AID - RC HOSPITAL

Leader ship certificate - JACOBS/LUBEREF

BEYOND ZERO - JACOBS/LUBEREF

REFERENCES: Will be furnished on demand



Contact this candidate