CONTACT
DUBAI, UAE 1243
*******.***@*****.***
DUBAI Driving license
SKILLS
ABB-Micro SCADA 9.2,9.3,
Siemens -WINCC SCADA and Power
spectrum
ABB- RTU 560D, RTU 520,ABB-AC-
31(PLC),Siemens
Ak-1703,Siemens A8000,Schneider T-
300,Lucy-Gemini G3,Microsol RTU
IEC-104, IEC-101,IEC-61850,AXS-4
SISCO,CP-16,
SYS 600 C
RTUTIL,CPTT, TMW, Wireshark, IEC
tester, SICAM device Manager
LANGUAGES
PERSONAL DETAILS
Date of Birth / Age: 21/10/1986
Nationality: INDIAN
PROFESSIONAL SUMMARY
Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
EDUCATION
Engineer's degree: Electronics, 04/2004 – 06/2008
Shri Sant Gadge Baba College of Engineering – Maharashtra-INDIA – Distinction
WORK HISTORY
SCADA Engineer
Dubai Electricity and Water Authority - DUBAI, UAE Analyzing -Tendering document Evaluation, Pre-Qualification of RTU, Drawing review and providing the feedback.
Performing FAT, SAT and Point to point test with contractor. Successfully commissioned RTUs under Distribution Automation Projects.
1. Schneider T-300 RTU using Easergy builder under DA Project Commissioning of 300 RTUs.
2. LUCY RTU using Gemini G3 tool under DA project commissioning of 500 RTUs.
3. LUCY RTU using Gemini G3 tool under DA CSH project commissioning of 25 RTUs
4. ABB RTU 520 using RTU Til500 SRM 20000 DA project commissioning of 2000 RTUs.
5. ABB RTU 520 under DA1500 pahse-1 Project commissioning of 1500 RTUs.
6. Siemens A8000 RTU using SICAM Device Manager under DA phase-2 project 1500 RTUs (under progress).
7. OHL pilot project Auto recloser and ALS using Siemens A8000 RTU
(under progress).
Attending call duty 24/7 on emergency.
Achievement -Awarded Four times for the best employee of the month SCADA-RTU Engineer
National Contracting Company Limited - Dubai, UAE
• SCADA/HMI
• RTU
• Communication Protocols
• Tools
English
Intermediate
Hindi
Intermediate
Marathi
Intermediate
Santosh Maurya
• Backed hardware team during technical meetings and formal reviews. Maintained project records, manuals and diagrams for comprehensive referencing.
•
Undertook testing and validation of manufactured designs for meeting quality standards.
•
Document Review/Comment and submit/coordinate with Client. Support/coordinate SCADA and related System commissioning with sub-contractor.
•
11/2012 - 06/2014
02/2010 - 07/2012
08/2008 - 06/2010
Marital Status: Married
Visa Status: Working VISA
Gender: Male
Religion: HINDU
Passport: V2912314
Consulting Engineer
Kalkitech Communication Private Ltd. - Bangalore, INDIA It includes two-substation 132/33kv Sonrai and Bara Sub-stations. Communication of SEL Relay to HMI Server and Local End-to-End Testing of I/O Signals. Trouble shooting of CP-16 protocol convertor. Pre Commissioning of SCADA for the bay level 220kV, 33kV and 11kV. Using Software Siemens WinCC, OPC - AXS4, Kalkitech CP-16 Protocol Convertor. Which includes two substation LBSS-6 and MRS. RTU Engineer
Reliance Airport Metro Express line - DELHI, INDIA Maintenance Trouble shooting of Siemens RTU AK-1703 using Software toolbox.
Project RTU Engineer
Incisive Technology - MUMBAI, INDIA
Preparation of Single line diagram SLD and Data base configuration-using software ABB Micro Scada 9.2. RTU configuration by using Software ABB RTUtil.
Testing of End-to-End communication by using CPTT comport ware
(protocol analyzer) testing tool. RS 232, RS485 and Moxa device convertor used for the communication of RTU to SCADA Server
Local End-to-end testing of RTU to SCADA Server and Final Testing with Client. Signal List I/O cable preparation and obtaining a final approval from client.
Configuration and Troubleshooting of RTU 560D
Installation Testing and Commissioning of SCADA System for B.E 4&5 Project. Description: In this ongoing project stages involves Installation, testing and commissioning of SCADA system for B.E 4&5 Project to supervise, control, and acquire the various specified data from the
‘controlled station' such as Receiving substations, Auxiliary Substations, Traction and auxiliary networks,
Commissioning and upgrading work of RTU 560A in Co-ordination with Subcontractor for END Client. GE Harris RTU refurbishment work
•
• Client- Tata consultancy service (TCS) Jamshedpur. Worked as SCS Engineer for the End Client Qatar Petroleum. Testing and Commissioning of 33kv Sub Station Dhukan Site. Using software tool Micro SCADA 9.3
•
• Worked as Substation Automation Engineer for Siemens VSP. Worked as SCMS Engineer for the End Client Federal electricity and water Authority (FEWA), Sharjah Electricity, and water Authority (SEWA). Testing of Substation Automation System for FEWA and SEWA 132/33KV S/S.
•
Client -Siemens Bilhai steel Plant
Trouble shooting of communication issue in IEC61850 SCADA. Client -Bilhai steel Bharat Heavy Electrical limited Fiber optics FO-Cable laying and LIU splicing work for IED-to-IED communication of relay.
Site survey for the installation of AMR Meters in the substations.
•
Maintenance and troubleshooting of Siemens SCADA Server Power Spectrum CC and RTU AK-1703.
•
Maintenance Trouble shooting of ABB Substation Automation Server in 132kV station RSS.
•
Project Engineer for the End client Delhi Metro Rail Corporation Ltd
(DMRC)
•
Metro stations, switching stations (Sectioning Post, SSP) along the Line, Depot etc.
Testing and Commissioning of RTU and handled the following tasks: Preparation of Single line diagram SLD and Data base configuration-using software ABB Micro Scada 9.1. RTU configuration as per customer requirement.
Protocol convertor used for Modbus to IEC104 via Kalkitech protocol device convertor. Interfacing of the controllers to communicate with the Control center through IEC104 protocol.
Software Used: Micro SCADA Pro 9.1 and ABB RTU AC-31(PLC)
• Worked as Project Engineer for the End client TATA POWER MUMBAI.