ROCKY ALFARIS
PROJECT MANAGER / SR.ESTIMATOR
I am Professional Project Manager or Estimator EPC with over 23 years of experience leading and a team or individual environment.
EDUCATION
B.Sc. in Civil Engineering
Baghdad University 2002
Evaluated and Registered in
USA by World Education
Services
Approved by the Texas Board
of Professional Engineers and
Land Surveyors for the PE
License.
KEY SKILLS
Management
Engineering
Estimating
Quality Control
Cost Control
Scheduling
Contracts
Pipeline
Heavy Civil and Power Plant
Solar & Renewable Energy
Strong Communication
Strong Computer Skill
Team building
CONTACT
******.*****@*****.***
5807 Orchard Trail Dr
Pearland, TX, 77581
EXPERIENCE
PROJECT MANAGER /SR. ESTIMATOR– LSC ENGINEERING &
HENKELS & MCCOY
MID STREAM & FACILITY EPC
- CONSUMERS ENERGY Northville Lyon 29 34 Liquid Handling Facility Operations Building DESIGN & BUILD EPC
- CONSUMERS ENERGY Overisel Storage New Well Line O-305
- CONSUMERS ENERGY GRAND BLANC JCT VALVE AND
METERING REPLACEMENT
-CONSUMERS ENERGY Overisel CS OVC Phase 4
-DTE - Consumers Energy Orion Township Interconnect 226205
-DUKE 2025 5th and Philadephia
-DUKE 228-***-**** Dayton Valve House and Third & Crescent
-DUKE 228922025 Okland Valve House IP Reg Station
-DUKE TFO Clough & Lindale Bid 228***-****
-DTE Reno Open Cut T-RTN-00048
-WG Rockville CNG Unloading Station
Roles & Duties:
• Oversees and leads the execution of engineering projects.
• Ensuring the engineers completed on time, within budget, and to the client's satisfaction.
• Managing communication and coordination among engineers and stakeholders.
• Supervise and line out all people on the bid team.
• Provide adequate information to team members and establish bidding schedule with deadlines.
• Perform final reviews before bid due date.
• Review all work performed by team members.
• Gather proposals, blueprints, and specifications
• Identify labor, material, and time requirements
• Compute costs by analyzing labor, material, and time required.
• Review and analyze construction documents and specifications
• Maintain relationships with key vendors and subcontractors
• Estimate Designers Hours needs.
• Create takeoffs from blueprints
• Prepare and submit accurate and competitive project bids and proposals
• Assist in the development of project schedules and timelines
• Solicit subcontractor and/or supplier quotations or scheduling input as required for the assignments
• Participate in plan review and estimate reviews for the projects
• Assist in compiling historical cost data for projects
• Confirm list of subcontractors/suppliers proposing on the project
• Collaborate with Architects/Engineers to request clarifications or additional information
2024-2025
PROJECT MANAGER – PRIMORIS ENGINEERING MID
STREAM & FACILITY EPC
2014-2024
- SABER MIDSREAM – Pelican L Natural Gas Line Texas, USA (2023-2024) EPC
- SABER MIDSREAM – Matterhorn A Natural Gas Line Texas, USA (2023-2024) EPC
- SABER MIDSREAM – Matadore A Natural Gas Line Texas, USA (2023-2024) EPC
- TPC GCAT -2024 TANK Upgrade,Docks and Refrigeration ( 2022-2023)
- Air Product H2 Plant & Substation Texas City, TX, USA (2020-2022)
- Linde North America (Hyco Plant), Pasadena, TX, USA, (2019-2020)
- MEGlobal, Monoethylene Glycol (MEG), Freeport, TX, USA (2018-2019)
- Air Products Hydrogen CO Plant, Baytown, TX, USA (2017-2018)
- Air Liquide ASU Plant, Beaumont, Texas, USA (2016-2017)
- Natgasoline's Methanol Plant, Beaumont, TX, USA (2015-2016)
- Fortres Energy LNG Plant, Miami, Florida, USA (2015-2016)
- Stabilis Energy LNG Plant George West, TX, USA (2014-2015) Roles & Duties:
• Ensuring contract deliverables, schedules, and project budgets are met.
• Prepare proposals, assist in presentations, and participate in contract negotiations.
• Provide overall management of projects from concept to completion including but not limited to siting, environmental, permitting, planning, estimating, engineering, project controls, bid phase services, procurement, constructability reviews, material management, construction management, and closeout.
• Develop and monitor project schedules, manage scope, and control project costs.
• Own internal project financials (detailed, accurate project cost forecast and accruals), staffing/resource forecasts, legal coordination, risk management, change management, and human resource issues.
• Serve as the primary point of contact with clients regarding efforts such as client coordination, strategic planning, scope management, budget finances, subcontracting, project staffing, environmental compliance, facility support and schedule attainment.
• Manage all aspects of project communication.
• Direct and coordinate activities of several disciplines on a project of moderate scope or a combination of smaller projects
• Work closely with the Project Team to ensure deliverables and services are being provided to client’s satisfaction and that projects are following internal QA/QC guidelines.
• Report regularly on progress, cost and schedule metrics, procurement issues, safety or environmental concerns, design questions, potential impacts, and any issues requiring office support
• (OCT2012 UP TO SEP2013), INFRASTRUCTURE
CONSTRUCTION MANAGER. (RUWAIS COMPLEX ABU
DHABI OIL COMPANY PROJECT)P12 (12) NOS.
Buildings G+11 with infrastructure services, Abu Dhabi, UAE $100 million
• Supervising the construction facilities of the following items.
•
• Services Buildings, Utility buildings (water tanks, chillers yard, LV room, RMU room), Sub Stations buildings including all super structure items and infrastructures.
• Sewerage deep line network, main manholes, collecting chambers, elect regards.
• Chillers main lines, valve chambers, thrust blokes, road crossing ducts, elects regards.
• Road work, land scab, soft scab.
• Potable water network, Manholes, Road Crossing Ducts.
• Fire Fitting network.
• Irrigation line network, Valve champers, Road Crossing Ducts (irrigation reservoir tank).
• LV, HV, LC, TEL, FA TV network chambers, road crossing ducts.
• (AUG2009 UP TO OCT2012), CONSTRUCTION MANAGER
INFRA. (RUWAIS COMPLEX ABU DHABI OIL COMPANY
PROJECT)P6B, P6C (24) NOS. $200 MILLION
Buildings G+8 with infrastructure services, Abu Dhabi, UAE
• Supervising the construction facilities of the following items.
•
• o Services Buildings, Utility buildings (water tanks, chillers yard, LV room, RMU room), Sub Stations buildings including all super structure items and infrastructures.
• Sewerage deep line network, main manholes, collecting chambers, elect regards.
• Chillers main lines, valve chambers, thrust blokes, road crossing ducts, elects regards.
• Road work, landscape, softscape.
• Potable water network, Manholes, Road Crossing Ducts.
• Fire Fitting network.
• Irrigation line network, Valve champers, Road Crossing Ducts (irrigation reservoir tank).
• LV, HV, LC, TEL, FA TV network chambers, road crossing ducts.
•
• (AUG 2006 TO SEP 2009), CONSTRUCTION MANAGER INFRA. 200 MILLION $
(JUMERAH PARK INFRASTRUCTURE PROJECT). (NAKHEEL).DUBAI, UAE Supervising the construction facilities of the following items.
• Construction and installation of 90 substation units serving 3000 villas.
• Sewerage network (main lines pipelining, manholes, house connection pipelining and their chamber, hunching of the covers, FIC lines).
• Road work.
• Water line network.
• Irrigation line network (irrigation reservoir tank).
• Substation buildings.
• o Irrigation reservoir.
• o Lifting station.
• (OCT 2002 TO AUG 2006), PROJECT ENGINEER. 1 BILLION $
(BAGHDAD SOUTH 250 MW GAS POWER STATION#1). (G.E POWER COMPANY).
BAGHDAD SOUTH 600 MW GAS POWER STATION#1). (G.E POWER COMPANY).
Oversight of Engineering, Procurement and Construction (EPC) projects, exceeding customer expectations.
• Construct and Install power station of 250MW natural gas firing.
• Construct and Install power station of 600MW natural gas firing.
• Install all the control panels, cables, trenches, grill covers and commissioning, testing for the administration buildings, control buildings, Substations ).
• Installed firefighting pipeline with metering and all the control board and E&I system gas conditioning yards, meeting all PHMSA requirements.
• Installed natural gas pipeline that feeds the gas power station with metering and all the control board and E&I system.
• Analyses the results and issues the reports.
• Super structures, Road work, infrastructure utility Buildings of the power station, Piles work.
• Piles work, Superstructure construction, (administration buildings, control buildings, turbine foundation).