Post Job Free
Sign in

Site Management Co-Ordinator

Location:
United Kingdom
Posted:
March 23, 2025

Contact this candidate

Resume:

Name:

DAVID ODE

Current Address

D.O.B

Contact Numbers

Email address

The Old Police Station, High Street, Llannerch-y-medd, Anglesey, North Wales UK LL71 8EB

**-**-****

Home 012**-******

Mobile 074********

**********@***.***

Qualifications:

Site Managers CSCS Black Card

NVQ Level 6 Site Management including Tunnelling

TBM

SCL/NATM

M&Q Deputies Certificate

M&Q Plant Trainer

360 above & below 10T excavator Blue Card

Temporary Works Co-ordinator

IOSH

SMSTS

Full Medical with D & A (2024)

CSCS Skilled work Card,

Great Boss Scheme

Tunnelling Operations Accreditation A

Safety Awareness Trainer

Shot Firing CSCS Gold Card (expired Jan 2021)

LGV CE, C1E Driving License

CPC card

Digi card

English language

Yes

Started a German language course

Current Position:

2021-Ongoing

SCS Railways HS2 Northolt Tunnels

2 x EPB 10mt dia x 8klm tunnels

Senior TBM/Cross Passage Superintendent

Planned and designed all teams shift patterns

Overall control of all daily works and TBM operations at West Ruislip Portal tunnels

Daily meetings with senior tunnel management teams

TBM drive instructions discussed before every shift and then passed onto the various teams involved

ie: TBM drive teams

Tunnel backup teams

Logistic tunnel teams

Segment yard teams

Conveyor/spoil storage teams

Surface logistic teams

Daily Briefings, RAMS, TBT

Start of Shift/end of shift reports

TBM cutter head Intervention planning

Weekly meetings with all Pit Bosses

Looking at future training requirements for all the various teams

Cross Passage excavations

All SCL and cross passage concreting works

West Ruislip Northolt Tunnels London

HS2 SCS Railways Project

Key Experience :

I have worked for Cementation Mining/Skanska on and off for over 40 years and have extensive hands-on experience, proficient in ground water control, high pressure grout injection against major water inflows gained by working on civil, mining TBM drives and NATM/SCL tunnelling projects around the world.

Including all aspects of Civil ground engineering & building works

Concrete/shuttering works involving construction of Tunnel portal and diaphragm walls,

I have played a key role as Site Manager in carrying out several large tunnel refurbishment projects for both National Grid Transco (NGT) and Network Rail.

Apart from projects at Winsford Salt mine, the Isle of Grain power station, Parys Mountain in Anglesey and Conwy, my work has taken me to Ireland, Hong Kong, Turkey, Malaysia and India.

I have experience and skills in large scale civils engineering works, i.e.: concrete works shuttering works, also operating and training on various plant i.e. Eimco Rocker Shovel, Cat Loader, Various Drill Rigs, Loco’s, TBM’s and Cryderman operating units. I am competent in hard rock tunnelling, shaft sinking, high pressure grouting, shotcreting, control of water inflows, TBM drives, drill and fire, NATM. I am a committed team member and my supervisory skills have been utilised in the training of local labour on various plant and equipment such as twin and single piston Hydro/Electric High Pressure grouting units, Pneumatic grouting units and 110volt Chemical grout pumps.

Career History:

2021 to 2021

SCL/Concrete Inspector OTB engineering

Euston Station London

Surface preparation works concrete the shaft collars

Prior to the shaft sinking starting

SCL inspections as the shaft and tunnels progressed

2019 to 2021

SCL Inspector Shafts and Tunnels

Tideway Tunnel

Ferrovial/Laing O’Rouke Central Section

London

2019 to 2019

TBM/SCL/Superintendent

Balfour Beatty

Hinkley Point C

Tunnelling & Shaft Sinking operations

Shotcreting and concrete works

SCL Operations

2015 to 2018

Works Manager- AMCO-GIFFEN

Day to day planning of Tunnel repair work on the west coast main

Line, involving investigative drilling through the tunnel lining to

Locate hidden shafts, shaft repairs, concrete repairs, grouting works,

Interface with the Client and Sub-Contractors

Method Statements and Risk Assessments

2014 to 2014

General Superintendent-Leighton Chenani-Nashri Tunnel India

Planning and control of all tunnel operations for the 9.8klm x 14mt x

8mt road tunnel

NATM

Drill & Fire

Concrete lining works using large scale mobile shuttering

2005-2014 Works Manager/Site Manager-Skanska Specialist Division

London Crossrail TBM Drives

Tara Mine Navan Ireland and overseeing the TBM drives under London

Control of day to day planning for standpipe installation,

Probe drilling to 100mts to locate high pressure water Aquifers

Pressure of 92 bar have been encountered with the average

Pressure of 65 bar, High Pressure grouting to 120 bar

2000 - 2005

Chemical Grouting, Planning and control of Installation of

Rock-bolts/Mesh/Shotcreting

Using NATM/SCL in poor ground conditions

Install large air flow doors within the mine, using shuttering, concrete and Steel framed metal doors.

Method Statements, Risk Assessments, Monthly Safety reports, Daily reports

Works Manager - Skanska Civil Engineering – Tunnelling Division

CTRL 230, 240 and 440 projects. Day to day management of sub-contractual work including TBM drives, NATM/SCL,

Concrete works as and when required, Shotcreting, drilling, Water inflows and high-pressure grouting. Plant instruction – 360o swing shovel, JCB teleporter, mariner, shotcrete plant. TBM drives

Folkestone Railway tunnel repairs

1998- 2000

General Superintendent – Kvaerner Cementation

Duties included supervising concrete pours, TBM drives, NATM/SCL tunnelling, shaft sinking, tunnelling, drill & fire, Shotcreting, Control of water inflows, high pressure grouting and shot-firer.

1997 - 1998

Superintendent – Kvaerner Cementation

CBI Cayeli Mine Shaft Project, Turkey

Instruction of local labour in plant operation on drill-rigs, Cryderman, teleporter ad 360o swing shovel. Also, shaft sinking, NATM tunnelling, drill & fire, Shotcreting, Water control, high pressure grouting, shot-firer.

Supervising the concrete lining of the shaft using steel tubbing shutters in 6 circular sections, so a 6 mt deep pour of concrete sent through steel pipes into the shaft which was approx. 1500mts deep and then a large loading pocket cut out of the side wall of the shaft approx. 15mts x 20mts with concrete base and walls

1996 - 1997

Superintendent - Cementation Ireland Ltd, Galmoy Mine

Duties included shaft sinking, NATM tunnelling, drill and fire, Shotcreting, Water control, high pressure grouting, shot-firer,

concrete works on the surface to accommodate the surface works prior to the tunnel/shaft works starting and concrete works in the under ground areas where work shops were constructed for plant maintenance

1996

Superintendent / Co Liaison Officer, CMEC International Ltd, Hong Kong

Wet Shotcreting with MBT Robojet. Instruction in operation of plant, Teleporter, concrete, mixing trucks, mariners, 360o swing shovel. Water control & high-pressure grouting. TBM Drives

1995 - 1996

General Foreman / Superintendent – Skanska International AB, Hong Kong

Duties included TBM Tunnel Superintendant. NATM, Shaft sinking,

(Drill & Blast) Shotcreting, grouting, shot-firer.

1994- 1995

General Foreman / Superintendent – Kvaerner/Cementation

Pergau Dam Malaysia

Day to day planning and control of all tunnelling operations

1990 - 1993

Shift Boss / Supervisor - Donelons Limited, Bristol Sewage

Duties included Tunnel Supervisor NATM tunnelling, three boom GD drilling rigs, (Drill & Blast) operation of various plant, 3 boom Tamrock, 360o swing shovel, dumper, Teleporter, Haggloader and TBM. Also, Shotcreting, and shot-firer.

1971 - 1990

General Foreman / Supervisor - Cementation Mining Ltd

Contracts included Parys Mountain-Anglesey, ICI Salt Mine-Winsford, various UK Sites, Peterhead Power Station, TBM drive Isle of Grain Power Station, All Drill & Blast, NATM Tunnelling.



Contact this candidate