MD RABIUL HASAN
Commissioning Engineer
CONTACTS
East Elmhurst, NY-11369
*****.******@*****.***
EDUCATION
B.SC. IN Electrical and Electronics Engineering- 2014 American International University Bangladesh (AIUB)
Credential Evolution by WES (World Education Services) M.Sc. in State University of New York at New Paltz May 15, 2015
EXECUTIVE SUMMARY
Work Experiences
Metrotech Consulting Services Inc, New York, NY-10016 Resident Engineer (Consultant) for MTA Construction & Development August 2020- January 2025
• Worked on MTA Construction & Development projects, coordinating with municipal agencies such as New York City Transit (NYCT)
• Reviewed and approved electrical design plans, shop drawings, and field installations in municipal transit systems.
• Any deviation of contract drawings comparing with field conditions and installation point of view Advising contractor personnel to comply with contract terms and conditions, field layout, site survey and solve issues if anything arises in the field
Team Meeting with assistant director, program director, MTA C & D personnel and other department personnel to solve any engineering issues and monitor project risks and ensure timely resolution and mitigation and recommend solutions to the senior management for the resolution of critical issues. Schedule for flagging request, General Order (G.O.) operations and coordinate with G.O owner for piggyback G.O with Force Account representative in terms of the contractors work on MTA C & D's requirements Schedule for EMD RSS Work Order and schedule with MOW Engineering, Dept. of Security, Network Operations, Contract Compliance, Infrastructure Capital Construction (ICC) in terms of contracts requirements Estimate scope of work for additional work order and negotiate with contractors or provide budgetary cost for force account and in- house forces
Estimate the electrician man-hours per month and including site safety supervisor hours, no. of flaggers and review contractor payment requisition and submit approved payment requisition to capital payment to process. Site Co- ordination meeting with other contractor representative, NYCT Personnel, Yard Administrators, Electronic Maintenance Dept. in terms of the contract requirements Scope of Work Analysis for Additional Work Order (AWO) provided by New York City Transit to the awarded contractor
• Reviewed mark up comments and distribute collaborative responses to the contractors for Site Acceptance Testing and System Integration Testing procedure for user group final acceptance and system turn over, write memorandum of understanding
(MOU) for User Group Sign off & Final Acceptance
• Providing Job Progress Update to the MTA C& D designated team, MOW Engineering, EMD RSS, Net Ops, MTA IT and Contract Compliance. Check ins and outs of the field work in terms of the quality assurance and control. As an quality inspector, I always check contractor quality work plan as well as according to the National Electrical Code, National Fire Protection Association (NFPA-70, NFPA-72) Prepare close-out documents, punch list and the required documents for sign-off for C-31620
• C-52174 contract submittal review and provide response to Design Builder.
• Attend Job Progress meeting, bi-weekly quality meeting and review preliminary, advanced and final design drawings for approval and release for construction drawing to issue construction permit by Code Compliance Office A competent construction profesional with Electrical, Electronics and Tele-communication Eng. background with excellent communication, organization and coordination skills. Possessing a proven track record of preparing and executing project specifications, plans and programs, evaluating MEP systems, products, components and applications by designing and conducting research programs; applying knowledge of electricity and materials, confirms systems and components' capabilities by designing testing methods; testing properties and ensuring that work is carried out in accordance with the companies procedures and clients satisfaction. Experienced with the ability to manage large tasks while consistently paying attention to detail and implementing analytical thinking. Able to ensure timely, safe and cost-effective design and implementation during the life cycle of projects from conception till customer satisfaction. I’m looking to join a team of professional individuals and seek out new challenges while consistently executing strategic experiences and growth development.
Implement Electrical Contracting Corp.
Chief Executive Officer
Queens, New York
June 2018- Present
Estimated & Value Engineered Various non-union open shop type projects (such as 140 East 46th Street, New York, NY (Power Generation & distribution), 166 East 124th Street, New York, NY (Self Storage), 640 Columbia Street, Brooklyn, NY (Industrial- Power Generation & Distribution), 537 Columbia Street, Brooklyn, NY (Warehouse- Structured Cabling), 415 West 120th Street, New York, NY (High End New Residential Building- Ground Up Installation)
Additionally, estimated various health care projects -731 White Plains Road, Bronx, NY & Bronx Lebanon-Cancer Center, Bronx, NY.
Estimated for New Construction building for Concrete, Masonry, Foundation, Roofing & Waterproofing, Electrical, Fire Alarm (575 Grand Street, Brooklyn, NY & 1915 Beverly Road, Brooklyn, NY)
Estimated and supervised Brownstone Facade Renovation, Local Law 11 projects for Façade Inspection Work (Safe Work With a Repair and Maintenance Program) for Masonry, Stucco, Waterproofing & Roofing Repair Works (413 East 50th Street, New York, NY, 521 Greene Avenue, Brooklyn, NY-11216, 124 Columbia Heights, Brooklyn, NY-11201)
Designs, test and layout electrical plans and calculate panel loads and voltage drop calculation of commercial building and MC Cable & MI Cable Calculation (Cu/Al Wire Comparison) as per NEC Code Compliance.
Assessment of Cost Estimated Budget and maintaining thoroughly bid analysis and bid proposal submission
Value Engineered for Electrical, Fire Alarm, Low Voltage System, MEP system for Essex Crossing Site 3, New York, NY, 625 Driggs Avenue, Brooklyn, NY, 1 Vanderbilt Avenue, New York, NY- Low Voltage Cabling & Wiring (High Rise Commercial)
Analyzed scope of work for 866 United Nations Plaza, New York (Luxury Condominium), Interior Fit-out Renovation (Electrical, Fire Alarm) for 135 Madison Avenue for different floors (Low Voltage Cable
& Wiring), 63 Madison Avenue (Core & Shell)- Low Voltage System & 1230 Madison Avenue, New York, NY-10128 (Structured Cabling), 353 Bedford Avenue (Moxy Hotel)- High Rise Residential
Estimated PS 94(K) Brooklyn- Electrical Work for Air-Conditioning Unit Power Supply (Low voltage System), Switchgear Unit Installation with Replacement of Exit Signs, estimated NYCDEP JOC projects- Jamaica Waste- Water Treatment Plant-Upgrade Lighting System, Brooklyn Owls Head- Upgrade Gas Detection System, furnish and installation of 30’’ Flow Meter Installation
Ensured Quality Control for Fire Alarm Devices Installation, Electrical Infrastructure upgrades and code compliance for municipal buildings
Estimated GC & MEP Trade for Great Neck High School, Middle School, John Lewis Childs School and Floral Park-Bellerose Elementary School, Massapequa Classroom Renovations, Herricks High School Fitness Center Upgrade for Long Island School Construction Authority.
Estimated DDC Projects- Kenton Hall Shelter Fire Alarm Upgrade, Marcy Avenue Houses Community Center, worked on approved shop drawings of DSNY Manhattan Energy Efficiency project.
Worked on Conduit Routing Plan of PS 23, PS 34 & PS 72 Staten Island Projects of Camera installation and AC power supply (Low Voltage System)
Design, Test, Filing and Programming of Fire Alarm Devices and ARCS (Auxiliary Radio Communication System) as per FDNY requirement.
Directs and leads day to day management decisions and implementing companies long and short-term goals.
Inspect the Job Site and requirement for site safety and maintain DOB Code and compliance as per project location and OSHA Standard.
Senior Electrical Estimator (Contract Position)
Peter J Catanzaro Inc.
126 41st Street, Brooklyn, NY-11232
March 19, 2018- May 19, 2018
Estimated various NYC Department of Parks & Recreation Projects (such as Canarsie Park, Juniper Valley Park, Stapleton Playground, Fairview Park, Bowne Pond, Jackie Robinson Park & Flushing Meadows Corona Park and so on) in 5 Boroughs of New York. Especially Park Security Lighting, Sports Lighting & Electrical Service work. Additionally, estimated Creedmoor Psychiatric Center, New York Psychiatric Center & Coney Island Hospital Lighting Replacement Project.
Estimated prevailing wage, PLA Union (DASNY NYCCT NAMM Hall Entrance Project) & Open Shop Labor type project like Brooklyn Lab. Charter School etc with cost estimated budget and accurate scope of work analysis.
Providing a pinpoint bid to get awarded job with quality control & assurance.
• Create Template and database for existing As-Built record drawings in PDF and DGN format for Design Build C-40853 Fire Alarms Systems Replacement (21 Stations) and Integrate CCure 9000 Server Upgrade to Central Alarms Monitoring System
(CAMS) Head End Facilities (RCC, BRCC, 2 Broadway, 2020 Broadway, Northern Blvd Queens) and coordinate with Architectural, Structural, Communications, Electrical, Mechanical, Instrumentation & Control, Signals Rooms Access, Environmental, Telecom & Data provisioning group (PSLAN info, Access Nodes and Application Nodes Configuration) to gather drawings in PDF format for awarded design builder
• Attend Job Progress Meeting and monitor project challenge and assist design builder and system integrator for CAMS Head End Testing & Commissioning
• Coordinate with MTA C&D operating agency staffs to ensure necessary actions, approvals and resources are in place to support project delivery
Specification Writing
REFERENCES
SKILLS
EXPERTISE
Senior Electrical Estimator/ Project Manager
Cole Electric Corp.
219-05 Merrick BLVD, Laurelton, NY-11413
Estimated and managed job site NYCDEP (Kensico Reservoir Shoreline Stabilization), estimated & supervised MTA (LIRR Murray Hill Station, NYCTA 57th Street ADA Elevator Install), NYCEDP (Pier 42 Temporary Electric Work), 15 Hudson Yards (Local 3 Union) project- (Low Voltage System Wiring), 103-105 Corporate Park Drive Projects- Open Shop Labor- $10M worth type projects and analyzed different aspects of scope of work
Scrutinized ins and outs of lowest bidding projects and compared supplier’s material quote for cost savings.
Inspect the Job Site, Field Co-ordination with Con Ed and request for DOB final inspection and sign-off and close out the project
TECHNICAL SKILLS
Microsoft Office- Word, Excel, Power Point, Access, Front Page, Outlook
Programming - C, C++, MATLAB, Hyperlink
Design & Drafting: DSCH, Auto CADD-Electrical & Architectural, Revit Works
Estimating Software-ConEst Intellibid, Accubid, On Center Take off, Electrical Bid Manager
Site Safety Training- OSHA 30 Hrs, Basic Firestop Training, MTA Track Safety Card, PMG 123, Certified Project Management Professional Training from PMI, Systems Analysis and Requirements Analysis, Software Development Life Cycle (SDLC)
August 22, 2017- February 2019
Construction Management Certificate (Regional Alliance for Small Contractors- By Pace University) Sponsored by Port Authority of NY & NJ
Contracts for Construction: Significant Considerations for Owners & Contractors
(Oliver Kinross Ltd.)
Procore Certified Engineer & Project Manager
Product Design in Emerging Technologies (New York University)
Site Planning and Modeling for Architects- Vectorworks, Inc.
Commissioning and Start-Up
Integrated Data Environment & the AEC- The Evolution of Project Communications and Information Management (AIA)
Overcoming Underground challenges by integrating subsurface utility investigations with BIM Modeling
Streamlining Workflows for DATA Driven Documentation
Sustainability in NYC: Update on Local Law 92 & 94
Design & Quality Materials in Building for the Future
Certified Quality Control and Assurance Professional
Business Analyst (Agile IT Tech)
Fire-stopping and Conduit Sleeves Penetration (Rectorseal)
Project Management: Solving Common Project Problems
Primavera P6 Essential Training
Certified DOB Site Safety Supervisor (Able Safety Consulting)
Leveraging Visual Data With BIM
Leveraging Scanning Technology to Build the Helm Lean and Mean Way
The future of Multi-family Design: Creating Healthy & Safe Living Spaces in Urban Areas
Sustainability and acoustical considerations for Healthy Interior Design
Connecting Design & Build Teams across multiple software solutions in a project's Digital Life cycle
A Reality Capture Overview; Leveraging 360' Photo capture and LASER Scanning Together
LICENSES & CERTIFICATIONS