Post Job Free
Sign in

Project Manager Construction

Location:
Victoria, Laguna, Philippines
Posted:
March 19, 2025

Contact this candidate

Resume:

REYMUNDO SONGUAD JR

OPRATIONS MANAGER

095*-*******, 093*-*******, 092********

PROFILE

A Construction Project Manager with

over 25 years of experience with all

stages of Construction both horizontal

and Vertical, bridges, roads and Steel

Fabrication and Erection. A QMS

certification and practicing Lean six

sigma in Managing the projects.

Seeking to continue growth by

implementing construction prowess in

management to become the top -

level Construction Manager

CONTACT

PHONE:

095*-*******, 092********

EMAIL:

****************@*****.***

SKILLS

Construction Project Timings and

Delivery 95%

Large scale and high budget projects

95%

Residential Construction – 95%

Commercial Construction – 95%

Leadership Skills 95%

Problem Solving 95%

Projects Scheduling 95%

EDUCATION

UNIVERSITY OF THE EAST

1988 - 1995

BSCE

Relevant Course Works – Principles of Construction Management, Total Quality Control, Construction Safety, Construction Estimating and Scheduling, Construction Planning and Control

WORK EXPERIENCE

BOOMETRIX DEV.CORP – Construction-Operations Manager Construction of Roads, Bridges, Government Offices and Tourist Building July 15, 2023 – March 15, 2025

Project involve:

• Construction of Road Magsaysay – Siargao

• Construction of Brgy. Road, Gen Luna – Siargao

• Construction of Tourist Bldg. Gen. Luna – Siargao

• Construction of MPIC Bldg. del Carmen – Siargao

• Construction of Additional Diving Area1&2, Sugba Lagoon – Siargao

• Construction of Retaining walls and gabions, Sta Monica, Siargao

• Construction of FMR – road, Marbel, Matalam North Cotabato

• Construction of Open Canal, road Widening of Lampayan Sta Maria road – North Cotabato.

• Road Widening 7KM, Marbel to Sta Maria

• Construction of Bridge

o San Isidro, Osmena, Zamboanga del Norte

o Biayon Bridge, Osmenia, Zamboanga

o De Venta Bridge, Osmenia, Zamboanga del Norte

• Construction of Elevated water Tank, water Treatment Plant and waterline system - Siargao

CCDC - Project Manager

INTERIOR FIT-OUT – Call Center Offices, Coffee shop kiosk, Laboratory for hospital and Office

July 15, 2022 – May 30, 2023

SEMINARS ATTENDED;

• Preventive Maintenance –

Mandarin Oriental Manila

• Construction

management – University

of The Philippines, Diliman

QC.

• RT/UT Seminar – University

of the Philippines

• ASME – Accreditation

Seminar – Bay Laguna

• ISO 9001, 14001 & 18001 –

Ortigas Center

• First Aide Application

Seminar – Tektite Tower

• ESH Training Seminar –

Tektite tower

• Project Monitoring & Cost

Control – Forth Bonifacio

• SAP Application –

Lancaster Hotel

• LEED Application (Green

building)- Singapore

• Leadership and

Management Training –

Astorgia Plaza, Ortigas

• Lean Six Sigma –

Lancaster Hotel, Meralco

• Service Excellence –

Ortigas Center

• Total Quality Assurance/

Total Quality Control –

University of the

Philippines, Diliman QC.

• Basic Communication

Skills – Miescor Office,

Renaissance Tower 1000

• Basic Presentation Skills –

Miescor Office,

Renaissance Tower 1000

• Basic Writing Skills –

Miescor Office,

Renaissance Tower 1000

• Basic Management Skills –

Miescor Office,

Renaissance Tower 1000

• Loss Control Management

• ISO 9001 : 2015

Certification

• WSO-Safety Passporting

Project Involve:

• Interior Fit-out for Hospital laboratory and Offices – Saint Lukes Medical Center

• Call Center Offices for O360, - 10th floor SM, CDO

• ZUSS Coffee kiosk – SM Makati

• ZUSS Coffee Kiosk – SM – Bicutan extension

PDI - Project Manager

ELECTRICAL CONTRACTOR – Transmission line, BESS Plant, Substation & Solar Power Energy

October 2020 – June 15, 2022

Key qualifications and Responsibilities

• Manage diverse team of workers, tradesman and general roles

• Planned, coordinated, budgeted and supervised the construction project, including build out, Safety and Quality

• Monitored construction projects on site and make a daily decision about the construction activities.

• Coordinating, meeting with the client

• Ensure that all the materials, equipment and manpower is controlled.

• Meet all the construction deadlines on time and cost efficient

• Prepare weekly, Monthly and Yearly report to the Operation and Management.

• Ensure and adhere Quality and Safety at all time. ILO construction - Project Manager

May 2018 – March 2020

Key qualifications and Responsibilities

• Manage the project with Lean six sigma approach

• Ensure that QMS is maintained

• Assisted all the trades, workers, supervisors, engineers and all tradesman of the project

• Ensure that all the delivered equipment, materials is within the approved specifications

• Drafted plans, blue prints and proposal for all trade engineers, safety directors and local government bodies

• Ensure to prepare Variation Order to all works that is not part of the approved IFC/AFC.

• Monitor all daily activities of the Project

• Comply with all the government requirements as stipulated in ISO 14000 and 18000

BETONBAU Philippines – Project/Plant Manager

May 2017– May 2018

Key qualifications and Responsibilities

• Plan and Develop the Project Idea. Every project starts as an idea.

• Create and Lead Your Dream Team. ...

• Monitor Project Progress and Set Deadlines. ...

• Solve Issues That Arise. ...

• Manage the Money. ...

• Ensure Stakeholder Satisfaction. ...

• Evaluate Project Performance.

• Ensure to supply all the pre-cast/Structural steel requirements of all project delivered JIT

• Manage the Operations of the Batching Plant

• Strictly implementation of IMS requirements

WORKING KNOWLEDGE;

Foundation analysis, Standard

Penetration Test, Field Density Test,

physical Property Test of Concrete

Aggregates Material and Laboratory

Testing of soil samples, Tower Erection,

Stringing works, NDT works and analysis

(RT,UT,MT), WPQT, WQT, ASME & ISO

9001:2008, ISO 14001 and 18001

standards, SAP, Waterproofing and

Precast System, Work Process and

Procedure Preparation for ISO

Certification of ISO 9001:2015.

PERSONAL DATA:

Nickname:Reymund

Provincial Addresds: Belmonte st. San

Andres Catanduanes

Date of Birth: October 23, 1971

Place of Birth: San Andres

Catanduanes

Sex: Male

Civil Status: Single

Age: 53

Height: 5’5”

Weight: 62 Kgs.

Religion : Catholic

Language / Dialect: English, Filipino,

Bicol, Cebuano, Ilongo

MIESCOR – QA/QC Head

January 2016 – May 2017

Key qualifications and Responsibilities

• Ensure the proper implementation of Quality Policy of the company

• Prepare the Quality Plan

• Strictly implementing the approved ITP

• Control of Documents as required by the IMS

• Help maintain the quality of all project deliverable DDTKI – Operations-In-Charge/QA/QC-Head

January 2010 – December 2015

Key qualifications and Responsibilities

• Gathering requirements, deliverables, and timeframes from stakeholders.

• Agreeing on priorities with clients.

• Planning your resources.

• Creating project plans.

• Communicating key milestones.

• Communicating your project plan internally and with the client.

• Preparation of Process and Procedure for the Precast Plant Managing four Fabrication plant

o Calamba Plant, production output capacity

of1000sq.m/day

o Antipolo Plant, production output 300 sq./ day

o Cebu Plant output 300 sq./ day

o Tanauan Wet Circulating and Dry Batching Plant

• The key responsibility of a project manager includes planning. The project manager needs to define the scope of the project and develop a project schedule accordingly. In general, when a project manager is planning the activity, it is important to target the activities effectively to do less but well.

• Adhere to safety Policy of the company.

WORKING OVERSEAS

AMC Protection – QA/QC Head

March 01, 2010 – December 2010

Key qualifications and Responsibilities

• Ensure to implement as per approved drawing

• Control of non-conforming products

• Ensure to implement the approved ITP

• Helps prepare the Quality Plan and Procedure

• Control and minimized material wastage

• Deliver the project with quality JIT

RASANA GROUP FZC – Operation/Factory Manager

November 2008 – February 2010

Key qualifications and Responsibilities

• Ensure the availability of all the Raw Materials is available at Factory

• All Materials comply with the specifications

• Availability of workforce

• Adhere to safety policy and Quality Standards

• Ensure to provide all structural steel requirements of all project site

• Coordination/meeting with the client requirements and Reports

• Ensure that all the workforce comply with the WPQT requirements as required by the client.

• Control the production cost

• Minimized excess materials using CNC cutting machine (water jet) REYMUNDO SONGUAD JR.

NIPPON STEEL – Fabrication Head

April 2007 – October 2008

Key qualifications and Responsibilities

• Ensure that the Fabrication, pre-assembly is readily available JIT

• Ensure that the worker passed WPQT

• Adhere to JS and British Standards

• Ensure documentation requirements check and pass the required testing prior to delivery

• Adhere to the approved ITP from Raw materials, fabrication, Painting and delivery.

• Records and documents must comply with the required checklist

• All quality test check prior to delivery.

LOCAL EMPLOYMENT – WORK ENTRY

FIRST PHILIPPINE BALFOUR BEATTY

November 1995 – March 2007

Position Holds;

• Civil Supervisor

• Project In Charge

• Owners Representative

• QS/Chief Estimator

• Production Planning and Control

• Production Engineer

• Structural Fitter2



Contact this candidate