Teresa Donnell Bretherick
St Joseph, TN 38481
256-***-**** Mobile
*.**********@******.***
Summary/ Introduction:
Experienced as a Master Project Engineer, Project Manager, Master Planner/Scheduler, SCRUM Master, Agile, CPM, PMP able to lead a large teams of client in-house planners/schedulers and contractors through work processes for efficient streamline of the management of EPC, Maintenance and Modifications projects. Bachelor of Science EE, Six in the midwest Sigma Blackbelt and SCRUM Master. Experience with CMMS database operation & integration of SAP, VBA, BI, JD Edwards, Maximo, Empower, PRISM, Microsoft Project, Micro-station, Access, AutoCAD, Project Wise, Timberline, SAP, P2, PeopleSoft, DelTek OPP, COBRA, Jira, Kanban, OPPM and Primavera Professional EPPM planning databases with cloud interface.Head establishment of PMP & CMP certification, Unifier, BI Publisher,PERT, for Nuclear power, petroleum/Chemical & Cogeneration, Merchant Gas plants, Automotive, Manufacturing, Renewable Energy,EVMS Aviation,CMMS CPM, ISO certification, FIDIC contracts for large capital. Wrote procedures for PMO and trained personnel in execution. Established change management program. Worked with direct-line management and worked with field supervision personnel during planning, execution of projects (cradle to grave project execution).
Leaded multi-craft crews in multiple sites in both National & International projects experience in systems related areas of CMMS, procedure writing, planning, estimation, scheduling, budget controls, supervision of field engineering, installation and commissioning of power industry- (nuclear, cogeneration, combined cycle, fossil, hydro,) transmission, DOT, DOD, DOE, DLA, NSA, EMP, commercial and industrial experience. That includes construction, General Contractor, GC, Project Manager, CM, estimator, site procurement/purchaser, development, commercial, heavy, highway, civil, HCSS, heavy bid, estimator, utilities, data centers and third-party analysis. Field engineering in disciplines of structural, mechanical, electrical and instrumentation; performing maintenance, capital, modification, green field projects and change request work orders. Excellent verbalization and organization skill- Expert as architect of all Oracle databases like Unifier, P6, Team and companies established procurement, cost, company resources and reporting platform for KPIs.
Education University of Alabama Huntsville-Huntsville, Al EE BS 12/ 1986
01/2024 till 5/24 Fluor- AM/NS EAF Capital Planning SAP & P6 database EAF covert electrical contracts from lump sum contracts to fully resource loaded T&M contracts.
05/04/ to 12/23 Daikin Petrochemical Capital & Outage Planning SAP & P6 database PMO set-up data base Architect
11/22 to 03/23 Evonik Petrochemical Outage Planning SAP & P6 for a plant outage
10/30/19 to 10/12/22 Airgas Air Liquide Merchant Gas-Production Maintenance Zone Planner/Scheduler for 75 plants preventative maintenance, plant shutdowns (both planned/unplanned) and corrective maintenance. Responsible for RFQ generations, award, and closeout. SAP Planning, Primavera v21.1, Microsoft Projects. BI
10/8/18 to 10/8/19 Johnson Service Group TVA Assisted in building P6 client and web scheduling program for Environmental Compliance for transmission, generation, river and land management. CCR compliance, maintenance, and capital projects.
3/01/13 to 10/8/18-The S3 Group Inc.Owner /Master Scheduler/Project Engineer- capital projects, outages, and maintenance. Assist on design master templates of workflow for various clients’ consolidation of asset management, cost tracking and earned value management programming, and audit specialist. Clients included US Corp of Engineers Wolf Creek Dam, NRG, Alstom Power Services, Metro Nashville Airport Authority, TDOT, ALDOT, Corp of Engineers-US Board of Corrections-US Audit Team Lead and just a few contracts (Complete list upon demand on statement of work for company profile depending on clearance)
US Corp Engineers Wolf Creek Dam & Power Generation- Dam repairs and Hydro Turbine Generation Upgrades.
East Kentucky Power Coop in Generation Architect Primavera P6 linked with OPPM scheduling/resource load/cost loaded capital tracking and reporting system 9 plant Fleet. CTG/Fossil/Solar/Biomass/ Hydro facilities
PEPCO/EXELON Power Distribution & Transmission smart grid PLC relay upgrades new switchyard construction.
GDIT Google Fiber P6 Client, Web Interface, BI reporting, and master templates for compliance of Google specifications.
Alstom Power scheduling and conversion of Microsoft Project plans to P6 resource and cost loading.
NRG-Homer City 3-Outages for 1,884-MW coal-fired power plant
Provided a team for independent project accountability audits to protect the stakeholders at various Capital projects for private sectors and federal prime contracts with government agencies.
NTE Master Scheduler/Senior Consultant for a Turnaround using P6-8.2 with WEB and BI publisher reporting. Assist on design master templates of workflow for various clients’ consolidation of asset management, cost tracking and earned value management programming.
02/13/12 to 2/2013- P&B World-State of Tennessee Master Project Controls Engineer establishing Primavera 6.7 Oracle/Citrix/Web interactive scheduling and cost management program for all Capital projects for the State of Tennessee. Transportation, Education, Infrastructure, Parks, Waterways, Energy, and Correction are just a few of the listed agencies of the state that are tracked, approved and executed through the SBC legislative approval. Established PMO 28 project management team, procedures and training program.
NOTE: WORK FROM 2006 TILL 2012
DURING THIS TIME MY HUSBAND WAS RECOVERING FROM INJURIES HE RECEIVED IRAQ THE END OF 2005 WHILE DEPLOYED IN THE NATIONAL GUARD. I COULD ACCEPT AND WORK JOBS AWAY FROM HOME SHORT WORK PERIODS SO I COULD ASSIST WITH HIS RECOVERY BUT STILL BE ABLE TO PROVIDE FOR MY FAMILY.
10/03/11-01/3/12 Spencer Reed- Shell Canada Stafford Chemical & Refinery-P-6 training of schedulers in preparation for GSAP conversion of Shell Americas
07/11 till 8/11 Bull Run TVA-P-6 Scheduler during the set-up & conversion to P-6 daily maintenance scheduling
02/11 till 5/22/11 Genoa-Keystone Power Station-Unit 1 Fossil Outage-Primavera 6.7 & SAP & Seward Power Station Outage
08/10 through 12/03/10 ADM-Decatur IL-Capital Project CO2 Carbon Capture Sequestration DOE Project-Primavera 6.7-Maximo scheduling, planning, cost controls, set-up Primavera 6.7 server database and built master schedule using EAM for DOE reporting.
04/15/10 till 05/22/10 Proenergy-Sindoor CVG Puerto Ordaz, Venezuela GE CTG new construction Primavera 6.7 & Microsoft Project Schedule and performed field Engineering and the Project Manager duties.
01/15/10 till 04/02/10 Allegany-Siemens-Harrison Power Station-SAP-Maximo-Primavera 6.7 also Performed Field Engineering, Cost Engineering, Project Manager duties and start-up.
08/3/09 till 10/30/09-ProEnergy-Siemens-PPL Brunner Island Unit 2 Turbine Outage-Lead Scheduler/Planner using Passport and Primavera 6.2 also Performed Field Engineering, Cost Engineering, Project Manager duties and Start-up.
6/8/09 till 6/28/09-ProEnergy-Panama City, Panama-Fast Start-up Manager & Commissioning 2 GE H-1000 Diesel CTG simple cycle, also performed Field Engineering, Cost Engineering, Project Manager duties and Start-up.
04/09 till 05/09 Private contract TVA Kingsport Coal ash spill master plan in compliance with NEPA and state ordinances
11/17/08 till 3/23/09- Intergern 4-unit Combined Cycle power generation
Field Engineering design, Project Controls and the Project Manager duties, Planner/Scheduler/Cost Engineer-Set-up workflow process between planning/scheduling and cost management, integration of JD Edwards for scheduling and effective cost management.
7/08/08 until 11/5/08- Sunoco Toledo Refinery Coker Expansion-Master Scheduler/Planner-Passport-Primavera
2/04/08 until 6/27/2008-Dynegy-Plum Point Arkansas-Project Controls Engineer
New Fossil 750 megawatt Arkansas & Texas-Set-up New Citrix Network for Primavera 6.1
12/03/07 until 1/27/08-Marathon-Set-up Primavera-p6 Citrix Network-Training Personnel and certification in Primavera. Integration of work order and cost programs with primavera.
8/20/07 until 11/21/07 -Energy-NRG Big Cajun 2, Fossil
Unit 3 Outage-Master Scheduler P-6 & Cost Engineer using P-6 and MAXIMO. Set-up interfaces and configured Energy project controls and certified employees in the use of databases.
4/18/07 until 7/28/07- Chevron El Segundo, CA Refinery Coker Expansion Turn Around. Master Scheduler Primavera Enterprise 6 integration of Passport-SAP integration and tested program during Coker expansion. Line-Dale GE Co-Generation Plant construction master schedule clean-up, set-up of schedule reports for progress and cost GE during transition of main contractor. Monitor schedule during Chevron schedule integration.
1/15/07 to 3/12/07-Siemens Orlando office- Master Scheduler Primavera Enterprise 6 and Passport –SAP integration for the GEN-Power Longview Coal Power Plant- Fossil Greenfield project, performed field Engineering, Project Controls and the Project Manager duties.
8/28/06 to 11/22/06-Chevron Pascagoula Refinery-Master Scheduler P3e-5 Passports-SAP integration and tested program during FCC turnaround expansion.
02/02 until 5/22/06 Browns Ferry Nuclear Plant TVA
Senior Construction Engineer – Corporate Master Scheduler
Electrical, Instrumentation, Mechanical Work Planner Writer/Scheduler/Procurement Preliminary analyses of data were guidelines that were provided in such areas as system controls, electrical, instrumentation, and mechanical. Scheduling, procurement of materials and planning based own design modification for Facilities & Unit 1 Computer databases- SAP, EMPAC, Passport, Access databases, Passport, Micro-Station,
05/99-02/02 XM Satellite Radio Washington, DC
National Project Manager Engineer Director/VP
Project Controls-P3e/c scheduling, contract negotiations and directed national build-out. Build 120 studios with uplink for satellite. Work with Bowen on construction & launch of satellites.
National Project Manager-Managed two-construction management companies 500 employees. P3 planning and was certified to instruct others in the use of P3/e.
01/87-4-/99 Multi-Industrial Projects US Working as a fulltime employee of Westinghouse.
Electrical and Instrumentation Engineer performed field Engineering, Project Controls, and the Project Manager duties.
Below is a listing of the shutdowns, outages. Performed analyses and development of documentation/reports of technical tasks in SAP. Planner/Scheduler, Site buildouts, Budget analysis and handling negotiations of purchase of equipment and contracts.
NUCLEAR/FOSSIL PLANTS While employed with Westinghouse I worked at the following Plants:
04/87-09/87 Grand Gulf Westinghouse System Engineer Mechanical, Instruments and electrical planning
09/87-02/88 FERMI II Westinghouse MSR and Turbine Outage TFA System Engineer Flows and Controls
03/88-02/89 Turkey Point/FP&L Westinghouse Steam Generator Replacement-Instrumentation Controls TFA System Engineer
03/89-08/89 North Anna-Virginia Power -Steam Generator Outage-Generator Coordinator/ TFA System Engineer
09/89-12/90 Sequoyah TVA/ Generator/Turbine & Eddy Current outage
01/82-02/87 BFNP/Power Service /TVA Browns Ferry Nuclear Plant-Instrumentation-Unit 2 outages and Rebuild-Unit 1 & 3 maintenance. ISI walk downs controls and flows. Colbert Fossil and Power Service Instrumentation.
Chemical Paper Products
12/90-01/92-Champion Paper Mill- System MCC Electrical Engineer of the 35 Paper machine.
OIL REFINERS/CHEMICAL below are the list I was assigned to work:
01/92-4/94 Exxon Westinghouse TFA System Engineer Capital Projects
Below is list of projects:
Exxon- Shell- BP- New Orleans-Baton Rouge- Chemical Plants & Refineries
Division-PM PE Direct supervisors for Mechanical, Civil, Structural,, E&I. Performing the following: Routine maintenance, preventative maintenance -capital projects..
Exxon-Baton Rouge-Tank Farm TDC-3000 digital Controls-Tech Project Engineer
Exxon-Baton Rouge-Main Refiner TAR-/Coker Unit
Shalmed- Chemical Plant-PM of controls and motor control center