PO BOX ****
Abbeville, LA *****
Cell: 337-***-****
Email: ********@*****.***
Chris Gross
Thank you for the Opportunity
Compressed Air Emergency System CAEBS Health Awareness HEAW
Basic Offshore Safety Induction and Emergency
Training SAF01
Integrity Code of Conduct ICOC
Abrasive Wheels Awareness COAWT Lock out Tag out Awareness LOTO
Working at Height Awareness COHEIGHT Personal Protective Awareness PPEC
Cyber Security Awareness CSA Pioneer Together PT
Dropped Objects Awareness DROP Permit to Work Awareness PTWA
Environmental Awareness EAT Hazardous Substance Awareness SAF200
Eye Injury Prevention EIP Manual Handling Awareness SAF215
Hot work Awareness SAF26 Bosiet Safety & Emergency Training Holland
First Aid Pro+ CPCWHS1001Prepare Veriforce Pipeline Training
Dutch Offshore Operator’s Association (NOGEPA) Bideltoid Measurement Proforma
Seaman’s Book Allseas 003 Rish Awareness Solitaire
STC NEXT Escape Chute Training (NOG OLF) SECOR Fusion Training
Dutch Offshore Operator’s Association (NOGEPA) OQ Certification for CenterPoint DOT & VeraForce OQ for TC Energy & Kinder
Morgan
OPITO Basic Offshore Safety Induction and
Emergency Training (BOSIET) with Emergency
Breathing System (EBS)
American Traffic Safety Services Association
ATSSA DOT Safety Training
ABC Welding School Lake Charles ExxonMobil: In-service Test Certified
Abnormal Operating Conditions related to Welding on Pipelines, Monitoring of
Welding Processes, Permanent Field Repair by
Grinding & Visual Inspection of Welds not Non-
Destructive Tested
2018 Falck Safety Services Compressed Air
Breathing System (CA-EBS) initial
Deployment Training 5902 OPITO Approved.
2018 Falck Safety Services Further Offshore
Emergency Training (FOET) 5858 OPITO
approved (including HUET AND EBS)
Republic of Malta/Seaman’s Record Book. The International Convention of Standards of Training, Certification and Watch keeping for Seafarers (STCW). Working in multiple countries and traveling the world offshore and onshore I worked with many different cultures. I have actively supervised and coordinated activities of workers engaged in welding, fabrication, and quality control. I have also inspected our welder’s product to ensure full compliance with the company’s policy and procedures. I have worked many roles, from welding, inspector, foreman, supervisor and most of all a leader with the safety. I received the
Certifications & Skills
Oversee staff, hiring, discipline, and safety issues for a welding/pipeline department Schedule production activities and maintain inventory to increase production and quality. Review P&ID’s, Schematics, plot plans, and safety flow diagrams.
Set maintenance schedules, equipment tolerances, and ensure a safe operating environment Plans, coordinates, and supervises the activities of team members to meet production schedules. Quality inspections on various equipment for pipeline, and facility builds. PO BOX 1280
Abbeville, LA 70511
Cell: 337-***-****
Email: ********@*****.***
Chris Gross
Thank you for the Opportunity
Duke Conoco Philips (DCP) Welding Certification, EOG Welding Certification, Denbury Welding
Certification
ASME 1104 Certified, B313 Severe Classes,
Automated Welder & Stick Rod. Master of
steam of motor vessels
ISN Networld ID06225593
January 2024 – June 2024
Tuxpan Project – IEnova Subsidiary of Sempra
Energy Veracruz Mexico
Automated Welder
October 2023 December 2023 Welder Foreman / Welder Kakivik Caymus Fuel Storage Facility Darwin Australia January 2023 – September 2023 Welder Foreman
Baker Montana & Bowman North Dakota - Audubon Companies Carbon Capture Compressor Stations for Denbury. Small bore fabrications, structural fabrications, and assisted with coating pipe. Aug 2022 – December 2022 Welder Foreman
PECI Black Hills – Marshal Ridge RNG Project State Center, Iowa Energy Transfer Pump Station – Natchitoches, LA
November 2020-August 2022 PECI Superintendent
Installing gas lines throughout inner-city gas - steal & poly-pipe. Coordinate subcontractors, review plans, P&ID’s, schematics, PSSR, MOC’s. Oversee crews and review toolbox safety meetings. Center Point Energy Company Opelousas, Louisiana
PECI Welder/Fabrication for Compressor Station
Kinder Morgan “Acadian Project 760” Eunice, Louisiana Red Mountain 2010 Project for TC Energy - Enterprise, Louisiana June 2020-October 2020 Lead Welder
RT Ellis Corpus & Midland Texas
Weld on multiple lines from 36" to 1". Also, fab the pipe for oil storage tanks for Plains Marketing. July 2019 – May 2020 Welder
MG Dyess – Oklahoma Sunland Construction – Louisiana MK Construction – Texas Venture Global Gas Company w/WHC – Louisiana PO BOX 1280
Abbeville, LA 70511
Cell: 337-***-****
Email: ********@*****.***
Chris Gross
Thank you for the Opportunity
All Seas
Automated Welding Operator (Phoenix) gas-metal arc (GMA) or flux-cored arc processes for welding offshore pipelines of 6 in. OD and greater
o July 15 – Scheduled to test in Amsterdam for TVO Projects – Chevron (Tamar & Levathan) o 2024-Tuxpan Project – IEnova Subsidiary of Sempra Energy Veracruz Mexico o 2018-Nord Stream 2 AG/Nord Stream 2/Baltic Sea for Pioneering Spirit, Solitaire, Au Dacia, Calamity Jane, Fortitude and Oceanic Lead Welder: Largest pipeline installation scope in Allsea’s’ history; installation of approximately 2300 km of 48-inch pipeline o 2017-2018 South Stream Transport B.V./Turkstream/ Black Sea for Pioneering Spirit and Audacia Pipe lay job is a dual 940-km 32-inch pipeline through the black sea from Russia to Turkey. Depths reach 2200 m. Total length of pipe laid 1802 km
o 2015-2016 Statoil/Statoil/Polarled/Norwegian North Sea for Solitaire Installation of 482km, 36-inch pipeline
o 2013-2014 Petrobras/Rota 3/Brazil/Santos Basin for Calamity Jane, Solitaire and Lorelay Installation of 143 km, 24-inch pipeline and 155 km, 20-inch pipeline o 2011-2012 Noble Energy/Noble Energy Tamar/Mediterranean Sea/Offshore Israel for Solitaire, Audacia, and Calamity Jane Fabrication pipeline crossing supports and all pipeline structures o 2011 RWE Dea/UK SNS Limited/RWE Breagh A/North Sea for Lorelay, Tog Mor, Calamity Jane Above water tie-in operations of 20 inch and 3-inch pipeline