Post Job Free
Sign in

Data Center Communications Manager

Location:
Washington, DC
Posted:
March 11, 2025

Contact this candidate

Resume:

Rahsaan K. Midget

**** ********** ***.

Baltimore, Maryland 21207

Cell 443-***-****

***************@*****.***

Education:

Baltimore community college (BCCC)

*/**** - */****

Associates degree: computer science.

I'm Still Standing School Of Technology (ISST)

12/2023 - Present

●In preparation to obtain compTIA certification, Network+, Security+.

Safety Certification:

●Obtained OSHA 10 certs.

●OSHA 30 in progress

Qualifications Overview

Cisco Call Manager VOIP

●Proficient in: Cisco Call Manager, VOIP, Configuring Cisco Routers and Switches

●Install and Upgrade

●MonitoringCisco Unified Communications Manager IM

Mobile Access and DAS

●Installation of mobile access, BDA, remote, donor antenna and DAS (Distribution Antenna System) Omni and directional antennas. Also able to test with Anritsu tester. Also Andrew connects male and female. Proficient in running air rated coax cable.

Data Center Experience

●Responsibilities, Troubleshooting ESXi hosts and Virtual Machines, HP Server Hardware and support.

●SAN infrastructure Experience HP XP24000, HP Left Hand Onboard Administration and Virtual Connect

● Also, build out Data Center Hubs, which included the following;

●Installed Rack Switches (RSW), Fabric Switches (FSW), Cluster Switches (CSW).

●Installed Intermediate Distribution Frame (IDF), Main Distribution Frame (MDF), MTP OM3 and OM4 Cartridges and Fiber

●Relocates cable drops, Terminates of Rj-45 modular

●Install and Test Single Mode and Multimode

●LC and SC connector and Cartridges

●Build out Ladder Rack, Mounted switch Racks and Fiber Trays

●Test with Fluke DTX 1800

Cabling Skills includes

●Fiber Optic and Fiber Termination, Cat-5, 6 and 7, Terminating 110, Blocks, also Patch Panels and

●Pulls and terminates all counts of Fiber and copper. Establishes grounding systems.

●Relocates cable drops, Terminates of Rj-45 modular.

●Reads and understands blueprints and floor plans, Tests fiber and copper, Ensures compliance with codes.

●Review cable pair and jack assignments for all telephone lines in the MDF Room and Telephone Closets.

EXPERIENCES;

Bomark /Electric

Telephone Tech

7/2024 - Present

● Installing data//voice cables, cameras, WAPS, (wireless access points), coax, DAS (distribution antenna system), fiber optics.

Morgan Stanley

Logistics/Shipping and Receiving Clerk

5/2023 - 6/2024

●In-charge of all in-bound and out-bound mailing for morgan and stanley department of data center.

●Responsible for the up-keep and arrangement of the warehouse and its items such as devices, servers, routers, racks and other items synonymous to the daily operations of a data center.

●Shipping and receiving and the logistics of all mail was a daily function for Morgan and Stanley's operations.

FEMA HEADQUARTERS (Mt. Weather Va.)

Focus Technologies

1/2022 - 4/2023

Foreman /supervisor

●Responsible for running and supervising a 7 man crew, overseeing the operations of multiple cable installs, MDF /IDF: telephone closet build-outs and location drops.

●Terminating, 48 port patch panels, and all location drops. Terminating and testing 12 strand fiber optics.

●Installations of security cables for keypads, motion sensors, door detectors, and inside/outside cameras. Installed cat 5, cat 6 coax, fiber and backbone cabling.

●Testing was conducted with an Aritsu fluke tester for accuracy and continuity.

●Safety meetings and toolbox talks were conducted every week planning for the next work day. Schemes were reviewed at the end of the day to plan for next day work load.

Federal Isis building

Outsource staffing agency

9/2020 - 8/2021

Cable installer

● Installed fiber optics cables, 12 strand multi and single mode, (Gis) Geographic Information System cabling, cat 5e-6a data cabling, coax and security cables.

Wal-Mart

Verigent

10/2018 - 5/2019

Installer for Security Camera and Secured Systems

●I Installed Security Camera, Monitor, Credit Card Machine Reader and Kiosk.

●I ran Cat-6 and Fiber cables

●terminated and dressed throughout infrastructure

●tested/certified cable with Fluke tester.

●Forklift Certified

KCI LLC

Facebook Data Center

Run Ops Technician

Ashburn Va.

11/2017 - 9/2018

● Also, build out Data Center Hubs, which included the following;

●Installed Rack Switches (RSW), Fabric Switches (FSW), Cluster Switches (CSW).

●Installed Intermediate Distribution Frame (IDF), Main Distribution Frame (MDF), MTP OM3 and OM4 Cartridges and Fiber

●Relocates cable drops, Terminates of Rj-45 modular

●Install and Test Single Mode and Multimode

●LC and SC connector and Cartridges

●Build out Ladder Rack, Mounted switch Racks and Fiber Trays

●Installed WAP, Humidifiers, Wire Mapping and labeling Fiber, Copper and Power Cord.

Hinkle & McCoy

Das Technician

Washington D.C

12/2016 -10/17

●Able to read blueprints ran DAS aerated coax cable.

●Installed Connector, Radios and splitters

●Installed Directional Antenna

●Help test/sweep systems after installation

NTC Mazzuca INC.

Annapolis, Maryland

Net100

North & Grumman

Cable Technician/Installer

5/2016 - 11/2016

●Installed Multi Mode and Single Mode Fiber, Installing and Terminating Rj-45 on Cat-5, Cat-6 Copper.

●Installed varieties of Net Boxes, Routers and Switches, made sure all devices Cabling both Fiber and Copper had proper continuity, also tested all cabling with Fluke DTX 1800 Cable Tester and saved results.

●I Also Installed Wireless Access Points (WAP), Humidifiers, Wire Mapping and labeling Fiber, Copper and Power. Worked closely with a team of engineers to ensure all required tasks were meant.

Verigent LLC.

TWD Technology

Andrews joint Air Force Base

Cable Technician

8/2015 - 3/2016

●Responsibilities, Installed Cat-6 Cable, Multi-Mode Fiber, used in IDF.

Single Mode 144 Ribbon Strand Fiber, Used in MDF for Back Bone Installation.

●Installed and Terminated Coax, Installed Speaker Wire, Speakers, Volume Control Switches and Amplifiers for Paging System.

●Build Out Closets, Terminated Copper on Patch Panels in Closet and at Station Jacks.

●Terminated RJ-45.

●Build and Install Racks in closets on site.

KCI, LLC

Comcast, Data Center

Data Center Technician

1/2015 - 5/2015

●Responsibilities included rack and stack building of bricks maintaining and configuring routers and switches.

●Wire and Blades and Port mapping, insured Copper and fiber connectivity to all devices, worked closely with a team of Engineers when closing out any troubled tickets.

CIDI, LLC

Virginia and Maryland

Cell Site Technician

9/2013–1/2015

●Responsibility was installing bCEM and RUC’s at Cell Towers for Verizon, AT&T, and T-Mobile.

●Also was responsible for supervising a team of 7 techs –shutting down, and upgrading sites.

●Coordinating the works sites, and work schedules for this team and ensured all upgrades were completed properly.

VDH Consultant

Wal-Mart Depart. Store

Baltimore MD.

4/2013 - 9/2013

Voice and Data Installation, responsibilities includes install of cat 5, 6 cables, terminating, punch downs and also installation of fiber optics, building out all racks and cabinets and all hardware associated with project

Johns Hopkins Medical Center

Shipping and Receiving Department

Logistics/shipping and receiving associate

10/2009 - 9/2012

●Responsible for all outgoing and incoming packages which included medicine, medical supplies, hospital machinery, etc.

● Riding pallet jack was used to obtain load and un-load supplies needed on a daily basis.



Contact this candidate